== Yocto Project Weekly Status January 2, 2019 ==
== Yocto Project Weekly Status May 7th, 2024 ==
Current Dev Position: YP 2.7 M1 is in QA <br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: YP 2.7 M1 Release Target is Dec. 21, 2018<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday May 9th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday May 7th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester


*SWAT lead is currently: Amanda
'''Key Status/Updates:'''<br/>
*SWAT team rotation: Amanda -> Paul on Jan. 4, 2019
*YP 3.1.33 has been released
*SWAT team rotation: Paul -> Ross on Jan. 11, 2019
*YP 4.0.18 is due to be released
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
*The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.


'''Key Status/Updates:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.7 M1 is in QA and 100% complete. The final report should publish shortly. See: https://wiki.yoctoproject.org/wiki/2.7_QA_Status
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 2.5.2 rc1 in the process of being released. The announcement should come shortly.
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*We realised the toolchain bootstrap process could be simplified with the removal of glibc-initial and gcc-cross-initial. There have been separate emails about this and despite the vacation period, Khem and RP believed them to be ready and good enough to merge. Streamlining this bottleneck in the build has been something we’ve wanted to see for a number of years so its good to get this build time performance boost!
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*Some patches have merged over the holiday period, some have been delayed but master-next should be fairly up to date with current patches
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*The occasional issues in oe-selftest are still occurring unfortunately.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*The perl upgrade continues to be blocked on the fallout from meta-openembedded and the need to make some final tweaks to the patchset.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''Planned Releases for YP 2.6:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.7 M1 is in QA and should be out shortly.
*WDD 2720 (last week 2728) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.7 M1 Release Target is Dec. 21, 2018
*OE-Core/Poky Patch Metrics
*YP 2.7 M2 Cutoff is Jan. 21, 2019
**Total patches found: 1125 (last week 1125)
*YP 2.7 M2 Release Target is Feb. 1, 2019
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*YP 2.7 M3 Release Target is Mar. 8, 2019
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*YP 2.7 M4 Release Target is Apr. 26, 2019


'''Planned upcoming dot releases:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 2.5.2 (Sumo) is out of QA and should release shortly.
*YP 5.1 M1 Build date 2024-05-20
*YP 2.6.1 (Thud) will be targeted after YP 2.7 M1 is done.
*YP 5.1 M1 Release date 2024-05-31
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*YP 5.1 M2 Build date 2024-07-08
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*YP 5.1 M2 Release date 2024-07-19
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2334 (last week 2319) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.1.33 is released.
*Poky Patch Metrics 
*YP 4.0.18 is ready for release.
**Total patches found: 1628 (last week 1629)
*YP 4.0.18 Release date 2024-05-03
**Patches in the Pending State: 721 (44%) [last week 720 (44%)]
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.1 Release Date 2024-05-24
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:44, 7 May 2024

Yocto Project Weekly Status May 7th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.33 has been released
  • YP 4.0.18 is due to be released
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
  • The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 3.1.33 is released.
  • YP 4.0.18 is ready for release.
  • YP 4.0.18 Release date 2024-05-03
  • YP 5.0.1 Build Date 2024-05-13
  • YP 5.0.1 Release Date 2024-05-24
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC