Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
No edit summary
 
(10 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Status 23 June 2026 ==
== Yocto Project Status 8 September 2026 ==
Current Dev Position: YP 6.1 M2<br/>
Current Dev Position: YP 6.1 M3<br/>
Next Deadline: YP 6.1 M1: w/c 2026-07-20<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 25th June 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 10th Sept. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync  - Tuesday 23rd June. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync  - Tuesday 8st Sept. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 25th June 10am GMT and Monday 29th June 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 10th Sept. 10am GMT and Monday 14th Sept. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 6.0.1 was released
* YP 5.0.20 is under review.
*YP 6.1 M1 is in review
* YP 6.1 M3 is due to build and we are at feature freeze
*AUH is now running daily in incremental mode. We’re still tweaking some of the behaviours and reporting but if anyone has feedback/concerns, let us know. Help is needed with resolving automatic update failures and getting the patches into a state where they can be accepted.
* There are issues with changes in bot/AI protection at github.com which are affecting our CI.  
*CVE metrics are up on scarthgap & wrynose branches due to delays with kernel upgrades. We’ve had intermittent LTP failures, kconfig type changes, lttng build failures and new warnings in dmesg which we needed to handle. We’re working through this, help is needed to accelerate testing of future stable kernel upgrades.
* Most M3 changes have merged, we want to mitigate the github issues before building M3.
*Systemd v260 will require Linux 5.10 or later. We run some systemd utils on the host during the build, so this presents issues with RHEL 8 era distros which have older kernel versions. If you use one of these distros, assistance may be needed to keep them supported. See https://lists.openembedded.org/g/openembedded-architecture/topic/119870359
* There is a new meta-openjdk layer: https://github.com/amarula/meta-openjdk https://lore.kernel.org/yocto-patches/xBB4.1788187111192557019.ULaN@lists.yoctoproject.org/T/#u
*We continue to see high load on our infrastructure due to bots and AI scraping. This has primarily caused timeouts and errors accessing git.openembedded.org & git.yoctoproject.org. We have mitigations in place for now. Traditional git:// protocol continues to be disabled.
* AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge.
* There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
*Intermittent build failures continue to be problematic:
** Matchbox-wm segfault/xserver restart
**several qemu ‘hang’ type issues
** aarch64/x86-64 build host contamination/reproducibility issue
We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.
*Remaining intermittent build failures of concern:
**other qemu ‘hang’ type issues on ARM
**sometimes yocto-check-layer is showing checksum mismatch issues
**sometimes yocto-check-layer is showing checksum mismatch issues
**siggen reset issues (“ResourceWarning: unclosed transport”)
**groff build race issues
**intermittent ptest failures in many recipes
**intermittent ptest failures in many recipes
*We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. We have a roadmap document in Google Docs: https://docs.google.com/document/d/12xgAzSjDj5zVlo4eQIbiv1s3QMjtBTCvBFY3_T7OPto
*Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 36: Line 37:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2620 (last week 2590) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2622 (last week 2612) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1054(last week 1061)
**Total patches found: 1050 (last week 1039)
**Patches in the Pending State: 145 (14%) [last week 146 (14%)]
**Patches in the Pending State: 136 (13%) [last week 139 (14%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


'''Upcoming development releases:'''<br/>
'''Upcoming development releases:'''<br/>
*6.1 M1:
**Build Date: w/c 2026-06-08
**Release Date: w/c 2026-06-22
*6.1 M2:
**Build Date: w/c 2026-07-20
**Release Date: w/c 2026-08-03
*6.1 M3:
*6.1 M3:
**Build Date: w/c 2026-08-31
**Build Date: w/c 2026-08-31
Line 57: Line 52:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 6.0.1 is due to release
*YP 6.0.3 is in review.
*YP 6.0.2
**Release Date w/c 2026-08-24
**Build Date w/c 2026-06-23
*YP 5.0.20 is in QA.
**Release Date w/c 2026-07-06
**Release Date w/c 2026-08-31
*YP 5.0.19
*YP 6.0.4
**Build Date w/c 2026-06-30
**Build Date w/c 2026-09-28
**Release Date w/c 2026-07-13
**Release Date w/c 2026-10-12
*YP 5.0.21
**Build Date w/c 2026-10-05
**Release Date w/c 2026-10-19
 
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar



Latest revision as of 14:41, 8 September 2026

Yocto Project Status 8 September 2026

Current Dev Position: YP 6.1 M3
Next Deadline: YP 6.1 M3: w/c 2026-08-31

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.

  • Remaining intermittent build failures of concern:
    • other qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • intermittent ptest failures in many recipes
  • Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 6.0.3 is in review.
    • Release Date w/c 2026-08-24
  • YP 5.0.20 is in QA.
    • Release Date w/c 2026-08-31
  • YP 6.0.4
    • Build Date w/c 2026-09-28
    • Release Date w/c 2026-10-12
  • YP 5.0.21
    • Build Date w/c 2026-10-05
    • Release Date w/c 2026-10-19

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives