Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
Line 1: Line 1:
== Yocto Project Status 14 April 2026 ==
== Yocto Project Status 21 April 2026 ==
Current Dev Position: YP 6.0 M4<br/>
Current Dev Position: YP 6.0 M4<br/>
Next Deadline: YP 6.0 M4 Build Date 2026-04-20<br/>
Next Deadline: YP 6.0 M4 Build Date 2026-04-20<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Apr. 16th 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Apr. 23rd 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Apr. 14th 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Apr. 21st 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Apr. 16th 10am GMT and Monday Apr. 20th 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday Apr. 23rd 10am GMT and Monday Apr. 27th 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.17 is due to be released
*YP 5.0.17 was released
*YP 6.0 M3 is in QA
*YP 6.0 M3 was released
*YP 4.0.35 is queued for QA
*YP 4.0.35 is in QA
*We have converted over to sbom-cve-check and dropped cve-check. This has caused a significant increase in CVEs reported, these are being triaged.
*YP 6.0 M4 is due to build
*Issues with pending work needed:
*We continue to triage the CVEs being reported by the new tooling.
*Various fixes have merged or are planned to merge before the M4 release build:
**Various CVE issue resolutions from CVE triage
**Reproducibility issues with strace/apr-util
**Make race in groff
**Shadow-native tallylog issue fix
**Upgrade of barebox to align with an LTS release
**Implementation of a wrapper for openat2, fixing Fedora 44 beta build failures
**Sbom-cve-check upgrade (along with dependencies)
*Issues still pending:
**32bit x86 kvm seemingly broken with certain CPU features (#16074)
**32bit x86 kvm seemingly broken with certain CPU features (#16074)
**Reports of pseudo errors on Fedora 44 beta related to openat2()
**Intermittent qemu boot failures of qemuarmv5 (and possibly qemuarm) since the last kernel upgrade
**Intermittent qemu boot failures of qemuarmv5 (and possibly qemuarm) since the last kernel upgrade
**Meta-oe cve layer filtering under new tooling (metrics script tweak?)
**Intermittent wic failures on the autobuilder
**Reprodicubility issues with strace/apr-util after gnulib macro changes (patches in testing)
*At this point we will likely run the release build as the remaining issues aren’t critical to end users and we have no clear timeframe for resolution of them
*There was disruption to git services last week due to scraping attacks against the servers. This resulted in connection issues whilst those were mitigated, particularly the git protocol access.
git:// protocol access to git.yoctoproject.org and git.openembeded.org is deprecated and going forward https:// URLs should be used to access git repositories. We are aiming to discontinue git protocol use.
git:// protocol access to git.yoctoproject.org and git.openembeded.org is deprecated and going forward https:// URLs should be used to access git repositories. We are aiming to discontinue git protocol use.
*The recent wic changes will need wic support files to be placed in files/wic within layers going forwards.
*We’re working through the backlog of patches and intermittent build failures are still problematic. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
*We’re working through the backlog of patches and intermittent build failures are still problematic, including the emergence of new issues (newer kernel version?). We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
*The final whinlatter build is happening this week.
*The final kirkstone build has taken place and we’re no longer planning to merge patches on this branch.
*If you have any final patches for whinlatter, please get these sent to the list ASAP.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 38: Line 43:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2777 (last week 2797) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2790 (last week 2777) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1072 (last week 1060)
**Total patches found: 1078 (last week 1072)
**Patches in the Pending State: 147 (14%) [last week 148 (14%)]
**Patches in the Pending State: 146 (14%) [last week 147 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M3 in QA.
*YP 6.0 M4 Build Date 2026-04-13
*YP 6.0 M4 Release Date 2026-05-04


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.17 is in review.
*YP 5.0.17 was released.
*YP 4.0.35 is in QA.
*YP 4.0.35 is in QA.
*YP 5.3.4
*YP 5.3.4

Latest revision as of 14:47, 21 April 2026

Yocto Project Status 21 April 2026

Current Dev Position: YP 6.0 M4
Next Deadline: YP 6.0 M4 Build Date 2026-04-20

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.0.17 was released
  • YP 6.0 M3 was released
  • YP 4.0.35 is in QA
  • YP 6.0 M4 is due to build
  • We continue to triage the CVEs being reported by the new tooling.
  • Various fixes have merged or are planned to merge before the M4 release build:
    • Various CVE issue resolutions from CVE triage
    • Reproducibility issues with strace/apr-util
    • Make race in groff
    • Shadow-native tallylog issue fix
    • Upgrade of barebox to align with an LTS release
    • Implementation of a wrapper for openat2, fixing Fedora 44 beta build failures
    • Sbom-cve-check upgrade (along with dependencies)
  • Issues still pending:
    • 32bit x86 kvm seemingly broken with certain CPU features (#16074)
    • Intermittent qemu boot failures of qemuarmv5 (and possibly qemuarm) since the last kernel upgrade
    • Intermittent wic failures on the autobuilder
  • At this point we will likely run the release build as the remaining issues aren’t critical to end users and we have no clear timeframe for resolution of them

git:// protocol access to git.yoctoproject.org and git.openembeded.org is deprecated and going forward https:// URLs should be used to access git repositories. We are aiming to discontinue git protocol use.

  • We’re working through the backlog of patches and intermittent build failures are still problematic. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
  • The final whinlatter build is happening this week.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming dot releases:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives