Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(210 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status Mar. 1st, 2022 ==
== Yocto Project Weekly Status May 21st, 2024 ==
Current Dev Position: YP 3.5 M4<br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: 4th Apr. 2022 YP 3.5 M4 build<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Mar. 3rd at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 23rd at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Mar. 1st at 8 am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 21st at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Mar. 8th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*We are now at feature freeze for 3.5, our next LTS release
*YP 5.0.1 has been through QA and is pending review for release
*YP 3.3.5 is out of QA and pending release approval
*There are some CVE related announcements which are helpful to us:
*Inclusive language changes have merged however there are still:
**There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
**Incompatible license related variable changes
**CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
**Function variable name changes needed
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
**No migration documentation or documentation of the changes
**Please consider signing this to show support for those changes.
**No documentation of the bitbake rename code
**Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
**No updates to the manual for the variable renames
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date. Marta sent out an update last week on this (thanks!)
We do need people to pull things together and finish things off, help in doing that is needed and much appreciated.
*gcc 14 has merged to master. There are errors in meta-arm, meta-virtualization and meta-mingw. Now that has merged, we will build and release a new uninative version.
*There is a pending patch to warn about old style license identifiers pending in master-next and due to be posted for review. On balance this is probably a good thing to get into the LTS but we’re open to input on that.
*More of the WORKDIR to UNPACKDIR transition has merged and devtool oe-local-files support has been dropped.
*The incompatible license changes will mean anyone using those variables will need to update what they’re doing carefully. Patches in master-next now pass testing and are due to be posted on the mailing list.
*The next stage of the WORKDIR changes is pending testing in master-next.
*The python build process change to use wheels has merged. That change has caused some disruption but was close enough to being ready it seemed worth making the final push for inclusion.
*The aim is to build YP 5.1 M1 as soon as the various queued patches stabilize.
*The infrastructure move was successful and all services should be restored. There are some networking issues occurring on autobuilder builds which are preventing release builds at this time and are being looked into.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*As such, the M3 release build will likely happen late this week or early next week.
*Automated testing continues to show large numbers of problems (e.g. a reproducibility issue in spirv-tools) but we continue to work through and fix issues as quickly as we can.
*If people see intermittent issues in their own builds, particularly if they’re the same as intermittent issues seen on the autobuilder, please do comment in the bugs mentioning when they happen as the frequency information does help us prioritize fixing the most common issues.
*Two issues causing failures on the new test infrastructure were tracked down to problems in bitbake. Both were effectively timing related issues.
*Intermittent issues continue to be at record high levels and help is very much welcome in trying to resolve them. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
PR server pass through support merged.
*A rust build issue of x86 hosted builds vs arm hosted builds has been identified as the cause of intermittent failures. Whilst this can be fixed, the fix breaks tests and/or reproducibility which gives challenges given the need to fix scarthgap. There are also challenges upgrading to newer rust versions.
*The performance graph improvements have merged.
*Improvements to the patch and CVE metrics page have also merged.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 3.5. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.5_Unassigned_Enhancements.2FBugs
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help us resolve CVE issues: CVE metrics https://docs.google.com/spreadsheets/d/e/2PACX-1vRgNISmH0Ditf0bRtSezeR2XsgKIiSFJKF6KJUHpnzocNGzvKZbuSDKfmV3n64BFXDRqElBSJnhHtG4/pubchart?oid=1993375488&format=interactive
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''YP 3.5 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.5 M3 build date 2022/02/21
*WDD 2752 (last week 2740) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.5 M3 Release date 2022/03/04
*OE-Core/Poky Patch Metrics
*YP 3.5 M4 build date 2022/04/04
**Total patches found: 1127 (last week 1128)
*YP 3.5 M4 Release date 2022/04/29
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
 
'''YP 5.1 Milestone Dates:'''<br/>
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Release date 2024-05-31
*YP 5.1 M2 Build date 2024-07-08
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 3.3.5 is out of QA
*YP 5.0.1 is ready for release.
*YP 3.3.5 Release date 2022/02/25
*YP 4.0.19 build date 2024-06-03
*YP 3.1.15 build date 2022/03/14
*YP 4.0.19 Release date 2024-06-14
*YP 3.1.15 Release date 2022/03/25
*YP 5.0.2 Build Date 2024-06-24
*YP 3.4.3 build date 2022/03/21
*YP 5.0.2 Release Date 2024-07-05
*YP 3.4.3 Release date 2022/04/01
*YP 4.0.20 Build Date 2024-07-15
*YP 3.3.6 build date 2022/03/28
*YP 4.0.20 Release Date 2024-07-26
*YP 3.3.6 Release date 2022/04/08
*YP 5.0.3 Build Date 2024-08-12
*YP 3.1.16 build date 2022/04/25
*YP 5.0.3 Release Date 2024-08-23
*YP 3.1.16 Release date 2022/05/06
*YP 4.0.21 Build Date 2024-09-09
 
*YP 4.0.21 Release Date 2024-09-20
'''Tracking Metrics:'''<br/>
*YP 5.0.4 Build Date 2024-09-23
*WDD 2679 (last week 2652) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0.4 Release Date 2024-10-04
*Poky Patch Metrics
*YP 4.0.22 Build Date 2024-10-14
**Total patches found: 1202 (last week 1202)
*YP 4.0.22 Release Date 2024-10-25
**Patches in the Pending State: 336 (28%) [last week 334 (28%)]
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 61: Line 80:


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]

Latest revision as of 14:44, 21 May 2024

Yocto Project Weekly Status May 21st, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 5.0.1 has been through QA and is pending review for release
  • There are some CVE related announcements which are helpful to us:
    • There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
    • CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • Please consider signing this to show support for those changes.
    • Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date. Marta sent out an update last week on this (thanks!)
  • gcc 14 has merged to master. There are errors in meta-arm, meta-virtualization and meta-mingw. Now that has merged, we will build and release a new uninative version.
  • More of the WORKDIR to UNPACKDIR transition has merged and devtool oe-local-files support has been dropped.
  • The next stage of the WORKDIR changes is pending testing in master-next.
  • The aim is to build YP 5.1 M1 as soon as the various queued patches stabilize.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Automated testing continues to show large numbers of problems (e.g. a reproducibility issue in spirv-tools) but we continue to work through and fix issues as quickly as we can.
  • Two issues causing failures on the new test infrastructure were tracked down to problems in bitbake. Both were effectively timing related issues.

PR server pass through support merged.

  • A rust build issue of x86 hosted builds vs arm hosted builds has been identified as the cause of intermittent failures. Whilst this can be fixed, the fix breaks tests and/or reproducibility which gives challenges given the need to fix scarthgap. There are also challenges upgrading to newer rust versions.
  • The performance graph improvements have merged.
  • Improvements to the patch and CVE metrics page have also merged.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 5.0.1 is ready for release.
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives