Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(17 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Status 3 February 2026 (WW06) ==
== Yocto Project Status 12 May 2026 ==
Current Dev Position: YP 6.0 M2<br/>
Current Dev Position: YP 6.1 M1<br/>
Next Deadline: YP 6.0 M2 Build Date 2026-02-16<br/>
Next Deadline: YP 6.1 M1: w/c 2026-06-08<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 5th Feb. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 14th May 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 3rd Feb. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 12th May 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 5th Feb. 10am GMT and Monday 9th Feb. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 14th May 10am GMT and Monday 18th May 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3.1 is due to be released
*YP 5.3.4 is due to release (has been approved)
*YP 6.0 M1 is in QA
*YP 6.0 is due to release (has been approved)
*YP 4.0.33 is queued for QA after 6.0 M1
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
*YP 6.0 M2 is now targeting a build date of 16th Feb. This will give us three weeks each for M3 (target date 9th March) and M4 (target build date 30th March).
*Intermittent build failures continue to be problematic
*Good progress has been made with the autobuilder issues but we still don’t have the stability in builds we need for reliable project operations.
*We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
*There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved (Thanks Alex and Michael!):
*Master is open for new development
**Issues reusing binaries from fedora 42/43 on older systems (#16087)
*We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.
**Hangs of the autobuilder controller (database locking?) (#16129)
**Generation of releases.json needs updating (#16138)
*Two are currently needing further work:
**rust do_test_compile/do_install segfault (#16058)
**x86 kvm broken on Fedora 43 (#16074)
*“build-sysroots: useradd command did not succeed” (#16135) was fixed, thanks Adrian!
*The number of intermittent failures affecting builds, both stable and development, continues to be problematic. Any given build is now statistically likely to hit one or more of them and we often don’t have successful builds. Since we struggle to get help in addressing these, we need to change and start potentially blocking releases (including stable/LTS) until these get addressed in some way. We are holding some dedicated meetings to triage these and find ways of removing the failures from our builds which may include reducing testing.
*Patches are merging again but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 37: Line 29:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2945 (last week 2978) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2688 (last week 2698) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1100 (last week 1097)
**Total patches found: 1087 (last week 1087)
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
**Patches in the Pending State: 146 (13%) [last week 146 (13%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M2 Build Date 2026-02-16
*YP 6.0 M2 Release Date 2026-02-27
*YP 6.0 M3 Build Date 2026-03-09
*YP 6.0 M3 Release Date 2026-03-20
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.3.1 is under review.
*YP 5.3.4 is due to release
*YP 4.0.33 is queued for QA after 6.0 M1.
*YP 5.0.18
*YP 5.0.16 Build Date 2026-02-09
**Build Date 2026-05-11
*YP 5.0.16 Release Date 2026-02-20
**Release Date 2026-05-25
*YP 5.3.2 Build Date 2026-02-16
*YP 6.0.1
*YP 5.3.2 Release Date 2026-02-27
**Build Date 2026-05-18
*YP 4.0.34 Build Date 2026-02-23
**Release Date 2026-06-01
*YP 4.0.34 Release Date 2026-03-06
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*YP 5.3.3 Build Date 2026-03-09
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:45, 12 May 2026

Yocto Project Status 12 May 2026

Current Dev Position: YP 6.1 M1
Next Deadline: YP 6.1 M1: w/c 2026-06-08

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3.4 is due to release (has been approved)
  • YP 6.0 is due to release (has been approved)
  • We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
  • Intermittent build failures continue to be problematic
  • We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
  • Master is open for new development
  • We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming dot releases:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives