Yocto Project Weekly Status September 6th, 2022

Current Dev Position: YP 4.1 M3 (Feature Freeze)
Next Deadline: 22nd August 2022 YP 4.1 M3 Build

Next Team Meetings:

Key Status/Updates:

  • We are now at feature freeze for 4.1 but M3 has not been built yet.
  • Many of the blocking issues for M3 have been resolved including:
    • perl build hangs
    • cve-check database issues
    • hash-equiv file not found issues on local domain sockets
    • layer setup changes merged
    • rust upgrade merged
    • libgcrypt ptest issues on ARM is potentially fixed
    • llvm build path corruption in mesa was resolved
    • rust ppc patch was revised
    • llvm-config handling in core was reworked
    • nativesdk-gcc issue breaking rust SDK tests was identified and fixed
    • a checksum mismatch race issue in bitbake’s fetcher code was fixed
  • Thanks to everyone who helped work on and resolve these, it will significantly improve the release and autobuilder stability during testing.
  • There is still an issue with rust SDK failures on ubuntu1804 to resolve before M3 can build
  • The rust selftest changes are looking unlikely to merge as they don’t pass during testing yet and one of the precursor patches causes buildpath issues. Some precursor patches did merge.
  • Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

Ways to contribute:

YP 4.1 Milestone Dates:

  • YP 4.1 M3 build date 2022/08/22
  • YP 4.1 M3 Release date 2022/09/02
  • YP 4.1 M4 build date 2022/10/03
  • YP 4.1 M4 Release date 2022/10/28

Upcoming dot releases:

  • YP 4.0.4 build date 2022/09/19
  • YP 4.0.4 Release date 2022/09/30
  • YP 3.1.20 build date 2022/10/10
  • YP 3.1.20 Release date 2022/10/21
  • YP 4.0.5 build date 2022/10/31
  • YP 4.0.5 Release date 2022/11/11

Tracking Metrics: