Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Yocto Project Weekly Status June 24th, 2025 ==
== Yocto Project Weekly Status Sept. 2nd, 2025 ==
Current Dev Position: YP 5.3 M2<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 5.3 M2 Build date 2025-07-21<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday June 26th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Sept. 4th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday June 24th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Sept. 2nd at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday June 26th 10am GMT and Monday June 30th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Sept. 4th 10am GMT and Monday Sept. 8th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3 M1 is in QA
*RP is on holiday this week so should not be working
*Patches continue to merge into master for upgrades and fixes.
*YP 5.2.3 is being reviewed for release.
*The UNPACKDIR layout changes merged. This has been disruptive for layers and it will take a while for changes to filter through various layers. It does set up better in the future with tools like devtool to avoid having lots of legacy layouts to support, and cleans up git recipes to be easier to write going forward.
*YP 5.0.12 is in QA
*To support this, the layer series was updated to whinlatter in core.
*YP 5.3 M3 is due to build shortly (and is feature freeze)
*The clang build time and size increases continue to cause significant concern.
*Linux 6.16 has been integrated but is currently not the default
*There are patches in progress for improving gomod support in devtool and the mirroring issue for gomod was resolved.The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*Patches continue to merge into master for upgrades and fixes until M3 is built
*Support for BUILDHISTORY_RESET was removed as it was error prone and better handled on the CI side of integration.
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*OE-Core is adopting the use of glvnd for libGL abstraction
*A new version of bitbake-setup is in master-next and is making huge progress in readiness, thanks Alexander Kanavin!
*The initial RISC-V tune changes merged
*The Embedded Linux Conference was a success, with lots of Yocto-related talks being full to capacity. The OpenEmbedded and Yocto Project mini conferences were well attended and very interesting. Thanks to everyone who attended and made it a great event!
*Support for distro/machine selection with builtin fragments was added.
*A section was added to the manual on primary and secondary architecture/feature support for Yocto Project: https://docs.yoctoproject.org/dev/ref-manual/yocto-project-supported-features.html
*An email about this was sent to the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/message/2162
*For M2, the following changes have been mentioned as possibilities:
**bitbake-setup
**wic split from OE-Core
**RISC-V tune changes (part 2)
**go/gomod fetcher changes
**switch classextend to use [filter] support from bitbake


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 42: Line 33:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2778 (last week 2777) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2845 (last week 2835) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1093 (last week 1084)
**Total patches found: 1095 (last week 1096)
**Patches in the Pending State: 157 (14%) [last week 158 (19%)]
**Patches in the Pending State: 155 (14%) [last week 156 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M1 in QSA.
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M2 Release Date 2025-08-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M3 Release Date 2025-09-12
Line 58: Line 46:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.28 Build Date 2025-06-30
*YP 5.2.3 is being reviewed for release.
*YP 4.0.28 Release Date 2025-07-11
*YP 5.0.12 is in QA.
*YP 5.2.2 Build Date 2025-07-07
*YP 5.2.2 Release Date 2025-07-18
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Release Date 2025-07-25
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Release Date 2025-08-25
*YP 5.2.3 Build Date 2025-08-18
*YP 5.2.3 Release Date 2025-08-29
*YP 5.0.12 Build Date 2025-08-25
*YP 5.0.12 Release Date 2025-09-05
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 4.0.30 Release Date 2025-10-03

Latest revision as of 14:47, 2 September 2025

Yocto Project Weekly Status Sept. 2nd, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • RP is on holiday this week so should not be working
  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is in QA
  • YP 5.3 M3 is due to build shortly (and is feature freeze)
  • Linux 6.16 has been integrated but is currently not the default
  • Patches continue to merge into master for upgrades and fixes until M3 is built
  • The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
  • A new version of bitbake-setup is in master-next and is making huge progress in readiness, thanks Alexander Kanavin!
  • The Embedded Linux Conference was a success, with lots of Yocto-related talks being full to capacity. The OpenEmbedded and Yocto Project mini conferences were well attended and very interesting. Thanks to everyone who attended and made it a great event!

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is in QA.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives