== Yocto Project Weekly Status January 15, 2019 ==
== Yocto Project Weekly Status Nov. 4th, 2025 ==
Current Dev Position: YP 2.7 M2 <br/>
Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release<br/>
Next Deadline: YP 2.7 M2 Cutoff is Jan. 21, 2019<br/>
Next Deadline: YP 5.3 M4 Build Date 2025-11-10<br/>


'''SWAT Team Rotation:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Nov. 6th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Nov. 4th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Nov. 6th 10am GMT and Monday Nov. 10th 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)


*SWAT lead is currently: Paul
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
*SWAT team rotation: Paul -> Chen on Jan. 18, 2019
*SWAT team rotation: Chen -> Armin on Jan. 25, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 2.7 M1 was released on Jan. 10, 2019
*YP 5.0.13 was released
*YP 2.6.1 is in QA and 79% complete. See: https://wiki.yoctoproject.org/wiki/2.6_QA_Status
*YP 5.3 M3 is due to be released
*We merged the perl changes and version upgrade. This exposed some race issues but we’re hoping those have now been resolved. Thanks AlexK! This may cause fallout for perl module recipes in other layers.  
*YP 4.0.31 is in QA
*There is a proposed patchset to add GL passthrough support for qemu, feedback on the proposals is welcome. There are build time performance implications, particularly due to the use of gtk3+-native.
*Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
*There is a -dev kernel recipe for the Linux 5.0 kernel, thanks Bruce.
*We plan to merge the documentation changes then stop updating the poky repository master branch.
*M2 cutoff is next week!
*We are now past the feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
**check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
**Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
**The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
**The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
**Help welcomed to resolve these issues!
*Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. The 6.17 kernel has run into issues we don’t have availability/time to resolve unfortunately so we will have to release with 6.16.
*YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
*There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.


'''Planned Releases for YP 2.7:'''<br/>
'''Ways to contribute:'''<br/>
*YP 2.7 M2 Cutoff is Jan. 21, 2019
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 2.7 M2 Release Target is Feb. 1, 2019
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*YP 2.7 M3 Cutoff is Feb. 25, 2019
*There are bugs identified as possible for newcomers to the project: https://dashboard.yoctoproject.org/bugtriage/#newcomer-container
*YP 2.7 M3 Release Target is Mar. 8, 2019
*There are bugs that are currently unassigned for YP 5.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.3_Unassigned_Enhancements/Bugs
*YP 2.7 M4 Cutoff is Apr. 1, 2019
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*YP 2.7 M4 Release Target is Apr. 26, 2019
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*Ongoing project development plans are being developed in this document: https://docs.google.com/document/d/1xsnN_HcaMhqg6Dn1P_19AnumDaUMQSdFZ_I4rjD830A/edit?usp=sharing We need to continue to develop this as it will allow us to potentially find ways to fund specific work items.


'''Planned upcoming dot releases:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.6.1 (Thud) will is in QA.
*WDD 3103 (last week 3001) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*OE-Core/Poky Patch Metrics
*YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
**Total patches found: 1098 (last week 1091)
*YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
**Patches in the Pending State: 153 (14%) [last week 153 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Tracking Metrics:'''<br/>
'''YP 5.3 Milestone Dates:'''<br/>
*WDD 2391 (last week 2364) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.3 M3 is in review for release.
*Poky Patch Metrics 
*YP 5.3 M4 Build Date 2025-11-10
**Total patches found: 1565 (last week 1618)
*YP 5.3 M4 Release Date 2025-11-28
**Patches in the Pending State: 667 (43%) [last week 718 (44%)]
 
'''Upcoming dot releases:'''<br/>
*YP 5.0.13 was released.
*YP 4.0.31 is in QA.
*YP 5.0.14 Build Date 2025-11-17
*YP 5.0.14 Release Date 2025-11-28
*YP 4.0.32 Build Date 2025-12-15
*YP 4.0.32 Release Date 2025-12-24
*YP 5.0.15 Build Date 2026-01-05
*YP 5.0.15 Release Date 2026-01-16


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2025 Yocto Project Weekly Status Archive]]
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 15:52, 4 November 2025

Yocto Project Weekly Status Nov. 4th, 2025

Current Dev Position: YP 5.3 M4 - Stabilization and Final Build/Release
Next Deadline: YP 5.3 M4 Build Date 2025-11-10

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.0.13 was released
  • YP 5.3 M3 is due to be released
  • YP 4.0.31 is in QA
  • Documentation updates related to many of the recent changes are in progress, thanks to all who have helped on these.
  • We plan to merge the documentation changes then stop updating the poky repository master branch.
  • We are now past the feature freeze for YP 5.3. To be accepted, patches that have a high bar until after we branch master from whinlatter. Known issues:
    • check-layer tests are now running under nodistro instead of poky, so some layers are failing as they assume some DISTRO_FEATURES are enabled.
    • Toaster is broken with bitbake-setup (#16012). Help moving to supporting non-poky layouts would be good if anyone is using Toaster.
    • The patch/cve metrics jobs need reviewing to be sure they’re correct with bitbake-setup (#16013)
    • The build performance jobs don’t know that poky and oe-core are the same so the charts are currently wrong (#16014)
    • Help welcomed to resolve these issues!
  • Upstream linux kernel just end-of-life’d 6.16 but whinlatter contains 6.16. The 6.17 kernel has run into issues we don’t have availability/time to resolve unfortunately so we will have to release with 6.16.
  • YP 6.0 (wrynose) and the next LTS releases proposed timeline: https://docs.google.com/document/d/1BlvtPxpYsxHkeL10DFBQzBI9q_1HIk9r2FPxlfsQ95U/edit?tab=t.0
  • There are likely going to be breaking changes to the npm fetcher related to ongoing security concerns.

Ways to contribute:

Tracking Metrics:

YP 5.3 Milestone Dates:

  • YP 5.3 M3 is in review for release.
  • YP 5.3 M4 Build Date 2025-11-10
  • YP 5.3 M4 Release Date 2025-11-28

Upcoming dot releases:

  • YP 5.0.13 was released.
  • YP 4.0.31 is in QA.
  • YP 5.0.14 Build Date 2025-11-17
  • YP 5.0.14 Release Date 2025-11-28
  • YP 4.0.32 Build Date 2025-12-15
  • YP 4.0.32 Release Date 2025-12-24
  • YP 5.0.15 Build Date 2026-01-05
  • YP 5.0.15 Release Date 2026-01-16

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at: