== Yocto Project Weekly Status May 21, 2019 ==
== Yocto Project Weekly Status Oct. 28th, 2025 ==
Current Dev Position: YP 2.8 M1<br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: YP 2.8 Milestone 1 Cutoff June 9th, 2019<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>
 
'''SWAT Team Rotation:'''<br/>
 
*SWAT lead is currently: Amanda
*SWAT team rotation: Ross -> Chen on May. 24, 2019
*SWAT team rotation: Chen -> Armin on May. 31, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday May 23rd at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting - Thursday Oct. 30th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday June 4th at 8am PDT (https://zoom.us/j/990892712)  
*Weekly Project Engineering Sync - Tuesday Oct. 28th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Oct. 30th 10am GMT and Monday Nov. 3rd 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Stephen is going to be unavailable for several weeks, please refer any queries to Richard
*YP 5.3 M3 is in QA
*The final 2.8 planning meeting was held. The google doc summarising the discussions so far: https://docs.google.com/document/d/1CNEKA4d0eT6-e0hnS2pwi7xdZ5_t6smpZO2HbaJGXbU/
*YP 5.0.13 is under review for release
*Mailing lists are moving to groups.io instead of our current mailman setup on 27th May. This shouldn’t impact users directly, more details will be sent to the mailing lists in due course.
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs
*We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter.  Known issues:
*Work is continuing to improve the ptest reliability with a focus now on ensuring the dependencies are correct.
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
**Help welcomed to resolve these issues!
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
*“poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.


'''Planned Releases for YP 2.8:'''<br/>
'''Ways to contribute:'''<br/>
*M1 Cutoff June 9th
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*M1 Release June 21st
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*M2 Cutoff 14th July
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*M2 Release 26th July
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*M3 Cutoff (Feature Freeze) 25th Aug
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*M3 Release 6th Sept
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*M4 Cutoff 30th Sept
*Help us resolve CVE issues: CVE metrics
*2.8 (M4) Final Release 25th Oct
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Tracking Metrics:'''<br/>
*WDD 3001 (last week 3009) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1091 (last week 1091)
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*YP 2.6.3 (Thud) is in planning
*YP 5.3 M3 is in QA.
*YP 2.7.1 (Warrior) is in planning
*YP 5.3 M4 Build Date 2025-11-10
*YP 5.3 M4 Release Date 2025-11-28


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2559 (last week 2596) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0.13 is in review for release.
*Poky Patch Metrics 
*YP 4.0.31 Build Date 2025-11-03
**Total patches found: 1531 (last week 1560)
*YP 4.0.31 Release Date 2025-11-14
**Patches in the Pending State: 655 (43%) [last week 665 (43%)]
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features<br/>


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:50, 28 October 2025

Yocto Project Weekly Status Oct. 28th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3 M3 is in QA
  • YP 5.0.13 is under review for release
  • Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
  • We have now past feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
    • check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
    • Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
    • The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
    • The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
    • Help welcomed to resolve these issues!
  • Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. We are evaluating the situation with 6.17, feedback on it (for/against and known issues) would be welcome.
  • “poky” as a combo-layer repository will soon no longer be needed or updated for master and whinlatter branches.
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 is in QA.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 5.0.13 is in review for release.
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.0.31 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC