Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(25 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Status 28 April 2026 ==
== Yocto Project Status 20 October 2026 ==
Current Dev Position: YP 6.0 M4<br/>
Current Dev Position: YP 6.2 M1 - Development<br/>
Next Deadline: YP 6.0 Release Date w/c 2026-05-04<br/>
Next Deadline: YP 6.2 M1: w/c 2026-12-21 <br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 30th Apr. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 22nd Oct. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 29th Apr. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 20th Oct. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 30th Apr. 10am GMT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 22nd Oct. 10am GMT and Monday 26th Oct. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.0.35 is due to release
*YP 6.1 is due for release
*YP 5.3.4 is in QA
*YP 6.0.4 is due for release
*YP 6.0 rc1 is in QA
*YP 5.0.21 is under review
*There will be no patch review on Monday 4th May due to public holidays.
*Patches for 6.2 have started merging into master
*We continue to triage the CVEs being reported by the new tooling.
*Reproducibility issues between different build archs is looking much better, we have remaining issues in systemtap, rust, rpm-sequoia, mesa and rpm.
*There were some last minute changes to DISTRO_FEATURES behaviour to resolve some usability issues that users identified.
*There are issues where we could accept help:
*There have been several issues in pseudo identified and these have been fixed in the various pseudo point releases. We will upgrade pseudo in 6.0.1 to pull these in.
**Matchbox-wm segfault/xserver restart
*There have been issues with 403 errors from crates.io, there is a change in bitbake to use the preferred upstream urls via their CDN.
**Remaining github.com references in bitbake-selftest
*The kvm cpu features issue looks to be a host system CPU microcode issue and using the latest microcode appears to have resolved the issues.
*We will update rsync to v3.5.1 on scarthgap & wrynose. This is an exception to the usual process as the backported CVE patches were not reviewable or maintainable.
*git:// protocol access to git.yoctoproject.org and git.openembeded.org is deprecated and going forward https:// URLs should be used to access git repositories. We are aiming to discontinue git protocol use.
*Big thanks to Tim Orling for key fixes for layerindex and error reporting
*We’re working through the backlog of patches and intermittent build failures are still problematic. We continue to struggle for bandwidth for changes needing in depth review/feedback but are trying to clear the backlog.
*Builds are now working on Fedora 45 thanks to a pseudo fix and fetcher tweaks for wget v2
*UK and European daylight savings time finishes this Sunday, some meeting times track US Pacific timezone so double check your calendars next week.
*The CFP is now open for the OpenEmbedded Workshop to be held in Brussels on Feb 1st 2027.
*Thanks to everyone who attended the Dev Day or came and saw us in Prague. This was the largest Yocto Dev Day so far!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 33: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2788 (last week 2790) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2699 (last week 2659) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1085 (last week 1078)
**Total patches found: 1044 (last week 1041)
**Patches in the Pending State: 146 (13%) [last week 147 (14%)]
**Patches in the Pending State: 135 (13%) [last week 135 (13%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/3
 
'''Upcoming development releases:'''<br/>
*6.1.0: is due for release
*YP 6.2 M1
**Build Date w/c 2026-12-07
**Release Date w/c 2026-12-21
*YP 6.2 M2
**Build Date w/c 2027-01-18
**Release Date w/c 2027-02-01
*YP 6.2 M3
**Build Date w/c 2027-03-01
**Release Date w/c 2027-03-15
*YP 6.2.0
**Build Date w/c 2027-04-26
**Release Date w/c 2027-05-03


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.35 is in review.
*YP 6.0.4 is due for release
*YP 5.3.4 is in QA
*YP 5.0.21 is in review
**Release Date 2026-05-06
*YP 6.1.1
*YP 5.0.18
**Build Date w/c 2026-11-16
**Build Date   2026-05-11
**Release Date w/c 2026-11-30
**Release Date 2026-05-25
*YP 6.0.5
**Build Date w/c 2026-11-23
**Release Date w/c 2026-12-07
*YP 5.0.22
**Build Date w/c 2026-11-30
**Release Date w/c 2026-12-14
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar



Latest revision as of 14:50, 20 October 2026

Yocto Project Status 20 October 2026

Current Dev Position: YP 6.2 M1 - Development
Next Deadline: YP 6.2 M1: w/c 2026-12-21

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 6.1 is due for release
  • YP 6.0.4 is due for release
  • YP 5.0.21 is under review
  • Patches for 6.2 have started merging into master
  • Reproducibility issues between different build archs is looking much better, we have remaining issues in systemtap, rust, rpm-sequoia, mesa and rpm.
  • There are issues where we could accept help:
    • Matchbox-wm segfault/xserver restart
    • Remaining github.com references in bitbake-selftest
  • We will update rsync to v3.5.1 on scarthgap & wrynose. This is an exception to the usual process as the backported CVE patches were not reviewable or maintainable.
  • Big thanks to Tim Orling for key fixes for layerindex and error reporting
  • Builds are now working on Fedora 45 thanks to a pseudo fix and fetcher tweaks for wget v2
  • UK and European daylight savings time finishes this Sunday, some meeting times track US Pacific timezone so double check your calendars next week.
  • The CFP is now open for the OpenEmbedded Workshop to be held in Brussels on Feb 1st 2027.
  • Thanks to everyone who attended the Dev Day or came and saw us in Prague. This was the largest Yocto Dev Day so far!

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1.0: is due for release
  • YP 6.2 M1
    • Build Date w/c 2026-12-07
    • Release Date w/c 2026-12-21
  • YP 6.2 M2
    • Build Date w/c 2027-01-18
    • Release Date w/c 2027-02-01
  • YP 6.2 M3
    • Build Date w/c 2027-03-01
    • Release Date w/c 2027-03-15
  • YP 6.2.0
    • Build Date w/c 2027-04-26
    • Release Date w/c 2027-05-03

Upcoming dot releases:

  • YP 6.0.4 is due for release
  • YP 5.0.21 is in review
  • YP 6.1.1
    • Build Date w/c 2026-11-16
    • Release Date w/c 2026-11-30
  • YP 6.0.5
    • Build Date w/c 2026-11-23
    • Release Date w/c 2026-12-07
  • YP 5.0.22
    • Build Date w/c 2026-11-30
    • Release Date w/c 2026-12-14
  • For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC