Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
(538 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status January 29, 2019 ==
== Yocto Project Weekly Status May 7th, 2024 ==
Current Dev Position: YP 2.7 M3 <br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday May 9th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday May 7th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester


*SWAT lead is currently: Armin
'''Key Status/Updates:'''<br/>
*SWAT team rotation: Armin -> Anuj on Feb. 1, 2019
*YP 3.1.33 has been released
*SWAT team rotation: Anuj -> Paul on Feb. 8, 2019
*YP 4.0.18 is due to be released
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
*The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.


'''Key Status/Updates:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.6.1 should release this week. The transition to automated QA is raising some questions about test results but we’re working through those.
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 2.7 M2 was built and is in QA and is 8% done. See: https://wiki.yoctoproject.org/wiki/2.7_QA_Status
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There have been a further round of gitsm fixes (and new test case additions). If anyone is seeing gitsm fetcher issues please report them. There are requests to backport these changes to the stable series. This has risks but people are reporting bugs there so is something we need to consider.
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*There has been little follow up from the last round of AUH patches. Please can maintainers work on this and get these submitted!
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*There has been little feedback on the proposed virtgl changes, these will likely merge as no discussion will be taken to mean there are no objections. This will have a performance impact.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*There have been changes to the way the arm tunes are handled which merged after much discussion. The solution that merged should be safe and uncontroversial but if these do cause problems for anyone, please report ASAP.
*Help us resolve CVE issues: CVE metrics
*We’re getting much improved results from our automated testing but these are highlighting a number of problems. There is an email about issues found in ptest. The biggest challenge here now is finding people able to step up and help improve things.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''Planned Releases for YP 2.7:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.7 M2 is built and in QA.
*WDD 2720 (last week 2728) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.7 M2 Release Target is Feb. 1, 2019
*OE-Core/Poky Patch Metrics
*YP 2.7 M3 Cutoff is Feb. 25, 2019
**Total patches found: 1125 (last week 1125)
*YP 2.7 M3 Release Target is Mar. 8, 2019
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*YP 2.7 M4 Release Target is Apr. 26, 2019


'''Planned upcoming dot releases:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 2.6.1 (Thud) will release shortly.
*YP 5.1 M1 Build date 2024-05-20
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*YP 5.1 M1 Release date 2024-05-31
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*YP 5.1 M2 Build date 2024-07-08
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2393 (last week 2421) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.1.33 is released.
*Poky Patch Metrics 
*YP 4.0.18 is ready for release.
**Total patches found: 1583 (last week 1572)
*YP 4.0.18 Release date 2024-05-03
**Patches in the Pending State: 677 (43%) [last week 677 (43%)]
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.1 Release Date 2024-05-24
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Revision as of 14:44, 7 May 2024

Yocto Project Weekly Status May 7th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.33 has been released
  • YP 4.0.18 is due to be released
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
  • The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 3.1.33 is released.
  • YP 4.0.18 is ready for release.
  • YP 4.0.18 Release date 2024-05-03
  • YP 5.0.1 Build Date 2024-05-13
  • YP 5.0.1 Release Date 2024-05-24
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives