== Yocto Project Weekly Status May 13th, 2025 ==
== Yocto Project Weekly Status Sept. 2nd, 2025 ==
Current Dev Position: YP 5.3 M1<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 5.3 M1 Build date 2025-06-09<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday May 15th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday Sept. 4th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday May 13th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday Sept. 2nd at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday May 15th 10am GMT and Monday May 19th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday Sept. 4th 10am GMT and Monday Sept. 8th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.2 was released
*RP is on holiday this week so should not be working
*We’re happy to announce that RISC-V is becoming a officially supported architecture for Yocto Project:  https://riscv.org/riscv-news/2025/05/risc-v-international-and-the-rise-project-join-forces-for-yocto-project-support/
*YP 5.2.3 is being reviewed for release.
**Thanks to all who helped make this happen!
*YP 5.0.12 is in QA
*Patches merged to switch pseudo from a directory exclusion list to a directory inclusion list. This change has long been requested but is now working and merged.
*YP 5.3 M3 is due to build shortly (and is feature freeze)
*The clang merge caused significant build time increases (nearly double) as well as image size increases, all of which we need analysis to try and mitigate if possible.
*Linux 6.16 has been integrated but is currently not the default
*Qemu changes upstream mean running it on 32 bit hosts may soon not be possible. 64 bit emulation on 32 bit hosts has already been dropped.
*Patches continue to merge into master for upgrades and fixes until M3 is built
*Network access outside of do_fetch now causes yocto-check-layer to fail which is a new change/requirement for Yocto Compatible v3. We need to work out how to handle this for go recipes in particular in meta-openembedded
*The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
*Many other good upgrades and fixes were merged to master.
*A new version of bitbake-setup is in master-next and is making huge progress in readiness, thanks Alexander Kanavin!
*The Embedded Linux Conference was a success, with lots of Yocto-related talks being full to capacity. The OpenEmbedded and Yocto Project mini conferences were well attended and very interesting. Thanks to everyone who attended and made it a great event!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 32: Line 33:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2753 (last week 2756) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2845 (last week 2835) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1075 (last week 1071)
**Total patches found: 1095 (last week 1096)
**Patches in the Pending State: 140 (13%) [last week 140 (13%)]
**Patches in the Pending State: 155 (14%) [last week 156 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/
'''YP 5.2 Milestone Dates:'''<br/>
*YP 5.2 M4 was released.


'''YP 5.3 Milestone Dates:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 5.3 M1 Build Date 2025-06-09
*YP 5.3 M1 Release Date 2025-06-20
*YP 5.3 M2 Build Date 2025-07-21
*YP 5.3 M2 Release Date 2025-08-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Build Date 2025-09-01
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M3 Release Date 2025-09-12
Line 52: Line 46:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.27 Build Date 2025-05-19
*YP 5.2.3 is being reviewed for release.
*YP 4.0.27 Release Date 2025-05-30
*YP 5.0.12 is in QA.
*YP 5.2.1 Build Date 2025-05-26
*YP 5.2.1 Build Date 2025-06-06
*YP 5.0.10 Build Date 2025-06-02
*YP 5.0.10 Release Date 2025-06-13
*YP 4.0.28 Build Date 2025-06-30
*YP 4.0.28 Release Date 2025-07-11
*YP 5.2.2 Build Date 2025-07-07
*YP 5.2.2 Release Date 2025-07-18
*YP 5.0.11 Build Date 2025-07-14
*YP 5.0.11 Release Date 2025-07-25
*YP 4.0.29 Build Date 2025-08-11
*YP 4.0.29 Release Date 2025-08-25
*YP 5.2.3 Build Date 2025-08-18
*YP 5.2.3 Release Date 2025-08-29
*YP 5.0.12 Build Date 2025-08-25
*YP 5.0.12 Release Date 2025-09-05
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 4.0.30 Release Date 2025-10-03

Latest revision as of 14:47, 2 September 2025

Yocto Project Weekly Status Sept. 2nd, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • RP is on holiday this week so should not be working
  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is in QA
  • YP 5.3 M3 is due to build shortly (and is feature freeze)
  • Linux 6.16 has been integrated but is currently not the default
  • Patches continue to merge into master for upgrades and fixes until M3 is built
  • The main mirroring issues left are around “downloadfilename” support in urls which likely needs to be rewritten.
  • A new version of bitbake-setup is in master-next and is making huge progress in readiness, thanks Alexander Kanavin!
  • The Embedded Linux Conference was a success, with lots of Yocto-related talks being full to capacity. The OpenEmbedded and Yocto Project mini conferences were well attended and very interesting. Thanks to everyone who attended and made it a great event!

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is in QA.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16