== Yocto Project Weekly Status Oct. 5th, 2021 ==
== Yocto Project Weekly Status Oct. 12th, 2021 ==
Current Dev Position: YP 3.4 M4<br/>
Current Dev Position: YP 3.4 M4<br/>
Next Deadline: 4th Oct. 2021 YP 3.4 M4 build<br/>
Next Deadline: 4th Oct. 2021 YP 3.4 M4 build<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Oct. 7th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Oct. 14th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Oct. 5th at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Monthly Project Meeting Tuesday Nov. 2nd at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Oct. 12th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Oct. 12th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester
Line 25: Line 25:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2676 (last week 2671) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2687 (last week 2676) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1318 (last week 1309)
**Total patches found: 1318 (last week 1318)
**Patches in the Pending State: 488 (37%) [last week 484 (37%)]
**Patches in the Pending State: 488 (37%) [last week 488 (37%)]


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 14:34, 12 October 2021

Yocto Project Weekly Status Oct. 12th, 2021

Current Dev Position: YP 3.4 M4
Next Deadline: 4th Oct. 2021 YP 3.4 M4 build

Next Team Meetings:

Key Status/Updates:

  • The final 3.4 build is now due.
  • We should be in a reasonable position and ready for the 3.4 build, except for the SOURCE_DATE_EPOCH corruption issues we’re seeing. Once those issues and the related sstate reuse issues are fixed, we’ll build 3.4. At this point there are other patches but they’re causing failures and clearly aren’t ready for merging.
  • There continues to be an sstate reuse issue where native sstate on aarch64 and x86_64 hosts isn’t generating correct hashes when combined with hash equivalence.
  • Intermittent issues took a significant rise last week as SWAT caught up with the backlog of issues. Help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

Ways to contribute:

YP 3.4 Milestone Dates:

  • YP 3.4 M4 build date 2021/10/04
  • YP 3.4 M4 Release date 2021/10/29

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives