Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(8 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Status 17 March 2026 ==
== Yocto Project Status 12 May 2026 ==
Current Dev Position: YP 6.0 M3<br/>
Current Dev Position: YP 6.1 M1<br/>
Next Deadline: YP 6.0 M3 Build Date 2026-03-23<br/>
Next Deadline: YP 6.1 M1: w/c 2026-06-08<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 19th Mar. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 14th May 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 17th Mar. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 12th May 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 19th Mar. 10am GMT and Monday 23rd Mar. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 14th May 10am GMT and Monday 18th May 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3.2 has been released
*YP 5.3.4 is due to release (has been approved)
*YP 6.0 M2 is due to be released
*YP 6.0 is due to release (has been approved)
*YP 4.0.34 is in QA.
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
*YP 6.0 M3 is the feature freeze for 6.0 which is our next LTS.
*Intermittent build failures continue to be problematic
*YP 6.0 M3 is due to build next week however there are many key changes needed still missing.
*We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
*We have issues we need to resolve before M3:
*Master is open for new development
**x86 kvm seemingly broken with certain CPU features (#16074)
*We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.
**AB-INT: opkg-build segmentation fault (memory corruption in pseudo?) (#16078)
**Failure to generate regression reports in release builds
**Allowing non-destructive git fetcher updates for bitbake-setup.
**Splitting wic into an external tool.
**Switching to pkg-config.
**Deprecation of ltp (upstream dropped runltp and mandate kirk)
**How to improve DEBUG_BUILD?
**DISTRO_FEATURES defaults improvements.
**SBOM/cve-check changes.
**Reconcile poky and OE-Core defaults templates.
**Resolve Fedora 43 selftest failures
*glibc was upgraded 2.43 and we released a new uninative to match
*runqemu now has better handling for different display outputs including VNC on unix domain sockets
*We are adding testing of ptests on musl to our test matrix
*Kernel rust support has merged
*We’re working through the backlog of patches and intermittent build failures are still problematic. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
*On scarthgap, we have updated to openssl 3.5 since that is still maintained
*Thanks to everyone who helped out with the booth at Embedded World, it was a great success!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 47: Line 29:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2841 (last week 2866) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2688 (last week 2698) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1069 (last week 1081)
**Total patches found: 1087 (last week 1087)
**Patches in the Pending State: 152 (14%) [last week 151 (14%)]
**Patches in the Pending State: 146 (13%) [last week 146 (13%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M2 is ready for release.
*YP 6.0 M3 Build Date 2026-03-23
*YP 6.0 M3 Release Date 2026-04-08
*YP 6.0 M4 Build Date 2026-04-13
*YP 6.0 M4 Release Date 2026-05-04


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.3.2 is released.
*YP 5.3.4 is due to release
*YP 4.0.34 is in QA.
*YP 5.0.18
*YP 5.3.3 is in QA.
**Build Date 2026-05-11
*YP 5.0.17 Build Date 2026-03-30
**Release Date 2026-05-25
*YP 5.0.17 Release Date 2026-04-15
*YP 6.0.1
*YP 4.0.35 Build Date 2026-04-06
**Build Date 2026-05-18
*YP 4.0.35 Release Date 2026-04-22
**Release Date 2026-06-01
*YP 5.3.4 Build Date 2026-04-20
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*YP 5.3.4 Release Date 2026-05-06
*YP 5.0.18 Build Date 2026-04-27
*YP 5.0.18 Release Date 2026-05-13
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:45, 12 May 2026

Yocto Project Status 12 May 2026

Current Dev Position: YP 6.1 M1
Next Deadline: YP 6.1 M1: w/c 2026-06-08

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3.4 is due to release (has been approved)
  • YP 6.0 is due to release (has been approved)
  • We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
  • Intermittent build failures continue to be problematic
  • We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
  • Master is open for new development
  • We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming dot releases:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives