Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
 
(4 intermediate revisions by one other user not shown)
Line 1: Line 1:
== Yocto Project Status 4 August 2026 ==
== Yocto Project Status 8 September 2026 ==
Current Dev Position: YP 6.1 M3<br/>
Current Dev Position: YP 6.1 M3<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 6th Aug. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 10th Sept. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync  - Tuesday 4th Aug. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync  - Tuesday 8st Sept. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 6th Aug. 10am GMT and Monday 10th Aug. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 10th Sept. 10am GMT and Monday 14th Sept. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 6.1 M2 is due for release
* YP 5.0.20 is under review.
*There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
* YP 6.1 M3 is due to build and we are at feature freeze
**Matchbox-wm segfault/xserver restart
* There are issues with changes in bot/AI protection at github.com which are affecting our CI.
**aarch64/x86-64 build host contamination/reproducibility issue
* Most M3 changes have merged, we want to mitigate the github issues before building M3.
    We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.
* There is a new meta-openjdk layer: https://github.com/amarula/meta-openjdk https://lore.kernel.org/yocto-patches/xBB4.1788187111192557019.ULaN@lists.yoctoproject.org/T/#u
*Remaining intermittent build failures of concern:
* AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
* There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
** Matchbox-wm segfault/xserver restart
** aarch64/x86-64 build host contamination/reproducibility issue
We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.
*Remaining intermittent build failures of concern:
**other qemu ‘hang’ type issues on ARM
**other qemu ‘hang’ type issues on ARM
**sometimes yocto-check-layer is showing checksum mismatch issues
**sometimes yocto-check-layer is showing checksum mismatch issues
**siggen reset issues (“ResourceWarning: unclosed transport”)
**intermittent ptest failures in many recipes
**intermittent ptest failures in many recipes
*Some class cleanups were merged which did require tweaks to some metadata:
*Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!
**https://lore.kernel.org/openembedded-core/20260802102854.3952760-1-richard.purdie@linuxfoundation.org/
**See the “The series does break some things, notably” section
*Some invasive LICENSE changes have merged into master:
**We now require the LICENSE field to match SPDX identifiers.
**The build will issue warnings when this isn’t the case.
**Non SPDX licenses will need to be of the form LicenseRef-XXX
**CLOSED is no longer a valid value.
**‘WITH’ license exceptions are now supported
Big thanks to Joshua for getting us to the point where we can finally clean this up!
*We continue to work on the backlog of patches which has slightly reduced and we’re trying to catch up with AUH updates.
*Toolchain upgrades merged to glibc and bintuils with many other recipe version updates too.
*Rust is now using a shared work directory which reduces disk usage significantly.
*There have been further important fixes in pseudo which were included in the latest upgrade.
*The new uninative does not have i686 build host support. This will mean i686 build host support with uninative will no longer be possible out the box when that is merged to the LTS branches. It is unlikely anyone should be using that!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 47: Line 37:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2694 (last week 2689) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2622 (last week 2612) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1029 (last week 1021)
**Total patches found: 1050 (last week 1039)
**Patches in the Pending State: 141 (14%) [last week 141 (14%)]
**Patches in the Pending State: 136 (13%) [last week 139 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


'''Upcoming development releases:'''<br/>
'''Upcoming development releases:'''<br/>
*6.1 M2: due for release
**Release Date: w/c 2026-08-03
*6.1 M3:
*6.1 M3:
**Build Date: w/c 2026-08-31
**Build Date: w/c 2026-08-31
Line 64: Line 52:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 6.0.3 due to release
*YP 6.0.3 is in review.
**Release Date w/c 2026-08-24
**Release Date w/c 2026-08-24
*YP 5.0.20
*YP 5.0.20 is in QA.
**Build Date w/c 2026-08-17
**Release Date w/c 2026-08-31
**Release Date w/c 2026-08-31
*YP 6.0.4
**Build Date w/c 2026-09-28
**Release Date w/c 2026-10-12
*YP 5.0.21
**Build Date w/c 2026-10-05
**Release Date w/c 2026-10-19


*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar

Latest revision as of 14:41, 8 September 2026

Yocto Project Status 8 September 2026

Current Dev Position: YP 6.1 M3
Next Deadline: YP 6.1 M3: w/c 2026-08-31

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.

  • Remaining intermittent build failures of concern:
    • other qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • intermittent ptest failures in many recipes
  • Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 6.0.3 is in review.
    • Release Date w/c 2026-08-24
  • YP 5.0.20 is in QA.
    • Release Date w/c 2026-08-31
  • YP 6.0.4
    • Build Date w/c 2026-09-28
    • Release Date w/c 2026-10-12
  • YP 5.0.21
    • Build Date w/c 2026-10-05
    • Release Date w/c 2026-10-19

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives