Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(6 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status April 9th, 2024 ==
== Yocto Project Weekly Status May 14th, 2024 ==
Current Dev Position: YP 5.0 M4 - Final Release <br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: 1st April 2024 YP 5.0 M4 build<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday April 11th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 16th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday April 9th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 14th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.3.4 is due to be released.
*YP 4.0.18 has been released
*YP 5.0 rc1 is now due to build when ready.
*YP 5.0.1 rc2 is in QA.
*All dunfell patches should have been sent now in preparation for an April 15 build. This will be the last release of dunfell.
*YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
*For 5.0, we are still hoping to switch the hash equivalence server before running the release build but that is the only remaining pending change. We do also still need documentation work for the release
*There are some CVE related announcements which are helpful to us:
*A new yocto-status mailing list has been created where we plan to send just the project weekly status reports and any other suitable updates on the project. This should help those who found the traffic of the other mailing lists too much.
**There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
*A yocto-patches mailing list has been setup and patches that used to go to the yocto@ list will be migrating over to this new list, making yocto@ a bit more friendly for questions and discussions. Information in layers is being updated to reflect this.
**CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
*We received some disappointing feedback from a key organization in the RISC-V ecosystem that the Yocto Project was not important and not worth funding. We will take this feedback into account.
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*The “Binary Distro” work is now well underway and there are PR Server passthrough patches under review. The wiki page has had a number of policy/process proposals documented, at least as a first pass. Help is welcome to help improve these, or highlight where further documentation is needed.
**Please consider signing this to show support for those changes.
*We continue to watch the NIST NVD (CVE database) situation, the recent update didn’t clarify much. Unfortunately there doesn’t appear to be a clear path forward as yet but using data directly from MITRE may help give partial information. These issues are making it hard to know what to include in the 5.0 release as it isn’t clear which changes are security related.
**Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
*The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
*Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 5.0. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.0_Unassigned_Enhancements/Bugs
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
Line 28: Line 34:
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''YP 5.0 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 5.0 M4 build date  2024/04/01
*WDD 2740 (last week 2720) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0 M4 Release date 2024/04/30
*OE-Core/Poky Patch Metrics
**Total patches found: 1128 (last week 1125)
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''YP 5.1 Proposed Milestone Dates:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Release date 2024-05-31
*YP 5.1 M1 Release date 2024-05-31
Line 43: Line 52:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.3.4 is released.
*YP 4.0.18 is released.
*YP 3.1.33 build date 2024-04-15
*YP 5.0.1 is in QA.
*YP 3.1.33 Release date 2024-04-26
*YP 4.0.18 build date 2024-04-22
*YP 4.0.18 Release date 2024-05-03
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 Release date 2024-06-14
*YP 4.0.19 Release date 2024-06-14
'''Upcoming Proposed dot releases:'''<br/>
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.1 Release Date 2024-05-24
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 5.0.2 Release Date 2024-07-05
Line 70: Line 72:
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29
*YP 4.0.23 Release Date 2024-11-29
'''Tracking Metrics:'''<br/>
*WDD 2696 (last week 2681) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1174 (last week 1173)
**Patches in the Pending State: 249 (21%) [last week 249 (21%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:38, 14 May 2024

Yocto Project Weekly Status May 14th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 4.0.18 has been released
  • YP 5.0.1 rc2 is in QA.
  • YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
  • There are some CVE related announcements which are helpful to us:
    • There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
    • CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • Please consider signing this to show support for those changes.
    • Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
  • Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 4.0.18 is released.
  • YP 5.0.1 is in QA.
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC