== Yocto Project Weekly Status June 6th, 2023 ==
== Yocto Project Weekly Status May 7th, 2024 ==
Current Dev Position: YP 4.3 M1<br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: 5th June 2023 YP 4.3 M1 build date<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday June 8th 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 9th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday June 6th 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 7th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.3 M1 is due to build this week
*YP 3.1.33 has been released
*The remaining issue with SPDX manifest generation on the autobuilder should have been identified and fixed so we plan to enable the create_spdx class by default in poky assuming a successful test build.
*YP 4.0.18 is due to be released
*The recent 6.1 kernel stable updates appear to be causing a couple of different intermittent autobuilder issues. We’re working to try and get to the bottom of that, we’re hoping further updates to the 6.1 series may pull in fixes for the regressions.
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*Patch merging has been slow this week as we struggled to bisect failures down to the problematic commits (potentially the sqlite version bump).
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*We continue to see problematic intermittent failures on the autobuilder. We’re struggling to make progress against these and they are feeling overwhelming. We’re open to ideas on how we might try and address them. Experience shows that if left unresolved/ignored, people do end up hitting them in real world usage or during testing of their own products.
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
*There are a number of patches still queued in master-next as it is unclear whether they’re ready for various reasons. For bandwidth reasons these will likely be deferred to M2, people are just stretched too thinly to do otherwise, frustrating as it is.
*The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
*Big thanks to Ross for helping look at the high number of CVE issues open against master.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: patchtest, layerindex, devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 4.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_4.2_Unassigned_Enhancements.2FBugs
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics  
*Help us resolve CVE issues: CVE metrics  
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
'''YP 4.3 Milestone Dates:'''<br/>
*YP 4.3 M1 build date  2023/06/05
*YP 4.3 M1 Release date 2023/06/16
*YP 4.3 M2 build date  2023/07/17
*YP 4.3 M2 Release date 2023/07/28
*YP 4.3 M3 build date  2023/08/28
*YP 4.3 M3 Release date 2023/09/08
*YP 4.3 M4 build date  2023/10/02
*YP 4.3 M4 Release date 2023/10/27
'''Upcoming dot releases:'''<br/>
*YP 3.1.26 build date 2023/06/19
*YP 3.1.26 Release date 2023/06/30
*YP 4.0.11 build date 2023/06/26
*YP 4.0.11 Release date 2023/07/07
*YP 4.2.2 build date 2023/07/10
*YP 4.2.2 Release date 2023/07/21
*YP 3.1.27 build date 2023/07/31
*YP 3.1.27 Release date 2023/08/11
*YP 4.0.12 build date 2023/08/07
*YP 4.0.12 Release date 2023/08/18
*YP 4.2.3 build date 2023/08/28
*YP 4.2.3 Release date 2023/09/08
*YP 3.1.28 build date 2023/09/18
*YP 3.1.28 Release date 2023/09/29
*YP 4.0.13 build date 2023/09/25
*YP 4.0.13 Release date 2023/10/06
*YP 3.1.29 build date 2023/10/30
*YP 3.1.29 Release date 2023/11/10
*YP 4.0.14 build date 2023/11/06
*YP 4.0.14 Release date 2023/11/17
*YP 4.2.4 build date 2023/11/13
*YP 4.2.4 Release date 2023/11/24
*YP 3.1.30 build date 2023/12/11
*YP 3.1.30 Release date 2023/12/22
*YP 4.0.15 build date 2023/12/18
*YP 4.0.15 Release date 2023/12/29


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2527 (last week 2522) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2720 (last week 2728) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1162 (last week 1160)
**Total patches found: 1125 (last week 1125)
**Patches in the Pending State: 271 (23%) [last week 272 (23%)]
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
'''YP 5.1 Milestone Dates:'''<br/>
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Release date 2024-05-31
*YP 5.1 M2 Build date 2024-07-08
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25
'''Upcoming dot releases:'''<br/>
*YP 3.1.33 is released.
*YP 4.0.18 is ready for release.
*YP 4.0.18 Release date 2024-05-03
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.1 Release Date 2024-05-24
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 75: Line 74:


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]

Latest revision as of 14:44, 7 May 2024

Yocto Project Weekly Status May 7th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.33 has been released
  • YP 4.0.18 is due to be released
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
  • The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 3.1.33 is released.
  • YP 4.0.18 is ready for release.
  • YP 4.0.18 Release date 2024-05-03
  • YP 5.0.1 Build Date 2024-05-13
  • YP 5.0.1 Release Date 2024-05-24
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives