Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status Nov. 5th,  2024 ==
== Yocto Project Weekly Status Nov. 12th,  2024 ==
Current Dev Position: YP 5.2 M1<br/>
Current Dev Position: YP 5.2 M1<br/>
Next Deadline: YP 5.2 M1 Release date 2024-12-09<br/>
Next Deadline: YP 5.2 M1 Release date 2024-12-09<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Nov. 7th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Nov. 14th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync Tuesday Nov. 5th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync Tuesday Nov. 12th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester  
*Twitch -  See https://www.twitch.tv/theyoctojester  


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*We have now fully transitioned to the new autobuilder infrastructure, thanks Michael!
*YP 5.0.5 is in QA.
*Patch merging seems to be flowing reasonably well at present with a minimal review/testing backlog.
*Patch merging seems to be flowing reasonably well at present with a minimal review/testing backlog.
*A fix for the performance of the dump signatures option to bitbake has merged which should further alleviate some autobuilder intermittent failures, in this case a bitbake server timeout.
*The IMAGE_FEATURE “debug-tweaks” has been removed since it hides some fairly serious potential security issues and we want to make these more explicit, clear and obvious.
*Improvements on the documentation are being made including a move to a newer Sphinx version and the addition of pdf and epub output generation.
*Our documentation now includes pdf and epub format files which can be downloaded.
*The 5.2 development plans are now being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing
*There is discussion about a potential new “include_all” conf file directive on the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/message/2055
*Please help us to add in the missing information. The TSC has filled out some information to give examples of what we need.
*The 5.2 development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing
*We need to continue to develop this, thanks to all who have contributed so far!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 27: Line 28:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2740 (last week 2756) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2759 (last week 2740) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1063 (last week 1063)
**Total patches found: 1070 (last week 1063)
**Patches in the Pending State: 175 (16%) [last week 175 (16%)]
**Patches in the Pending State: 175 (16%) [last week 175 (16%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/
Line 44: Line 45:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 is in QA.
*YP 5.0.5 Release Date 2024-11-22
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Build Date 2024-11-18

Revision as of 15:43, 12 November 2024

Yocto Project Weekly Status Nov. 12th, 2024

Current Dev Position: YP 5.2 M1
Next Deadline: YP 5.2 M1 Release date 2024-12-09

Next Team Meetings:

Key Status/Updates:

Ways to contribute:

  • As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
  • There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
  • There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
  • There are bugs that are currently unassigned for YP 5.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.2_Unassigned_Enhancements/Bugs
  • We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
  • Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
  • Help us resolve CVE issues: CVE metrics
  • We have a growing number of bugs in bugzilla, any help with them is appreciated.

Tracking Metrics:

YP 5.2 Milestone Dates:

  • YP 5.2 M1 Build Date 2024-12-09
  • YP 5.2 M1 Release Date 2024-12-20
  • YP 5.2 M2 Build Date 2025-01-20
  • YP 5.2 M2 Release Date 2025-01-31
  • YP 5.2 M3 Build Date 2025-03-03
  • YP 5.2 M3 Release Date 2025-03-14
  • YP 5.2 M4 Build Date 2025-03-31
  • YP 5.2 M4 Release Date 2025-04-25

Upcoming dot releases:

  • YP 5.0.5 is in QA.
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29
  • YP 5.1.1 Build Date 2024-12-02
  • YP 5.1.1 Release Date 2024-12-13
  • YP 5.0.6 Build Date 2024-12-16
  • YP 5.0.6 Release Date 2024-12-27
  • YP 4.0.24 Build Date 2025-01-06
  • YP 4.0.24 Release Date 2025-01-17
  • YP 5.1.2 Build Date 2025-01-13
  • YP 5.1.2 Release Date 2025-01-24
  • YP 5.0.7 Build Date 2025-01-27
  • YP 5.0.7 Release Date 2025-02-07
  • YP 4.0.25 Build Date 2025-02-17
  • YP 4.0.25 Release Date 2025-02-28
  • YP 5.1.3 Build Date 2025-02-24
  • YP 5.1.3 Release Date 2025-03-07
  • YP 5.0.8 Build Date 2025-03-10
  • YP 5.0.8 Release Date 2025-03-21
  • YP 5.1.4 Build Date 2025-03-24
  • YP 5.1.4 Release Date 2025-04-04
  • YP 4.0.26 Build Date 2025-04-07
  • YP 4.0.26 Release Date 2025-04-18
  • YP 5.0.9 Build Date 2025-04-21
  • YP 5.0.9 Release Date 2025-05-02
  • YP 4.0.27 Build Date 2025-05-19
  • YP 4.0.27 Release Date 2025-05-30
  • YP 5.0.10 Build Date 2025-06-02
  • YP 5.0.10 Release Date 2025-06-13
  • YP 4.0.28 Build Date 2025-06-30
  • YP 4.0.28 Release Date 2025-07-11

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives