== Yocto Project Weekly Status June 11, 2019 ==
== Yocto Project Weekly Status Sept. 9th, 2025 ==
Current Dev Position: YP 2.8 M2<br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 2.8 Milestone 2 Cutoff July 14th, 2019<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
 
*Bug Triage meeting - Thursday Sept. 11th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*SWAT lead is currently: Anuj
*Weekly Project Engineering Sync - Tuesday Sept. 9th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*SWAT team rotation: Anuj -> Paul on June 14, 2019
*Yocto Project Patch Review - Thursday Sept. 11th 10am GMT and Monday Sept. 15th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)
*SWAT team rotation: Paul -> Ross on June 21, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*Bug Triage meeting Thursday June 13th at 7:30am PDT (https://zoom.us/j/454367603)
*Monthly Project Meeting Tuesday July 2nd at 8am PDT (https://zoom.us/j/990892712)
*Twitch - Next event is Tuesday 11th June at 8am PDT (https://www.twitch.tv/yocto_project))


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*2.8 M1 has been built and rc2 is now undergoing QA (rc1 ran into an issue with a broken autobuilder worker).
*YP 5.2.3 is due to be released.
*Stephen continues to be unavailable, please refer any queries to Richard
*YP 5.0.12 is due to be released.
*Mailing lists are moving to groups.io instead of our current mailman setup. This shouldn’t impact users directly, more details will be sent to the mailing lists before the transfer. THe Yocto Project lists will move first, followed by OE, likely a week later.
*YP 5.3 M3 is due to build soon
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs
*We’re at feature freeze for YP 5.3
*We’re seeing an increasing number of intermittent failures which affect the autobuilder builds, causing problems for merging patches and for release builds. One cause, a long standing problem with gpg signing testing has finally been root caused and fixed. Several others keep appearing. There is a backlog of them in the bugzilla and we’re opening bugs for the new ones.
*Updates to the 6.16 kernel are pending before the 5.3 M3 build
*M1 isn’t of ideal quality, there are three ptest timeouts (2.7 had none). The ptest failure rate is however much improved. There is nobody actively working on some of the ptest timeout issues so holding the milestone build wouldn’t have made much difference but its a worrying sign for the project quality.
*We aim to merge bitbake-setup before building 5.3 M3
*M1 also has a couple of MIPS issues with the gcc9 upgrade. There doesn’t appear to be much interest in investigating and fixing these which raises questions about supporting the architecture within the project.
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
*There was a Yocto Project related article in LWN: https://lwn.net/Articles/788626/
*Patch merging is continuing as long as the risk for the changes are low
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
**Ecosystem Engineering and Operations Lead
**LTS Maintainer  - Steve Sakoman is retiring in April 2026 (full details pending)


'''Planned Releases for YP 2.8:'''<br/>
'''Ways to contribute:'''<br/>
*M1 Cutoff June 9th
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*M1 Release June 21st
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*M2 Cutoff 14th July
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*M2 Release 26th July
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*M3 Cutoff (Feature Freeze) 25th Aug
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*M3 Release 6th Sept
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*M4 Cutoff 30th Sept
*Help us resolve CVE issues: CVE metrics
*2.8 (M4) Final Release 25th Oct
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Tracking Metrics:'''<br/>
*WDD 2835 (last week 2845) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1111 (last week 1095)
**Patches in the Pending State: 156 (14%) [last week 155 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 2.6.3 (Thud) is in planning
*YP 5.3 M3 Build Date 2025-09-01
*YP 2.7.1 (Warrior) is in planning
*YP 5.3 M3 Release Date 2025-09-12
*YP 5.3 M4 Build Date 2025-10-06
*YP 5.3 M4 Release Date 2025-10-31


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 1478 (last week 2507) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.2.3 is being reviewed for release.
*Poky Patch Metrics 
*YP 5.0.12 is being reviewed for release.
**Total patches found: 1507 (last week 1513)
*YP 4.0.30 Build Date 2025-09-22
**Patches in the Pending State: 641 (43%) [last week 646 (43%)]
*YP 4.0.30 Release Date 2025-10-03
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features<br/>


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:48, 9 September 2025

Yocto Project Weekly Status Sept. 9th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.2.3 is due to be released.
  • YP 5.0.12 is due to be released.
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3
  • Updates to the 6.16 kernel are pending before the 5.3 M3 build
  • We aim to merge bitbake-setup before building 5.3 M3
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026 (full details pending)

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is being reviewed for release.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16