*YP 3.3.4 has been through QA and is | *YP 3.3.4 was released | ||
*YP 3.1 | *YP 3.1.12 has been through QA and is pending release approval. | ||
* | *YP 3.4.1 is due to be built after the current patchsets are reviewed and merge. | ||
* | *Next week is the Yocto Project Virtual Summit https://www.yoctoproject.org/yocto-project-summit-2021-11/ and OpenEmbedded Virtual Developer Meeting on Friday https://www.openembedded.org/wiki/OEDVM_Nov_2021 | ||
*CVEs in hardknott and dunfell rose this week due to 14 busybox issues being added. Master remains roughly stable but we need to upgrade golang to fix some, the other issues in master do not yet have fixes in upstream (qemu, libarchive and nasm). | |||
*We continue to see a reduction in the number of patches in “Pending” state. Many thanks to everyone who has taken the time to review patch status and handle accordingly, particularly where they were accepted upstream. | *We continue to see a reduction in the number of patches in “Pending” state. Many thanks to everyone who has taken the time to review patch status and handle accordingly, particularly where they were accepted upstream. This will significantly benefit the project in the long term. | ||
*Intermittent issues continue to rise and help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT | *Intermittent issues continue to rise and help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT | ||
Revision as of 15:42, 23 November 2021
Yocto Project Weekly Status Nov. 23th, 2021
Current Dev Position: YP 3.5 M1
Next Deadline: 6th Dec. 2021 YP 3.5 M1 build
Next Team Meetings:
- Bug Triage meeting Thursday Nov. 25th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
- Monthly Project Meeting Tuesday Dec. 7th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Weekly Engineering Sync Tuesday Nov. 23th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Twitch - See https://www.twitch.tv/theyoctojester
Key Status/Updates:
- YP 3.3.4 was released
- YP 3.1.12 has been through QA and is pending release approval.
- YP 3.4.1 is due to be built after the current patchsets are reviewed and merge.
- Next week is the Yocto Project Virtual Summit https://www.yoctoproject.org/yocto-project-summit-2021-11/ and OpenEmbedded Virtual Developer Meeting on Friday https://www.openembedded.org/wiki/OEDVM_Nov_2021
- CVEs in hardknott and dunfell rose this week due to 14 busybox issues being added. Master remains roughly stable but we need to upgrade golang to fix some, the other issues in master do not yet have fixes in upstream (qemu, libarchive and nasm).
- We continue to see a reduction in the number of patches in “Pending” state. Many thanks to everyone who has taken the time to review patch status and handle accordingly, particularly where they were accepted upstream. This will significantly benefit the project in the long term.
- Intermittent issues continue to rise and help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
Ways to contribute:
- There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
- There are bugs that are currently unassigned for YP 3.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhancements.2FBugs
- We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
YP 3.5 Milestone Dates:
- YP 3.5 M1 build date 2021/12/06
- YP 3.5 M1 Release date 2021/12/17
- YP 3.5 M2 build date 2022/01/10
- YP 3.5 M2 Release date 2022/1/21
- YP 3.5 M3 build date 2022/2/21
- YP 3.5 M3 Release date 2022/03/04
- YP 3.5 M4 build date 2022/04/04
- YP 3.5 M4 Release date 2022/04/29
Upcoming dot releases:
- YP 3.3.4 is released
- YP 3.1.12 is out of QA
- YP 3.4.1 build date 2021/11/22
- YP 3.4.1 Release date 2021/12/03
- YP 3.1.13 build date 2021/12/13
- YP 3.1.13 Release date 2021/12/22
- YP 3.1.14 build date 2022/01/24
- YP 3.1.14 Release date 2022/02/04
- YP 3.4.2 build date 2022/02/07
- YP 3.4.2 Release date 2022/02/18
- YP 3.1.15 build date 2022/03/14
- YP 3.1.15 Release date 2022/03/25
- YP 3.4.3 build date 2022/03/21
- YP 3.4.3 Release date 2022/04/01
- YP 3.1.16 build date 2022/04/25
- YP 3.1.16 Release date 2022/05/06
Tracking Metrics:
- WDD 2588 (last week 2603) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1276 (last week 1271)
- Patches in the Pending State: 422 (33%) [last week 436 (34%)]
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: