== Yocto Project Weekly Status March, 12, 2019 ==
== Yocto Project Status 21 July 2026 ==
Current Dev Position: YP 2.7 M3 <br/>
Current Dev Position: YP 6.1 M2<br/>
Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019<br/>
Next Deadline: YP 6.1 M2: w/c 2026-07-20<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 23rd July 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync  - Tuesday 21st July 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 23rd July 10am GMT and Monday 27th July 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


*SWAT lead is currently: Anuj
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*SWAT team rotation: Anuj -> Armin on Mar. 15, 2019
*SWAT team rotation: Armin -> Paul on Mar. 23, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 2.7 M2 rc2 was released on May 5, 2019.
*YP 6.0.2 has been released
*We believe we now have all the key components for 2.7M3 in master-next but have not completed a successful test run with this. In addition to the list last week, this means M3 will include:
*YP 5.0.19 is due to release
**5.0 kernel
*YP 6.1 M2 will build this week after pseudo, systemd and resulttool changes merge
**qemuarm transition to armv7
*Some invasive LICENSE changes have merged into master:
**Busybox full replacement utils
**We now require the LICENSE field to match SPDX identifiers.  
*Some invalid source revisions tested in master-next have broken the autobuilder causing build hangs and failures. With travel and other distractions, nobody is available to dive in and debug this immediately so it will block M3.
**The build will issue warnings when this isn’t the case.
*We also want to complete the transition to the new QA process and test this for M3. Aproov is going to send out details of this imminently, we believe the main code work is complete and its process/documentation that remains. We will block on this as we want to use the new QA process for M3 and the final 2.7 release.
**Non SPDX licenses will need to be of the form LicenseRef-XXX
*YP 2.5.3 continues to be blocked on autobuilder-helper changes for the stable branches and the resulttool changes in master to move to the new QA process.
**CLOSED is no longer a valid value.  
**‘WITH’ license exceptions are now supported
Big thanks for Joshua for getting us to the point where we can finally clean this up!
*We have identified a few linux-yocto CVEs which need triaging due to missing version information in the CVE databases (affecting master, wrynose and scarthgap), see the email sent to the list: https://lists.yoctoproject.org/g/yocto/topic/120036383
*Patches generated by the automatic upgrade helper (AUH) now include changelogs where these can be extracted from upstream.
*A couple of further pseudo related issues were identified, one with linkat flags and one with openat2 (tar related/triggered). We hope to have patches merged soon.
*Systemd issues with older host kernels (e.g. RHEL 8) is still being worked on https://lists.openembedded.org/g/openembedded-architecture/topic/119870359
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge. The review calls are running out of time each meeting which limits progress.
**We’re making little progress on intermittent build failures despite the problems continuing to impact test builds:
**several qemu ‘hang’ type issues on ARM
**sometimes yocto-check-layer is showing checksum mismatch issues
**siggen reset issues (“ResourceWarning: unclosed transport”)
**groff build race issues
**intermittent ptest failures in many recipes
*For the qemuarmv5 amba crash (#16217), we did confirm it doesn’t seem to be load or memory usage related and does seem to happen on the autobuilder but not on other systems, for reasons still currently unknown.


'''Planned Releases for YP 2.7:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*We have several open issues for pseudo and limited maintainer time to work on them. Help from someone familiar with systems programming in C would be greatly appreciated. https://bugzilla.yoctoproject.org/buglist.cgi?list_id=661406&priority=High&priority=Medium%2B&product=Pseudo&query_format=advanced&resolution=---
*YP 2.7 M3 Release Target is Mar. 8, 2019
*There are a large number of intermittent failures on our autobuilder, any help with investigating, reproducing or solving these issues would be welcome! https://valkyrie.yocto.io/pub/non-release/abint/
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*Many recipes in openembedded-core would benefit from a new recipe maintainer. Please look at https://git.openembedded.org/openembedded-core/tree/meta/conf/distro/include/maintainers.inc and see if you can adopt any of the unassigned recipes.
*YP 2.7 M4 Release Target is Apr. 26, 2019
*For more ways to contribute, see https://docs.google.com/document/d/18oxKWxLorfF813h82mK6yKTIHeBp_-9owFuCWbzgjOk/edit?usp=sharing


'''Planned upcoming dot releases:'''<br/>
'''New to the project?'''<br/>
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*We have a list of issues we think are good places to start contributing: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=NEWCOMER
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2439 (last week 2436) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2719 (last week 2689) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1523 (last week 1502)
**Total patches found: 1019 (last week 1019+)
**Patches in the Pending State: 657 (43%) [last week 658 (44%)]
**Patches in the Pending State: 144 (14%) [last week 145 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


'''Key Status Links for YP:'''<br/>
'''Upcoming development releases:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
*6.1 M2:
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
**Build Date: w/c 2026-07-20
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>
**Release Date: w/c 2026-08-03
*6.1 M3:
**Build Date: w/c 2026-08-31
**Release Date: w/c 2026-09-14
*6.1.0:
**Build Date (M4): w/c 2026-10-12
**Release Date: w/c 2026-11-02
 
'''Upcoming dot releases:'''<br/>
*YP 5.0.19 due to release
**Release Date w/c 2026-07-13
*YP 6.0.3
**Build Date w/c 2026-08-10
**Release Date w/c 2026-08-24
*YP 5.0.20
**Build Date w/c 2026-08-17
**Release Date w/c 2026-08-31
 
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
 
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>


== Archives ==
== Archives ==
*[[2026 Yocto Project Weekly Status Archive]]
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:50, 21 July 2026

Yocto Project Status 21 July 2026

Current Dev Position: YP 6.1 M2
Next Deadline: YP 6.1 M2: w/c 2026-07-20

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 6.0.2 has been released
  • YP 5.0.19 is due to release
  • YP 6.1 M2 will build this week after pseudo, systemd and resulttool changes merge
  • Some invasive LICENSE changes have merged into master:
    • We now require the LICENSE field to match SPDX identifiers.
    • The build will issue warnings when this isn’t the case.
    • Non SPDX licenses will need to be of the form LicenseRef-XXX
    • CLOSED is no longer a valid value.
    • ‘WITH’ license exceptions are now supported

Big thanks for Joshua for getting us to the point where we can finally clean this up!

  • We have identified a few linux-yocto CVEs which need triaging due to missing version information in the CVE databases (affecting master, wrynose and scarthgap), see the email sent to the list: https://lists.yoctoproject.org/g/yocto/topic/120036383
  • Patches generated by the automatic upgrade helper (AUH) now include changelogs where these can be extracted from upstream.
  • A couple of further pseudo related issues were identified, one with linkat flags and one with openat2 (tar related/triggered). We hope to have patches merged soon.
  • Systemd issues with older host kernels (e.g. RHEL 8) is still being worked on https://lists.openembedded.org/g/openembedded-architecture/topic/119870359
  • We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge. The review calls are running out of time each meeting which limits progress.
    • We’re making little progress on intermittent build failures despite the problems continuing to impact test builds:
    • several qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • siggen reset issues (“ResourceWarning: unclosed transport”)
    • groff build race issues
    • intermittent ptest failures in many recipes
  • For the qemuarmv5 amba crash (#16217), we did confirm it doesn’t seem to be load or memory usage related and does seem to happen on the autobuilder but not on other systems, for reasons still currently unknown.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M2:
    • Build Date: w/c 2026-07-20
    • Release Date: w/c 2026-08-03
  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 5.0.19 due to release
    • Release Date w/c 2026-07-13
  • YP 6.0.3
    • Build Date w/c 2026-08-10
    • Release Date w/c 2026-08-24
  • YP 5.0.20
    • Build Date w/c 2026-08-17
    • Release Date w/c 2026-08-31