== Yocto Project Weekly Status February 5, 2019 ==
== Yocto Project Weekly Status Sept. 9th, 2025 ==
Current Dev Position: YP 2.7 M3 <br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Sept. 11th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Sept. 9th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Sept. 11th 10am GMT and Monday Sept. 15th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)


*SWAT lead is currently: Anuj
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*SWAT team rotation: Anuj -> Paul on Feb. 8, 2019
*SWAT team rotation: Paul -> Ross on Feb. 15, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 2.6.1 was released on Feb. 4, 2019.
*YP 5.2.3 is due to be released.
*YP 2.7 M2 was built and is in QA and is 79% done. See: https://wiki.yoctoproject.org/wiki/2.7_QA_Status
*YP 5.0.12 is due to be released.
*Some major recipe upgrades merged (glibc, binutils, llvm)
*YP 5.3 M3 is due to build soon
*Some “prework” patches for various series merged (util-linux, virtgl) but the main series are still pending development or review
*We’re at feature freeze for YP 5.3
*Various ptest-runner and ptest runtime testing integration fixes merged but many problems with the tests remain no volunteers to help resolve issues.
*Updates to the 6.16 kernel are pending before the 5.3 M3 build
*We’re seeing test failures which highlight major problems with the archiver class, in particular the src.rpm component of it. I’ve proposed we remove it, if you do care about it please step up and help fix it else it will be removed. *The src.rpm support is limited anyhow and likely to mislead user expectations so removing it may be a good thing.
*We aim to merge bitbake-setup before building 5.3 M3
*The recipe reporting system integration with the layer index is now complete and available at: https://layers.openembedded.org/rrs/recipes/OE-Core/2.7/M3/. Historical data has not yet been imported to it.
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
*The project autobuilder is running at slightly reduced capacity (but not functionality) due to hardware failures.
*Patch merging is continuing as long as the risk for the changes are low
*The project is considering moving its mailing list hosting to groups.io, if anyone has any experience of that, positive or negative please let Michael, Nico and Richard know
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
*We’re becoming seriously concerned about the lack of response to the last round of AUH patches
**Ecosystem Engineering and Operations Lead
**LTS Maintainer  - Steve Sakoman is retiring in April 2026 (full details pending)


'''Planned Releases for YP 2.7:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.7 M2 is built and in QA.
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 2.7 M2 Release Target is Feb. 1, 2019
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*YP 2.7 M3 Release Target is Mar. 8, 2019
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*YP 2.7 M4 Release Target is Apr. 26, 2019
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Planned upcoming dot releases:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*WDD 2835 (last week 2845) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*OE-Core/Poky Patch Metrics
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
**Total patches found: 1111 (last week 1095)
**Patches in the Pending State: 156 (14%) [last week 155 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Tracking Metrics:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*WDD 2356 (last week 2393) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.3 M3 Build Date 2025-09-01
*Poky Patch Metrics 
*YP 5.3 M3 Release Date 2025-09-12
**Total patches found: 1572 (last week 1583)
*YP 5.3 M4 Build Date 2025-10-06
**Patches in the Pending State: 678 (43%) [last week 677 (43%)]
*YP 5.3 M4 Release Date 2025-10-31
 
'''Upcoming dot releases:'''<br/>
*YP 5.2.3 is being reviewed for release.
*YP 5.0.12 is being reviewed for release.
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:48, 9 September 2025

Yocto Project Weekly Status Sept. 9th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.2.3 is due to be released.
  • YP 5.0.12 is due to be released.
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3
  • Updates to the 6.16 kernel are pending before the 5.3 M3 build
  • We aim to merge bitbake-setup before building 5.3 M3
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026 (full details pending)

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is being reviewed for release.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: