*YP 3.1.23 was built and is in QA. There was an intermittent failure during the release build but this was a known issue recurring.
*YP 3.1.23 is due to be released.
*Next week is when M3 is due to build and this marks '''feature freeze for YP 4.2'''.
*We are due to build M3 and are at '''feature freeze for YP 4.2'''.
*We saw a number of version upgrades this week (thanks Alex Kanavin).
*We saw further version upgrades this week and a number of bitbake hang fixes or fixes for exits with no output. There are a few remaining issues to conclude then we should be in a good position to build M3.
*There were also improvements to our runtime testing reliability (thanks Mikko Rapeli).
*CVE levels in master are reducing. The remaining concern is the large number of linux-yocto CVEs which have shown up since we last updated the exclusion lists. The full list can be seen here: https://autobuilder.yocto.io/pub/non-release/patchmetrics/cve-status-master.txt
*Of the issues discussed in https://lists.openembedded.org/g/openembedded-core/message/176476, the bitbake command timeout and PR serv async io issues still need to be addressed.
*Help in resolving these so we can remove the exclusion on linux-yocto on all reports would be appreciated.
*CVE levels in master are reducing but help in resolving the remaining issues would be appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.



Revision as of 15:38, 21 February 2023

Yocto Project Weekly Status February 21st, 2023

Current Dev Position: YP 4.2 M3 Feature Freeze
Next Deadline: 20th February 2023 YP 4.2 M3 Build

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.23 is due to be released.
  • We are due to build M3 and are at feature freeze for YP 4.2.
  • We saw further version upgrades this week and a number of bitbake hang fixes or fixes for exits with no output. There are a few remaining issues to conclude then we should be in a good position to build M3.
  • CVE levels in master are reducing. The remaining concern is the large number of linux-yocto CVEs which have shown up since we last updated the exclusion lists. The full list can be seen here: https://autobuilder.yocto.io/pub/non-release/patchmetrics/cve-status-master.txt
  • Help in resolving these so we can remove the exclusion on linux-yocto on all reports would be appreciated.
  • We have a growing number of bugs in bugzilla, any help with them is appreciated.

Ways to contribute:

YP 4.2 Milestone Dates:

  • YP 4.2 M3 build date 2023/02/20
  • YP 4.2 M3 Release date 2023/03/03
  • YP 4.2 M4 build date 2023/04/03
  • YP 4.2 M4 Release date 2023/04/28

Upcoming dot releases:

  • YP 3.1.23 is ready for release
  • YP 4.0.8 build date 2023/02/27
  • YP 4.0.8 Release date 2023/03/10
  • YP 4.1.3 build date 2023/03/06
  • YP 4.1.3 Release date 2023/03/17
  • YP 3.1.24 build date 2023/03/20
  • YP 3.1.24 Release date 2023/03/31
  • YP 4.0.9 build date 2023/04/10
  • YP 4.0.9 Release date 2023/04/21
  • YP 4.1.4 build date 2023/05/01
  • YP 4.1.4 Release date 2023/05/13
  • YP 3.1.25 build date 2023/05/08
  • YP 3.1.25 Release date 2023/05/19
  • YP 4.0.10 build date 2023/05/15
  • YP 4.0.10 Release date 2023/05/26