Weekly Status
From Yocto Project
Jump to navigationJump to search
Yocto Project Status 27 October 2026
Current Dev Position: YP 6.2 M1 - Development
Next Deadline: YP 6.2 M1: w/c 2026-12-21
Next Team Meetings:
- Bug Triage meeting - Thursday 29th Oct. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
- Weekly Project Engineering Sync - Tuesday 27th Oct. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Yocto Project Patch Review - Thursday 29th Oct. 10am GMT and Monday 2nd Nov. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
Project data dashboard: https://dashboard.yoctoproject.org/
Key Status/Updates:
- YP 5.0.21 was released
- Patches for 6.2 have started merging into master
- There is a proposal for changes to layer configuration setup out for discussion: https://lists.openembedded.org/g/openembedded-architecture/message/2431
- We have updated packages to handle the Emudhra CA certificate compromise that occurred last week, and updates have been expedited on our stable branches.
- The AB intermittent issues we frequently highlight caused some delays in getting these changes merged to the stable branches - these intermittent issues do have an impact!
- The Yocto Project wiki was made read-only to mitigate PHP security issues reported last week, we hope to have this working fully again soon.
- We are currently reviewing proposed release dates for 2027 and should be able to share these next week.
- We may move some releases forward a week this year to avoid needing to make a release during the end-of-year break.
- Now that YP 6.1 is released, we will re-test Yocto Project compatible layers for the new release. If you have a YP compatible layer, please ensure you have created a “blacksail” branch.
- There are issues where we could accept help:
- Matchbox-wm segfault/xserver restart
- Remaining github.com references in bitbake-selftest
- US daylight savings time finishes this Sunday, some meeting times track US Pacific timezone so double check your calendars next week.
- The CFP is open for the OpenEmbedded Workshop to be held in Brussels on Feb 1st 2027: https://pretalx.com/openembedded-workshop-2027/
Ways to contribute:
- We have several open issues for pseudo and limited maintainer time to work on them. Help from someone familiar with systems programming in C would be greatly appreciated. https://bugzilla.yoctoproject.org/buglist.cgi?list_id=661406&priority=High&priority=Medium%2B&product=Pseudo&query_format=advanced&resolution=---
- There are a large number of intermittent failures on our autobuilder, any help with investigating, reproducing or solving these issues would be welcome! https://valkyrie.yocto.io/pub/non-release/abint/
- Many recipes in openembedded-core would benefit from a new recipe maintainer. Please look at https://git.openembedded.org/openembedded-core/tree/meta/conf/distro/include/maintainers.inc and see if you can adopt any of the unassigned recipes.
- For more ways to contribute, see https://docs.google.com/document/d/18oxKWxLorfF813h82mK6yKTIHeBp_-9owFuCWbzgjOk/edit?usp=sharing
New to the project?
- We have a list of issues we think are good places to start contributing: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=NEWCOMER
Tracking Metrics:
- WDD 2639 (last week 2699) (https://wiki.yoctoproject.org/charts/combo.html)
- OE-Core/Poky Patch Metrics
- Total patches found: 1042 (last week 1044)
- Patches in the Pending State: 135 (13%) [last week 135 (13%)]
- https://valkyrie.yocto.io/pub/non-release/patchmetrics/3
Upcoming development releases:
- 6.1.0: is due for release
- YP 6.2 M1
- Build Date w/c 2026-12-07
- Release Date w/c 2026-12-21
- YP 6.2 M2
- Build Date w/c 2027-01-18
- Release Date w/c 2027-02-01
- YP 6.2 M3
- Build Date w/c 2027-03-01
- Release Date w/c 2027-03-15
- YP 6.2.0
- Build Date w/c 2027-04-26
- Release Date w/c 2027-05-03
Upcoming dot releases:
- YP 5.0.21 was released.
- YP 6.1.1
- Build Date w/c 2026-11-16
- Release Date w/c 2026-11-30
- YP 6.0.5
- Build Date w/c 2026-11-23
- Release Date w/c 2026-12-07
- YP 5.0.22
- Build Date w/c 2026-11-30
- Release Date w/c 2026-12-14
- For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC
Archives
- 2026 Yocto Project Weekly Status Archive
- 2025 Yocto Project Weekly Status Archive
- 2024 Yocto Project Weekly Status Archive
- 2023 Yocto Project Weekly Status Archive
- 2022 Yocto Project Weekly Status Archive
- 2021 Yocto Project Weekly Status Archive
- 2020 Yocto Project Weekly Status Archive
- 2019 Yocto Project Weekly Status Archive
- 2018 Yocto Project Weekly Status Archive