Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(628 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status January 29, 2019 ==
== Yocto Project Weekly Status Sept. 9th, 2025 ==
Current Dev Position: YP 2.7 M3 <br/>
Current Dev Position: YP 5.3 M3<br/>
Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019<br/>
Next Deadline: YP 5.3 M3 Build Date 2025-09-01<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Sept. 11th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Sept. 9th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Sept. 11th 10am GMT and Monday Sept. 15th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)


*SWAT lead is currently: Armin
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*SWAT team rotation: Armin -> Anuj on Feb. 1, 2019
*SWAT team rotation: Anuj -> Paul on Feb. 8, 2019
**https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 2.6.1 is out of QA and the QA results are being reviewed. See: https://wiki.yoctoproject.org/wiki/WW02_-_2019-01-09_-_Full_Test_Cycle_2.6.1_RC1
*YP 5.2.3 is due to be released.
*We have preliminary patches for the qemuarm migration to an armv7 machine. These haven’t passed testing and will need some improvements, particularly in the area of graphics support so will be deferred to M3 but it is great to see progress being made.
*YP 5.0.12 is due to be released.
*The qemu virtgl patchset is also making great progress in review/development but will also be deferred to M3.
*YP 5.3 M3 is due to build soon
*We are now running the build performance tests as part of our standard autobuilder which is a further step towards streamlining our testing and release process. We are having some problems with the graphs that are generated in the emails. If anyone has experience or interest in helping with this (google charts in emails) we’d love to hear from you!
*We’re at feature freeze for YP 5.3
*The perl changes which landed last week seem to have mostly been ok, there have been some race issues and we’re grateful to Alex and the perl-cross upstream for their fast turnaround on those.
*Updates to the 6.16 kernel are pending before the 5.3 M3 build
*Further fixes for the gitsm fetcher landed but there are still reports of issues. We continue to try and find ways to expand our test case matrix so we can fix the issues *and* ensure we don’t regress.
*We aim to merge bitbake-setup before building 5.3 M3
*The latest round of updates from the AUH were sent out. Some have responded to this and sent in upgrades, many have not. If you are listed as a maintainer, please help us keep recipes up to date!
*This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
*Patch merging is continuing as long as the risk for the changes are low
*There are a couple of open Yocto Project positions which we’re in the process of advertising:
**Ecosystem Engineering and Operations Lead
**LTS Maintainer  - Steve Sakoman is retiring in April 2026 (full details pending)


'''Planned Releases for YP 2.7:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.7 M2 is built and in QA.
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 2.7 M2 Release Target is Feb. 1, 2019
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*YP 2.7 M3 Release Target is Mar. 8, 2019
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*YP 2.7 M4 Release Target is Apr. 26, 2019
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Planned upcoming dot releases:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.6.1 (Thud) will release shortly.
*WDD 2835 (last week 2845) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*OE-Core/Poky Patch Metrics
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
**Total patches found: 1111 (last week 1095)
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
**Patches in the Pending State: 156 (14%) [last week 155 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Tracking Metrics:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*WDD 2393 (last week 2421) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.3 M3 Build Date 2025-09-01
*Poky Patch Metrics 
*YP 5.3 M3 Release Date 2025-09-12
**Total patches found: 1583 (last week 1572)
*YP 5.3 M4 Build Date 2025-10-06
**Patches in the Pending State: 677 (43%) [last week 677 (43%)]
*YP 5.3 M4 Release Date 2025-10-31
 
'''Upcoming dot releases:'''<br/>
*YP 5.2.3 is being reviewed for release.
*YP 5.0.12 is being reviewed for release.
*YP 4.0.30 Build Date 2025-09-22
*YP 4.0.30 Release Date 2025-10-03
*YP 5.2.4 Build Date 2025-09-29
*YP 5.2.4 Release Date 2025-10-10
*YP 5.0.13 Build Date 2025-10-13
*YP 5.0.13 Release Date 2025-10-24
*YP 4.0.31 Build Date 2025-11-03
*YP 4.031 Release Date 2025-11-14
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:48, 9 September 2025

Yocto Project Weekly Status Sept. 9th, 2025

Current Dev Position: YP 5.3 M3
Next Deadline: YP 5.3 M3 Build Date 2025-09-01

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.2.3 is due to be released.
  • YP 5.0.12 is due to be released.
  • YP 5.3 M3 is due to build soon
  • We’re at feature freeze for YP 5.3
  • Updates to the 6.16 kernel are pending before the 5.3 M3 build
  • We aim to merge bitbake-setup before building 5.3 M3
  • This change will mean “poky” as a combo-layer repository will no longer be needed or updated. This means autobuilder changes before we build 5.3 M3.
  • Patch merging is continuing as long as the risk for the changes are low
  • There are a couple of open Yocto Project positions which we’re in the process of advertising:
    • Ecosystem Engineering and Operations Lead
    • LTS Maintainer - Steve Sakoman is retiring in April 2026 (full details pending)

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 Build Date 2025-09-01
  • YP 5.3 M3 Release Date 2025-09-12
  • YP 5.3 M4 Build Date 2025-10-06
  • YP 5.3 M4 Release Date 2025-10-31

Upcoming dot releases:

  • YP 5.2.3 is being reviewed for release.
  • YP 5.0.12 is being reviewed for release.
  • YP 4.0.30 Build Date 2025-09-22
  • YP 4.0.30 Release Date 2025-10-03
  • YP 5.2.4 Build Date 2025-09-29
  • YP 5.2.4 Release Date 2025-10-10
  • YP 5.0.13 Build Date 2025-10-13
  • YP 5.0.13 Release Date 2025-10-24
  • YP 4.0.31 Build Date 2025-11-03
  • YP 4.031 Release Date 2025-11-14
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives