Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
Line 1: Line 1:
== Yocto Project Status 18 August 2026 ==
== Yocto Project Status 25 August 2026 ==
Current Dev Position: YP 6.1 M3<br/>
Current Dev Position: YP 6.1 M3<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 20th Aug. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 27th Aug. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync  - Tuesday 18th Aug. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync  - Tuesday 25th Aug. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 20th Aug. 10am GMT and Monday 24th Aug. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 27th Aug. 10am GMT and Monday 31st Aug. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 6.1 M3 is due in two weeks and this will be the feature freeze point for YP 6.1.
*YP 6.0.3 is in QA.
*YP 6.1 M3 is due in one week and this will be the feature freeze point for YP 6.1.
*For 6.1 M3 our plans are to merge rpm 6, merge openssl 4 and update to the 7.2 kernel. If there are any other major changes planned, please let us know ASAP!
*AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
*AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
*We would like to remind everyone that AI-generated code submitted to Yocto Project must include disclosure of the use of AI tools, in line with our policy in the contributor guide (https://docs.yoctoproject.org/contributor-guide/submit-changes.html#acceptance-of-ai-generated-code). Joshua has sent patches adding AGENTS.md files to bitbake and openembedded-core to prompt agents to follow this policy. We are discussing further updates to our policy on AI assisted submissions as this is a rapidly evolving area.
*We continue to try and keep up to date with upstream releases through the AUH, big thanks to those sending version updates and fixing version update issues. It is worth noting that the ‘success’ updates do still need work on the commit message changelogs and much of this work is being pushed to Richard.
*There have been locking changes with do_fetch/do_unpack within the bitbake fetcher to allow better performance of builds with shared DL_DIRs. There are also performance improvements to the handling of repeated ssl connection queries.
*There is discussion on the architecture list about how we could improve the fetcher, particularly around how recursion is handled in git submodules: https://lists.openembedded.org/g/openembedded-architecture/message/2416
*We continue to try and keep up to date with upstream releases through the AUH, big thanks to those sending version updates and fixing version update issues.
*There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
*There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
**Matchbox-wm segfault/xserver restart
**Matchbox-wm segfault/xserver restart
Line 36: Line 35:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2704 (last week 2694) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2659 (last week 2704) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1030 (last week 1028)
**Total patches found: 1028 (last week 1030)
**Patches in the Pending State: 139 (14%) [last week 139 (14%)]
**Patches in the Pending State: 139 (14%) [last week 139 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
Line 51: Line 50:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 6.0.3 due to release
*YP 6.0.3 is in QA.
**Release Date w/c 2026-08-24
**Release Date w/c 2026-08-24
*YP 5.0.20
*YP 5.0.20

Latest revision as of 14:45, 25 August 2026

Yocto Project Status 25 August 2026

Current Dev Position: YP 6.1 M3
Next Deadline: YP 6.1 M3: w/c 2026-08-31

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 6.0.3 is in QA.
  • YP 6.1 M3 is due in one week and this will be the feature freeze point for YP 6.1.
  • For 6.1 M3 our plans are to merge rpm 6, merge openssl 4 and update to the 7.2 kernel. If there are any other major changes planned, please let us know ASAP!
  • AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
  • We continue to try and keep up to date with upstream releases through the AUH, big thanks to those sending version updates and fixing version update issues. It is worth noting that the ‘success’ updates do still need work on the commit message changelogs and much of this work is being pushed to Richard.
  • There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
    • Matchbox-wm segfault/xserver restart
    • aarch64/x86-64 build host contamination/reproducibility issue

We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.

  • Remaining intermittent build failures of concern:
    • other qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • intermittent ptest failures in many recipes

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 6.0.3 is in QA.
    • Release Date w/c 2026-08-24
  • YP 5.0.20
    • Build Date w/c 2026-08-17
    • Release Date w/c 2026-08-31
  • YP 6.0.4
    • Build Date w/c 2026-09-28
    • Release Date w/c 2026-10-12
  • YP 5.0.21
    • Build Date w/c 2026-10-05
    • Release Date w/c 2026-10-19

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives