== Yocto Project Weekly Status Jan. 13th, 2026 ==
== Yocto Project Status 20 October 2026 ==
Current Dev Position: YP 6.0 M1<br/>
Current Dev Position: YP 6.2 M1 - Development<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>
Next Deadline: YP 6.2 M1: w/c 2026-12-21 <br/>
6
 
'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 15th Jan. 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 22nd Oct. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 13th Jan. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 20th Oct. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 15th Jan. 10am GMT and Monday 19th Jan. 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday 22nd Oct. 10am GMT and Monday 26th Oct. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.15 is under review.
*YP 6.1 is due for release
*YP 5.3.1 is in QA
*YP 6.0.4 is due for release
*YP 6.0 M1 will build when the 5 open high bugs are resolved.
*YP 5.0.21 is under review
*There are also 4 high bugs open for 6.0 M2.
*Patches for 6.2 have started merging into master
*We are seeing multiple serious issues blocking 6.0 M1 from building:
*Reproducibility issues between different build archs is looking much better, we have remaining issues in systemtap, rust, rpm-sequoia, mesa and rpm.
**A glibc test causing builds to hang (a buffer overflow SIGABRT in unfs3 triggered by host compiler + fortify source) (#16113)
*There are issues where we could accept help:
**Hangs of the autobuilder controller (database locking, should be fixed) (#16129)
**Matchbox-wm segfault/xserver restart
**Issues with a CVE patch applied to tar in rocky9/alma9/centos-stream using the openat2 syscall which pseudo doesn’t wrap (#16117)
**Remaining github.com references in bitbake-selftest
**Issues reusing binaries from fedora 43 (and maybe ubuntu 25.10) on older systems (patchelf triggered?) (#16074, #16087)
*We will update rsync to v3.5.1 on scarthgap & wrynose. This is an exception to the usual process as the backported CVE patches were not reviewable or maintainable.
**still need to disable the npm fetcher (#16105)
*Big thanks to Tim Orling for key fixes for layerindex and error reporting
*We have not had this number of high bugs blocking releases in several years
*Builds are now working on Fedora 45 thanks to a pseudo fix and fetcher tweaks for wget v2
*The number of intermittent failures affecting stable release builds is becoming problematic. Any given build is now statistically likely to hit one or more of them and we don’t have successful builds. Since we struggle to get help in addressing these, we need to change and start potentially blocking releases (including stable/LTS) until these get addressed in some way. We plan to form a dedicated team to investigate these and find ways of removing the failures from our builds which may include reducing testing.
*UK and European daylight savings time finishes this Sunday, some meeting times track US Pacific timezone so double check your calendars next week.
*To be clear, due to the problems above, most patch testing is now stalled as the autobuilder is currently inoperable and we can’t test anything.
*The CFP is now open for the OpenEmbedded Workshop to be held in Brussels on Feb 1st 2027.
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
*Thanks to everyone who attended the Dev Day or came and saw us in Prague. This was the largest Yocto Dev Day so far!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 36: Line 36:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 3026 (last week 3011) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2699 (last week 2659) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1089 (last week 1092)
**Total patches found: 1044 (last week 1041)
**Patches in the Pending State: 151 (14%) [last week 151 (14%)]
**Patches in the Pending State: 135 (13%) [last week 135 (13%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/3
 
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M1 Build Date 2026-01-05
*YP 6.0 M1 Release Date 2026-01-16
*YP 6.0 M2 Build Date 2026-02-02
*YP 6.0 M2 Release Date 2026-02-13
*YP 6.0 M3 Build Date 2026-03-02
*YP 6.0 M3 Release Date 2026-03-13
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26


'''Upcoming development releases:'''<br/>
*6.1.0: is due for release
*YP 6.2 M1
**Build Date w/c 2026-12-07
**Release Date w/c 2026-12-21
*YP 6.2 M2
**Build Date w/c 2027-01-18
**Release Date w/c 2027-02-01
*YP 6.2 M3
**Build Date w/c 2027-03-01
**Release Date w/c 2027-03-15
*YP 6.2.0
**Build Date w/c 2027-04-26
**Release Date w/c 2027-05-03


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.15 is under review.
*YP 6.0.4 is due for release
*YP 5.3.1 in QA.
*YP 5.0.21 is in review
*YP 4.0.33 Build Date 2026-01-26
*YP 6.1.1
*YP 4.0.33 Release Date 2026-01-30
**Build Date w/c 2026-11-16
*YP 5.0.16 Build Date 2026-02-09
**Release Date w/c 2026-11-30
*YP 5.0.16 Release Date 2026-02-20
*YP 6.0.5
*YP 5.3.2 Build Date 2026-02-16
**Build Date w/c 2026-11-23
*YP 5.3.2 Release Date 2026-02-27
**Release Date w/c 2026-12-07
*YP 4.0.34 Build Date 2026-02-23
*YP 5.0.22
*YP 4.0.34 Release Date 2026-03-06
**Build Date w/c 2026-11-30
*YP 5.3.3 Build Date 2026-03-09
**Release Date w/c 2026-12-14
*YP 5.3.3 Release Date 2026-03-20
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:50, 20 October 2026

Yocto Project Status 20 October 2026

Current Dev Position: YP 6.2 M1 - Development
Next Deadline: YP 6.2 M1: w/c 2026-12-21

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 6.1 is due for release
  • YP 6.0.4 is due for release
  • YP 5.0.21 is under review
  • Patches for 6.2 have started merging into master
  • Reproducibility issues between different build archs is looking much better, we have remaining issues in systemtap, rust, rpm-sequoia, mesa and rpm.
  • There are issues where we could accept help:
    • Matchbox-wm segfault/xserver restart
    • Remaining github.com references in bitbake-selftest
  • We will update rsync to v3.5.1 on scarthgap & wrynose. This is an exception to the usual process as the backported CVE patches were not reviewable or maintainable.
  • Big thanks to Tim Orling for key fixes for layerindex and error reporting
  • Builds are now working on Fedora 45 thanks to a pseudo fix and fetcher tweaks for wget v2
  • UK and European daylight savings time finishes this Sunday, some meeting times track US Pacific timezone so double check your calendars next week.
  • The CFP is now open for the OpenEmbedded Workshop to be held in Brussels on Feb 1st 2027.
  • Thanks to everyone who attended the Dev Day or came and saw us in Prague. This was the largest Yocto Dev Day so far!

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1.0: is due for release
  • YP 6.2 M1
    • Build Date w/c 2026-12-07
    • Release Date w/c 2026-12-21
  • YP 6.2 M2
    • Build Date w/c 2027-01-18
    • Release Date w/c 2027-02-01
  • YP 6.2 M3
    • Build Date w/c 2027-03-01
    • Release Date w/c 2027-03-15
  • YP 6.2.0
    • Build Date w/c 2027-04-26
    • Release Date w/c 2027-05-03

Upcoming dot releases:

  • YP 6.0.4 is due for release
  • YP 5.0.21 is in review
  • YP 6.1.1
    • Build Date w/c 2026-11-16
    • Release Date w/c 2026-11-30
  • YP 6.0.5
    • Build Date w/c 2026-11-23
    • Release Date w/c 2026-12-07
  • YP 5.0.22
    • Build Date w/c 2026-11-30
    • Release Date w/c 2026-12-14
  • For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives