== Yocto Project Weekly Status Jan. 19, 2021 ==
== Yocto Project Weekly Status Jan. 26, 2021 ==
Current Dev Position: YP 3.3 M2 development<br/>
Current Dev Position: YP 3.3 M3 development<br/>
Next Deadline: 18th January 2021 YP 3.3 M2 build<br/>
Next Deadline: 1st March 2021 YP 3.3 M3 build<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Jan. 21st at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Jan. 28th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Feb. 2nd at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Monthly Project Meeting Tuesday Feb. 2nd at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Jan. 19th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Jan. 26th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.3 M2 is due to be built once the currently queued patches are stalised.
*YP 3.3 M2 is currently in QA and we are now in the final development milestone M3 for 3.3
*YP 3.1.5 has been built and is through QA and likely to be released imminently after TSC review.
*YP 3.1.5 was released.
*We’re pleased to announce that Bootlin are going to be helping with the build and integration work for the project, we’d like to welcome them on board and also thank the projects member companies for making this possible.
*We have a new simple system to help with the SWAT process, “SwatBot”, https://swatbot.yoctoproject.org/ . This aims to simplify the SWAT process by listing the exact list of issues which need to be triaged and tracks the resolutions. *It will mainly be of use to anyone participating in the SWAT process but mentioned here as people may see mention of it.
*Builds are continuing to show some intermittent instability. Unfortunately we also suffered NAS issues and whilst there has been no data loss, recovery of the system is slowing the autobuilder temporarily.
*Intermittent autobuilder issues continue to occur and with more invasive changes and higher rebuild rates, the numbers are increasing again. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
*Intermittent autobuilder issues continue to occur and with more invasive changes and higher rebuild rates, the numbers are increasing again. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
*An interesting idea came up in discussion with Kernel CI about potentially sharing YP autobuilder results into their system. There is an open bug for anyone interested in helping with or tracking this: https://bugzilla.yoctoproject.org/show_bug.cgi?id=14196. It could also be an interesting use case for generating an SBOM with our output artefacts.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 22: Line 22:


'''YP 3.3 Milestone Dates:'''<br/>
'''YP 3.3 Milestone Dates:'''<br/>
*YP 3.3 M2 build date 2021/01/18
*YP 3.3 M2 was built and is in QA.
*YP 3.3 M2 Release date 2021/01/29
*YP 3.3 M2 Release date 2021/01/29
*YP 3.3 M3 build date 2021/03/01
*YP 3.3 M3 build date 2021/03/01
Line 30: Line 30:


'''Planned upcoming dot releases:'''<br/>
'''Planned upcoming dot releases:'''<br/>
*YP 3.1.5 is out of QA
*YP 3.1.5 was released.
*YP 3.2.2 build date 2021/02/08
*YP 3.2.2 build date 2021/02/08
*YP 3.2.2 release date 2021/02/19
*YP 3.2.2 release date 2021/02/19
Line 39: Line 39:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2634 (last week 2587) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2627 (last week 2234) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1292 (last week 1298)
**Total patches found: 1290 (last week 1292)
**Patches in the Pending State: 503 (39%) [last week 503 (39%)]
**Patches in the Pending State: 502 (39%) [last week 503 (39%)]


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 15:45, 26 January 2021

Yocto Project Weekly Status Jan. 26, 2021

Current Dev Position: YP 3.3 M3 development
Next Deadline: 1st March 2021 YP 3.3 M3 build

Next Team Meetings:

Key Status/Updates:

  • YP 3.3 M2 is currently in QA and we are now in the final development milestone M3 for 3.3
  • YP 3.1.5 was released.
  • We have a new simple system to help with the SWAT process, “SwatBot”, https://swatbot.yoctoproject.org/ . This aims to simplify the SWAT process by listing the exact list of issues which need to be triaged and tracks the resolutions. *It will mainly be of use to anyone participating in the SWAT process but mentioned here as people may see mention of it.
  • Intermittent autobuilder issues continue to occur and with more invasive changes and higher rebuild rates, the numbers are increasing again. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
  • An interesting idea came up in discussion with Kernel CI about potentially sharing YP autobuilder results into their system. There is an open bug for anyone interested in helping with or tracking this: https://bugzilla.yoctoproject.org/show_bug.cgi?id=14196. It could also be an interesting use case for generating an SBOM with our output artefacts.

Ways to contribute:

YP 3.3 Milestone Dates:

  • YP 3.3 M2 was built and is in QA.
  • YP 3.3 M2 Release date 2021/01/29
  • YP 3.3 M3 build date 2021/03/01
  • YP 3.3 M3 Release date 2021/03/12
  • YP 3.3 M4 build date 2021/04/05
  • YP 3.3 M4 Release date 2021/04/30

Planned upcoming dot releases:

  • YP 3.1.5 was released.
  • YP 3.2.2 build date 2021/02/08
  • YP 3.2.2 release date 2021/02/19
  • YP 3.1.6 build date 2021/02/22
  • YP 3.1.6 release date 2021/03/05
  • YP 3.1.7 build date 2021/03/22
  • YP 3.1.7 release date 2021/04/02

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: