Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
 
(40 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status Jan. 13th, 2026 ==
== Yocto Project Status 8 September 2026 ==
Current Dev Position: YP 6.0 M1<br/>
Current Dev Position: YP 6.1 M3<br/>
Next Deadline: YP 6.0 M1 Build Date 2026-01-05<br/>
Next Deadline: YP 6.1 M3: w/c 2026-08-31<br/>
6
 
'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 15th Jan. 7:30am (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 10th Sept. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 13th Jan. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 8st Sept. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 15th Jan. 10am GMT and Monday 19th Jan. 9am PDT (https://zoom.us/j/97762397148?pwd=1xkiC9hp9SjEonaTaONwTb6iWry4Eb.1)  
*Yocto Project Patch Review - Thursday 10th Sept. 10am GMT and Monday 14th Sept. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.15 is in QA
* YP 5.0.20 is under review.
*YP 6.0 M1 will build when the 5 open high bugs are resolved.
* YP 6.1 M3 is due to build and we are at feature freeze
*We have a number of issues with build performance tests, test results and hanging glibc NFS tests on the autobuilder which need to be resolved before we can build a new release.
* There are issues with changes in bot/AI protection at github.com which are affecting our CI.  
*Due to the number of problems currently present, patch merging will have to slow to avoid adding any further issues.
* Most M3 changes have merged, we want to mitigate the github issues before building M3.
*Yoann Congal is starting to ramp up as the new LTS maintainer to take over from Steve Sakoman
* There is a new meta-openjdk layer: https://github.com/amarula/meta-openjdk https://lore.kernel.org/yocto-patches/xBB4.1788187111192557019.ULaN@lists.yoctoproject.org/T/#u
*The linux kernel is now defaulting to 6.18 and the other versions will soon be removed.
* AI scrapers and bots continue to impact the infrastructure, taking huge amounts of time for our sysadmins and with a significant cost impact to the project.
*We have isolated the Fedora43 workers until we can root cause the binary problems it was causing when the sstate was shared to older systems
* There are two AB-INT issues which are in a position where others could now help, as detailed in https://lists.openembedded.org/g/openembedded-core/message/242105:
*The project is exploring the idea of applying for funding for security related work. If anyone (individual or consultancies) has ideas, please talk to Paul/Richard/TSC. This is an opportunity to work on those issues you never have time/funding for!
** Matchbox-wm segfault/xserver restart
*We will be entirely disabling the npm fetcher in bitbake due to the security issues until those are resolved (https://bugzilla.yoctoproject.org/show_bug.cgi?id=16105)..
** aarch64/x86-64 build host contamination/reproducibility issue
We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.
*Remaining intermittent build failures of concern:
**other qemu ‘hang’ type issues on ARM
**sometimes yocto-check-layer is showing checksum mismatch issues
**intermittent ptest failures in many recipes
*Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 31: Line 37:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 3026 (last week 3011) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2622 (last week 2612) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1089 (last week 1092)
**Total patches found: 1050 (last week 1039)
**Patches in the Pending State: 151 (14%) [last week 151 (14%)]
**Patches in the Pending State: 136 (13%) [last week 139 (14%)]
*https://autobuilder.yocto.io/-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/


'''YP 6.0 Milestone Dates:'''<br/>
'''Upcoming development releases:'''<br/>
*YP 6.0 M1 Build Date 2026-01-05
*6.1 M3:
*YP 6.0 M1 Release Date 2026-01-16
**Build Date: w/c 2026-08-31
*YP 6.0 M2 Build Date 2026-02-02
**Release Date: w/c 2026-09-14
*YP 6.0 M2 Release Date 2026-02-13
*6.1.0:
*YP 6.0 M3 Build Date 2026-03-02
**Build Date (M4): w/c 2026-10-12
*YP 6.0 M3 Release Date 2026-03-13
**Release Date: w/c 2026-11-02
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26


'''Upcoming dot releases:'''<br/>
*YP 6.0.3 is in review.
**Release Date w/c 2026-08-24
*YP 5.0.20 is in QA.
**Release Date w/c 2026-08-31
*YP 6.0.4
**Build Date w/c 2026-09-28
**Release Date w/c 2026-10-12
*YP 5.0.21
**Build Date w/c 2026-10-05
**Release Date w/c 2026-10-19


'''Upcoming dot releases:'''<br/>
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*YP 5.0.15 in QA.
*YP 5.3.1 Build Date 2026-01-12
*YP 5.3.1 Release Date 2026-01-23
*YP 4.0.33 Build Date 2026-01-26
*YP 4.0.33 Release Date 2026-01-30
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.16 Release Date 2026-02-20
*YP 5.3.2 Build Date 2026-02-16
*YP 5.3.2 Release Date 2026-02-27
*YP 4.0.34 Build Date 2026-02-23
*YP 4.0.34 Release Date 2026-03-06
*YP 5.3.3 Build Date 2026-03-09
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:41, 8 September 2026

Yocto Project Status 8 September 2026

Current Dev Position: YP 6.1 M3
Next Deadline: YP 6.1 M3: w/c 2026-08-31

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

We get a lot of comments about these being hard to reproduce or work on, in both cases, these have specific well defined things which need to be done and a basic understanding of what the issue relates to, if not the actual fix.

  • Remaining intermittent build failures of concern:
    • other qemu ‘hang’ type issues on ARM
    • sometimes yocto-check-layer is showing checksum mismatch issues
    • intermittent ptest failures in many recipes
  • Progress was made on some of the risc-v speed differences in qemu which should help some of the autobuilder intermittent failures, thanks Trevor!

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming development releases:

  • 6.1 M3:
    • Build Date: w/c 2026-08-31
    • Release Date: w/c 2026-09-14
  • 6.1.0:
    • Build Date (M4): w/c 2026-10-12
    • Release Date: w/c 2026-11-02

Upcoming dot releases:

  • YP 6.0.3 is in review.
    • Release Date w/c 2026-08-24
  • YP 5.0.20 is in QA.
    • Release Date w/c 2026-08-31
  • YP 6.0.4
    • Build Date w/c 2026-09-28
    • Release Date w/c 2026-10-12
  • YP 5.0.21
    • Build Date w/c 2026-10-05
    • Release Date w/c 2026-10-19

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives