== Yocto Project Weekly Status Dec. 3rd, 2024 ==
== Yocto Project Weekly Status Dec. 17th, 2024 ==
Current Dev Position: YP 5.2 M1<br/>
Current Dev Position: YP 5.2 M2<br/>
Next Deadline: YP 5.2 M1 Release date 2024-12-09<br/>
Next Deadline: YP 5.2 M2 Release date 2025-01-20<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Dec. 5th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Dec. 19th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync Tuesday Dec. 10th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync Tuesday Dec. 17th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester  
*Twitch -  See https://www.twitch.tv/theyoctojester  


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Yocto Project Summit is this week: https://www.yoctoproject.org/event/2024-12/
*We built YP 5.2 M1 which is waiting for QA
*YP 5.2 M1 is due to build next week
*YP 5.0.6 is in QA
*YP 4.0.23 was released
*YP 5.1.1 was released
*YP 5.1.1 is in QA
*The next status report will be 7th January due to holidays.
*Unfortunately the previously mentioned openssl relocation bug has been closed: https://github.com/openssl/openssl/pull/19260 due to nobody working on it
*Bitbake fragment support has merged in time for the M1 build, thanks Alex Kanavin!
*The yocto-check-layer script checks for disabled QA checks have been tightened to warn about a much larger number of disabled checks.
*A new bitbake “include_all” directive was also merged.
*Several improvements were merged to improve bitbake runqueue task processing speed. This fixed several slow builds that were reported, particularly mutliconfigs with large amounts of sstate overlap but other issues probably remain for other workloads.
*The kernel was upgraded to 6.12 which has significantly reduced the reported CVEs (344 -> 18).
*The speed of the NVD CVE API and the large number of kernel CVEs open continue to be significant concerns.
*rpm will have new dependencies on rust and clang to enable signing support
*The 5.2 development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing
*The 5.2 development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing
*We need to continue to develop this, thanks to all who have contributed so far!
*We need to continue to develop this, thanks to all who have contributed so far!
Line 32: Line 30:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2791 (last week 2736) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2838 (last week 2820) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1066 (last week 1073)
**Total patches found: 1046 (last week 1043)
**Patches in the Pending State: 177 (17%) [last week 178 (17%)]
**Patches in the Pending State: 175 (17%) [last week 176 (17%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
*https://autobuilder.yocto.io/-release/patchmetrics/


'''YP 5.2 Milestone Dates:'''<br/>
'''YP 5.2 Milestone Dates:'''<br/>
*YP 5.2 M1 Build Date 2024-12-09
*YP 5.2 M1 is in QA
*YP 5.2 M1 Release Date 2024-12-20
*YP 5.2 M2 Build Date 2025-01-20
*YP 5.2 M2 Build Date 2025-01-20
*YP 5.2 M2 Release Date 2025-01-31
*YP 5.2 M2 Release Date 2025-01-31
Line 49: Line 46:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.23 was released.
*YP 5.1.1 was released.
*YP 5.1.1 is in QA.
*YP 5.0.6 is in QA.
*YP 5.0.6 Build Date 2024-12-16
*YP 5.0.6 Release Date 2024-12-27
*YP 4.0.24 Build Date 2025-01-06
*YP 4.0.24 Build Date 2025-01-06
*YP 4.0.24 Release Date 2025-01-17
*YP 4.0.24 Release Date 2025-01-17

Latest revision as of 15:41, 17 December 2024

Yocto Project Weekly Status Dec. 17th, 2024

Current Dev Position: YP 5.2 M2
Next Deadline: YP 5.2 M2 Release date 2025-01-20

Next Team Meetings:

Key Status/Updates:

  • We built YP 5.2 M1 which is waiting for QA
  • YP 5.0.6 is in QA
  • YP 5.1.1 was released
  • The next status report will be 7th January due to holidays.
  • Bitbake fragment support has merged in time for the M1 build, thanks Alex Kanavin!
  • A new bitbake “include_all” directive was also merged.
  • The kernel was upgraded to 6.12 which has significantly reduced the reported CVEs (344 -> 18).
  • The 5.2 development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing
  • We need to continue to develop this, thanks to all who have contributed so far!

Ways to contribute:

  • As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
  • There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
  • There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
  • There are bugs that are currently unassigned for YP 5.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.2_Unassigned_Enhancements/Bugs
  • We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
  • Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
  • Help us resolve CVE issues: CVE metrics
  • We have a growing number of bugs in bugzilla, any help with them is appreciated.

Tracking Metrics:

YP 5.2 Milestone Dates:

  • YP 5.2 M1 is in QA
  • YP 5.2 M2 Build Date 2025-01-20
  • YP 5.2 M2 Release Date 2025-01-31
  • YP 5.2 M3 Build Date 2025-03-03
  • YP 5.2 M3 Release Date 2025-03-14
  • YP 5.2 M4 Build Date 2025-03-31
  • YP 5.2 M4 Release Date 2025-04-25

Upcoming dot releases:

  • YP 5.1.1 was released.
  • YP 5.0.6 is in QA.
  • YP 4.0.24 Build Date 2025-01-06
  • YP 4.0.24 Release Date 2025-01-17
  • YP 5.1.2 Build Date 2025-01-13
  • YP 5.1.2 Release Date 2025-01-24
  • YP 5.0.7 Build Date 2025-01-27
  • YP 5.0.7 Release Date 2025-02-07
  • YP 4.0.25 Build Date 2025-02-17
  • YP 4.0.25 Release Date 2025-02-28
  • YP 5.1.3 Build Date 2025-02-24
  • YP 5.1.3 Release Date 2025-03-07
  • YP 5.0.8 Build Date 2025-03-10
  • YP 5.0.8 Release Date 2025-03-21
  • YP 5.1.4 Build Date 2025-03-24
  • YP 5.1.4 Release Date 2025-04-04
  • YP 4.0.26 Build Date 2025-04-07
  • YP 4.0.26 Release Date 2025-04-18
  • YP 5.0.9 Build Date 2025-04-21
  • YP 5.0.9 Release Date 2025-05-02
  • YP 4.0.27 Build Date 2025-05-19
  • YP 4.0.27 Release Date 2025-05-30
  • YP 5.0.10 Build Date 2025-06-02
  • YP 5.0.10 Release Date 2025-06-13
  • YP 4.0.28 Build Date 2025-06-30
  • YP 4.0.28 Release Date 2025-07-11

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: