Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status October 4th, 2022 ==
== Yocto Project Weekly Status October 11th, 2022 ==
Current Dev Position: YP 4.1 M4 (In QA)<br/>
Current Dev Position: YP 4.1 M4 (In QA)<br/>
Next Deadline: 28th October 2022 YP 4.1 Release br/>
Next Deadline: 28th October 2022 YP 4.1 Release br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday October 6th 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday October 13th 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday October 4th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday October 11th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.1 rc2 is now in QA
*Richard Purdie is actually on holiday and expects to return on the 24th October.
*Richard will not be around for the next two weeks. With 4.1 rc2 in QA for the next week, things should be quiet and the TSC can then decide on whether to release or if an rc3 is needed for any reason. Alexandre/Luca will test/queue patches during this time, patches are not expected to merge. Ross is around and should be able to cover most other things if/as needed.
*Patches for master are welcome on the mailing list and will be reviewed/tested, but will not be merged until RP has returned.
*YP 4.1 rc2 is now out of QA and will be reviewed by the TSC later today. Release is scheduled for the 28th but may happen earlier if the documentation is finalized.
*A bug related to the Extensible SDK has been found in YP 4.1 but this is potentially not a release blocker, and can be fixed in the first point release.
*Steve Sakoman to maintain Langdale (YP 4.1 - not an LTS)
*At release we released the core layer was still advertising kirkstone so this was removed. This did mean some simple changes were needed to layers to mark compatibility with the new release, we’ll aim to do this earlier in the next release.
*At release we released the core layer was still advertising kirkstone so this was removed. This did mean some simple changes were needed to layers to mark compatibility with the new release, we’ll aim to do this earlier in the next release.
*YP 3.1.20 rc2 has been built and is in QA now.
*YP 4.2 Proposed Timeline document is at: https://docs.google.com/document/d/1X5KM_3BiEsIrHBO93ULvYHQJ72NqS5U5jjwWo5bxTiY/edit?usp=sharing
*YP 4.2 Proposed Timeline document is at: https://docs.google.com/document/d/1X5KM_3BiEsIrHBO93ULvYHQJ72NqS5U5jjwWo5bxTiY/edit?usp=sharing
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT. In particular there is a long-standing qemuppc failure which needs investigating (https://bugzilla.yoctoproject.org/show_bug.cgi?id=14824)


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 22: Line 26:


'''YP 4.1 Milestone Dates:'''<br/>
'''YP 4.1 Milestone Dates:'''<br/>
*YP 4.1 M4 is built and in QA
*YP 4.1 M4 is back from QA and in TSC Review
*YP 4.1 M4 Release date 2022/10/28
*YP 4.1 M4 Release date 2022/10/28


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 3.1.20 build date 2022/10/10
*YP 3.1.20 is built and in QA
*YP 3.1.20 Release date 2022/10/21
*YP 3.1.20 Release date 2022/10/21
*YP 4.0.5 build date 2022/10/31
*YP 4.0.5 build date 2022/10/31
Line 32: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2404 (last week 2294) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2409 (last week 2404) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1217 (last week 1215)
**Total patches found: 1217 (last week 1217)
**Patches in the Pending State: 311 (26%) [last week 311 (26%)]
**Patches in the Pending State: 311 (26%) [last week 311 (26%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/

Revision as of 14:52, 11 October 2022

Yocto Project Weekly Status October 11th, 2022

Current Dev Position: YP 4.1 M4 (In QA)
Next Deadline: 28th October 2022 YP 4.1 Release br/>

Next Team Meetings:

Key Status/Updates:

  • Richard Purdie is actually on holiday and expects to return on the 24th October.
  • Patches for master are welcome on the mailing list and will be reviewed/tested, but will not be merged until RP has returned.
  • YP 4.1 rc2 is now out of QA and will be reviewed by the TSC later today. Release is scheduled for the 28th but may happen earlier if the documentation is finalized.
  • A bug related to the Extensible SDK has been found in YP 4.1 but this is potentially not a release blocker, and can be fixed in the first point release.
  • Steve Sakoman to maintain Langdale (YP 4.1 - not an LTS)
  • At release we released the core layer was still advertising kirkstone so this was removed. This did mean some simple changes were needed to layers to mark compatibility with the new release, we’ll aim to do this earlier in the next release.
  • YP 3.1.20 rc2 has been built and is in QA now.
  • YP 4.2 Proposed Timeline document is at: https://docs.google.com/document/d/1X5KM_3BiEsIrHBO93ULvYHQJ72NqS5U5jjwWo5bxTiY/edit?usp=sharing

Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT. In particular there is a long-standing qemuppc failure which needs investigating (https://bugzilla.yoctoproject.org/show_bug.cgi?id=14824)

Ways to contribute:

YP 4.1 Milestone Dates:

  • YP 4.1 M4 is back from QA and in TSC Review
  • YP 4.1 M4 Release date 2022/10/28

Upcoming dot releases:

  • YP 3.1.20 is built and in QA
  • YP 3.1.20 Release date 2022/10/21
  • YP 4.0.5 build date 2022/10/31
  • YP 4.0.5 Release date 2022/11/11

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives