*YP 3.1.33 has been released
*YP 3.1.33 has been released
*YP 4.0.18 is due to be released
*YP 4.0.18 is due to be released
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
Please consider signing this to show support for those changes.
Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.  
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.  

Revision as of 14:44, 7 May 2024

Yocto Project Weekly Status May 7th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.33 has been released
  • YP 4.0.18 is due to be released
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
  • The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 3.1.33 is released.
  • YP 4.0.18 is ready for release.
  • YP 4.0.18 Release date 2024-05-03
  • YP 5.0.1 Build Date 2024-05-13
  • YP 5.0.1 Release Date 2024-05-24
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29