Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(492 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status Aug. 4, 2020 ==
== Yocto Project Weekly Status Sept. 9th, 2025 ==
Current Dev Position: YP 3.2 M3<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 3.2 M3 build date 2020/8/31<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Aug 6th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting - Thursday Sept. 11th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Aug 4th at 8am  PDT (https://zoom.us/j/990892712)
*Weekly Project Engineering Sync - Tuesday Sept. 9th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Aug 11th at 8am PDT (https://zoom.us/j/990892712)
*Yocto Project Patch Review - Thursday Sept. 11th 10am GMT and Monday Sept. 15th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Twitch -  See https://www.twitch.tv/theyoctojester
 
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*3.1.2 was released
*YP 5.2.3 is due to be released.
*3.2 M2 is currently under QA
*YP 5.0.12 is due to be released.
*We continue to see qemumips systemd (poky-altcfg) image testing failures for unknown reasons although it does seem linked to the poor performance of mips emulation under qemu.  
*YP 5.3 M3 is due to build soon
*The project has published a plan related to use of inclusive language within the project (covering Yocto Project and OpenEmbedded). This was posted to the openembedded-architecture list: https://lists.openembedded.org/g/openembedded-architecture/topic/inclusive_language_summary/75821819
*We’re at feature freeze for YP 5.3
*Documentation covering the potential “future directions” for Yocto Project has been published: https://lists.openembedded.org/g/openembedded-architecture/topic/yocto_project_future/75845140
*Updates to the 6.16 kernel are pending before the 5.3 M3 build
*You can see the rest of the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT Help with any of these would be much appreciated.
*We aim to merge bitbake-setup before building 5.3 M3
*One way to help the project is to help us with bugs that are currently unassigned but ideally needed during YP 3.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.2_Unassigned_Enhancements.2FBugs
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
*Help with any of the recent failed AUH recipe upgrades would also be appreciated.
*Patch merging is continuing as long as the risk for the changes are low
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
**Ecosystem Engineering and Operations Lead
**LTS Maintainer - Steve Sakoman is retiring in April 2026 (full details pending)
 
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''YP 3.2 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.2 M2 build is in QA
*WDD 2835 (last week 2845) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 3.2 M2 Release date 2020/8/7
*OE-Core/Poky Patch Metrics
*YP 3.2 M3 build date 2020/8/31
**Total patches found: 1111 (last week 1095)
*YP 3.2 M3 Release date 2020/9/11
**Patches in the Pending State: 156 (14%) [last week 155 (14%)]
*YP 3.2 M4 build date 2020/10/5
*https://autobuilder.yocto.io/-release/patchmetrics/
*YP 3.2 M4 Release date 2020/10/30


'''Planned upcoming dot releases:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 3.0.4 build date 2020/8/10
*YP 5.3 M3 Build Date 2025-09-01
*YP 3.0.4 release date 2020/8/21
*YP 5.3 M3 Release Date 2025-09-12
*YP 3.1.2 is released
*YP 5.3 M4 Build Date 2025-10-06
*YP 3.1.3 build date 2020/9/14
*YP 5.3 M4 Release Date 2025-10-31
*YP 3.1.3 release date 2020/9/25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2402 (last week 2415) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.2.3 is being reviewed for release.
*Poky Patch Metrics 
*YP 5.0.12 is being reviewed for release.
**Total patches found: 1271 (last week 1281)
*YP 4.0.30 Build Date 2025-09-22
**Patches in the Pending State: 495 (39%) [last week 498 (39%)]
*YP 4.0.30 Release Date 2025-10-03
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 44: Line 69:


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]

Latest revision as of 14:48, 9 September 2025

Yocto Project Weekly Status Sept. 9th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.2.3 is due to be released.
  • YP 5.0.12 is due to be released.
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3
  • Updates to the 6.16 kernel are pending before the 5.3 M3 build
  • We aim to merge bitbake-setup before building 5.3 M3
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026 (full details pending)

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is being reviewed for release.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives