Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status Aug. 20th, 2024 ==
== Yocto Project Weekly Status Aug. 27th, 2024 ==
Current Dev Position: YP 5.1 M3 <br/>
Current Dev Position: YP 5.1 Feature Freeze<br/>
Next Deadline: YP 5.1 M3 Build 26 Aug. 2024<br/>
Next Deadline: YP 5.1 M3 Build 26 Aug. 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Aug. 22nd at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Aug. 29th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday Aug. 20th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Aug. 27th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Feature freeze for YP 5.1 (M3) is less than a week away
*We are now at feature freeze for YP 5.1
*YP 5.0.3 is due to be released
*YP 5.0.3 was released
*We are holding off the mesa upgrades for 5.1 due to the need for clang.
*5.1 Status:
*We hope that we can start to merge pieces of meta-clang into OE-Core but this will need people to help do the work and will have to happen in 5.2 as there is insufficient time left for 5.1.
**we will hold off upgrading mesa due to clang requirements
*Rust was upgraded to 1.78, thanks Yash.
**we will hold off upgrading numpy as the new version isn’t widely adopted yet
*The cve-check/vex series has merged, thanks Marta.
**rust will remain on 1.78 unless the 1.79 host build issues are quickly resolved
*quires meta-clang for the intel drivers. We need to make a decision on how to handle this, clang is likely to make its way to core at some point but work is needed to make the overrides suitable for core before that can happen.
**musl upgrading is blocked on bluez basename patch issues
*All queued patches/series should now have review feedback
*Meta-clang migration into core is targeted for 5.2.
*There is discussion around configuration file markup/syntax related to fragment management on the architecture list, targeting 5.2.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 28: Line 31:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2756 (last week 2758) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2759 (last week 2756) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1086 (last week 1072)
**Total patches found: 1070 (last week 1086)
**Patches in the Pending State: 178 (16%) [last week 178 (16%)]
**Patches in the Pending State: 177 (17%) [last week 178 (16%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


Line 41: Line 44:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.3 is ready for release.
*YP 5.0.3 was released.
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 4.0.21 Release Date 2024-09-20

Revision as of 14:38, 27 August 2024

Yocto Project Weekly Status Aug. 27th, 2024

Current Dev Position: YP 5.1 Feature Freeze
Next Deadline: YP 5.1 M3 Build 26 Aug. 2024

Next Team Meetings:

Key Status/Updates:

  • We are now at feature freeze for YP 5.1
  • YP 5.0.3 was released
  • 5.1 Status:
    • we will hold off upgrading mesa due to clang requirements
    • we will hold off upgrading numpy as the new version isn’t widely adopted yet
    • rust will remain on 1.78 unless the 1.79 host build issues are quickly resolved
    • musl upgrading is blocked on bluez basename patch issues
  • All queued patches/series should now have review feedback
  • Meta-clang migration into core is targeted for 5.2.
  • There is discussion around configuration file markup/syntax related to fragment management on the architecture list, targeting 5.2.

Ways to contribute:

  • As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
  • There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
  • There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
  • There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
  • We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
  • Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
  • Help us resolve CVE issues: CVE metrics
  • We have a growing number of bugs in bugzilla, any help with them is appreciated.

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 5.0.3 was released.
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives