Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(14 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Status 12 May 2026 ==
== Yocto Project Status 18 August 2026 ==
Current Dev Position: YP 6.1 M1<br/>
Current Dev Position: YP 6.1 M3<br/>
Next Deadline: YP 6.1 M1: w/c 2026-06-08<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 14th May 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 20th Aug. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 12th May 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 18th Aug. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 14th May 10am GMT and Monday 18th May 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 20th Aug. 10am GMT and Monday 24th Aug. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3.4 is due to release (has been approved)
*YP 6.1 M3 is due in two weeks and this will be the feature freeze point for YP 6.1.
*YP 6.0 is due to release (has been approved)
*AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
*We would like to remind everyone that AI-generated code submitted to Yocto Project must include disclosure of the use of AI tools, in line with our policy in the contributor guide (https://docs.yoctoproject.org/contributor-guide/submit-changes.html#acceptance-of-ai-generated-code). Joshua has sent patches adding AGENTS.md files to bitbake and openembedded-core to prompt agents to follow this policy. We are discussing further updates to our policy on AI assisted submissions as this is a rapidly evolving area.
*Intermittent build failures continue to be problematic
*There have been locking changes with do_fetch/do_unpack within the bitbake fetcher to allow better performance of builds with shared DL_DIRs. There are also performance improvements to the handling of repeated ssl connection queries.
*We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
*There is discussion on the architecture list about how we could improve the fetcher, particularly around how recursion is handled in git submodules: https://lists.openembedded.org/g/openembedded-architecture/message/2416
*Master is open for new development
*We continue to try and keep up to date with upstream releases through the AUH, big thanks to those sending version updates and fixing version update issues.
*We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.
*There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
**Matchbox-wm segfault/xserver restart
**aarch64/x86-64 build host contamination/reproducibility issue
We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.
*Remaining intermittent build failures of concern:
**other qemu ‘hang’ type issues on ARM
**sometimes yocto-check-layer is showing checksum mismatch issues
**intermittent ptest failures in many recipes


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 29: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2688 (last week 2698) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2704 (last week 2694) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1087 (last week 1087)
**Total patches found: 1030 (last week 1028)
**Patches in the Pending State: 146 (13%) [last week 146 (13%)]
**Patches in the Pending State: 139 (14%) [last week 139 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''Upcoming development releases:'''<br/>
*6.1 M3:
**Build Date: w/c 2026-08-31
**Release Date: w/c 2026-09-14
*6.1.0:
**Build Date (M4): w/c 2026-10-12
**Release Date: w/c 2026-11-02


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.3.4 is due to release
*YP 6.0.3 due to release
*YP 5.0.18
**Release Date w/c 2026-08-24
**Build Date 2026-05-11
*YP 5.0.20
**Release Date 2026-05-25
**Build Date w/c 2026-08-17
*YP 6.0.1
**Release Date w/c 2026-08-31
**Build Date 2026-05-18
*YP 6.0.4
**Release Date 2026-06-01
**Build Date w/c 2026-09-28
**Release Date w/c 2026-10-12
*YP 5.0.21
**Build Date w/c 2026-10-05
**Release Date w/c 2026-10-19
 
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar



Latest revision as of 14:45, 18 August 2026

Yocto Project Status 18 August 2026

Current Dev Position: YP 6.1 M3
Next Deadline: YP 6.1 M3: w/c 2026-08-31

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 6.1 M3 is due in two weeks and this will be the feature freeze point for YP 6.1.
  • AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
  • We would like to remind everyone that AI-generated code submitted to Yocto Project must include disclosure of the use of AI tools, in line with our policy in the contributor guide (https://docs.yoctoproject.org/contributor-guide/submit-changes.html#acceptance-of-ai-generated-code). Joshua has sent patches adding AGENTS.md files to bitbake and openembedded-core to prompt agents to follow this policy. We are discussing further updates to our policy on AI assisted submissions as this is a rapidly evolving area.
  • There have been locking changes with do_fetch/do_unpack within the bitbake fetcher to allow better performance of builds with shared DL_DIRs. There are also performance improvements to the handling of repeated ssl connection queries.
  • There is discussion on the architecture list about how we could improve the fetcher, particularly around how recursion is handled in git submodules: https://lists.openembedded.org/g/openembedded-architecture/message/2416
  • We continue to try and keep up to date with upstream releases through the AUH, big thanks to those sending version updates and fixing version update issues.
  • There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
    • Matchbox-wm segfault/xserver restart
    • aarch64/x86-64 build host contamination/reproducibility issue

We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.

  • Remaining intermittent build failures of concern:
    • other qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • intermittent ptest failures in many recipes

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 6.0.3 due to release
    • Release Date w/c 2026-08-24
  • YP 5.0.20
    • Build Date w/c 2026-08-17
    • Release Date w/c 2026-08-31
  • YP 6.0.4
    • Build Date w/c 2026-09-28
    • Release Date w/c 2026-10-12
  • YP 5.0.21
    • Build Date w/c 2026-10-05
    • Release Date w/c 2026-10-19

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives