== Yocto Project Weekly Status Jan. 12, 2021 ==
== Yocto Project Weekly Status May 14th, 2024 ==
Current Dev Position: YP 3.3 M2 development<br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: 18th January 2021 YP 3.3 M2 build<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Jan. 14th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 16th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Feb. 2nd at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 14th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Jan. 12th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Patches for 3.3 M2 development are being tested and merged. We have one week left before M2 is due to be built.
*YP 4.0.18 has been released
*It was a mixed week for builds and patches, several reproducibility issues appeared and issues also appeared after patches had merged in the second or third build after that due to state reuse and differences between worker distros. This makes merging the patches challenging.
*YP 5.0.1 rc2 is in QA.
*In particular, an upgrade to qemu 5.2.0 did merge. That upgrade includes a change to the underlying build system and the patchset was significantly rationalised which may cause issues. In particular, issues on centos hosts were eventually traced to the mmap_min_addr setting being too low (65536 now seems to be the useful minimum).
*YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
*We are now tracking intermittent ptest failures and a number of bugs have been opened for these, we don’t as yet have people able to work on them though.
*There are some CVE related announcements which are helpful to us:
*CVE metrics are starting to trend down again but we still have 56 “open” CVEs against master and more in gatesgath/dunfell so help in further reducing the number would be appreciated.
**There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
*Intermittent autobuilder issues continue to occur and with more invasive changes and higher rebuild rates, the numbers are increasing again. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
**CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
**Please consider signing this to show support for those changes.
**Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
*Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 3.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhancements.2FBugs
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''YP 3.3 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.3 M2 build date 2021/01/18
*WDD 2740 (last week 2720) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.3 M2 Release date 2021/01/29
*OE-Core/Poky Patch Metrics
*YP 3.3 M3 build date 2021/03/01
**Total patches found: 1128 (last week 1125)
*YP 3.3 M3 Release date 2021/03/12
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*YP 3.3 M4 build date 2021/04/05
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*YP 3.3 M4 Release date 2021/04/30


'''Planned upcoming dot releases:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 3.1.5 build date 2021/01/11
*YP 5.1 M1 Build date 2024-05-20
*YP 3.1.5 release date 2021/01/22
*YP 5.1 M1 Release date 2024-05-31
*YP 3.2.2 build date 2021/02/08
*YP 5.1 M2 Build date 2024-07-08
*YP 3.2.2 release date 2021/02/19
*YP 5.1 M2 Release date 2024-07-19
*YP 3.1.6 build date 2021/02/22
*YP 5.1 M3 Build date 2024-08-26
*YP 3.1.6 release date 2021/03/05
*YP 5.1 M3 Release date 2024-09-06
*YP 3.1.7 build date 2021/03/22
*YP 5.1 M4 Build date 2024-09-30
*YP 3.1.7 release date 2021/04/02
*YP 5.1 M4 Release date 2024-10-25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2587 (last week 2598) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 4.0.18 is released.
*Poky Patch Metrics 
*YP 5.0.1 is in QA.
**Total patches found: 1298 (last week 1311)
*YP 4.0.19 build date 2024-06-03
**Patches in the Pending State: 503 (39%) [last week 507 (39%)]
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 50: Line 77:


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]

Latest revision as of 14:38, 14 May 2024

Yocto Project Weekly Status May 14th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 4.0.18 has been released
  • YP 5.0.1 rc2 is in QA.
  • YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
  • There are some CVE related announcements which are helpful to us:
    • There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
    • CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • Please consider signing this to show support for those changes.
    • Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
  • Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 4.0.18 is released.
  • YP 5.0.1 is in QA.
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: