Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Status 14 April 2026 ==
== Yocto Project Status 12 May 2026 ==
Current Dev Position: YP 6.0 M4<br/>
Current Dev Position: YP 6.1 M1<br/>
Next Deadline: YP 6.0 M4 Build Date 2026-04-20<br/>
Next Deadline: YP 6.1 M1: w/c 2026-06-08<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday Apr. 16th 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 14th May 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday Apr. 14th 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 12th May 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday Apr. 16th 10am GMT and Monday Apr. 20th 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 14th May 10am GMT and Monday 18th May 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0.17 is due to be released
*YP 5.3.4 is due to release (has been approved)
*YP 6.0 M3 is in QA
*YP 6.0 is due to release (has been approved)
*YP 4.0.35 is queued for QA
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
*We have converted over to sbom-cve-check and dropped cve-check. This has caused a significant increase in CVEs reported, these are being triaged.
*Intermittent build failures continue to be problematic
*Issues with pending work needed:
*We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
**32bit x86 kvm seemingly broken with certain CPU features (#16074)
*Master is open for new development
**Reports of pseudo errors on Fedora 44 beta related to openat2()
*We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.
**Intermittent qemu boot failures of qemuarmv5 (and possibly qemuarm) since the last kernel upgrade
**Meta-oe cve layer filtering under new tooling (metrics script tweak?)
**Reprodicubility issues with strace/apr-util after gnulib macro changes (patches in testing)
*There was disruption to git services last week due to scraping attacks against the servers. This resulted in connection issues whilst those were mitigated, particularly the git protocol access.
git:// protocol access to git.yoctoproject.org and git.openembeded.org is deprecated and going forward https:// URLs should be used to access git repositories. We are aiming to discontinue git protocol use.
*The recent wic changes will need wic support files to be placed in files/wic within layers going forwards.
*We’re working through the backlog of patches and intermittent build failures are still problematic, including the emergence of new issues (newer kernel version?). We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
*The final kirkstone build has taken place and we’re no longer planning to merge patches on this branch.
*If you have any final patches for whinlatter, please get these sent to the list ASAP.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 38: Line 29:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2777 (last week 2797) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2688 (last week 2698) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1072 (last week 1060)
**Total patches found: 1087 (last week 1087)
**Patches in the Pending State: 147 (14%) [last week 148 (14%)]
**Patches in the Pending State: 146 (13%) [last week 146 (13%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M3 in QA.
*YP 6.0 M4 Build Date 2026-04-13
*YP 6.0 M4 Release Date 2026-05-04


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 5.0.17 is in review.
*YP 5.3.4 is due to release
*YP 4.0.35 is in QA.
*YP 5.0.18
*YP 5.3.4
**Build Date  2026-05-11
**Build Date  2026-04-20
**Release Date 2026-05-25
**Release Date 2026-05-06
*YP 6.0.1
**Build Date  2026-05-18
**Release Date 2026-06-01
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar



Latest revision as of 14:45, 12 May 2026

Yocto Project Status 12 May 2026

Current Dev Position: YP 6.1 M1
Next Deadline: YP 6.1 M1: w/c 2026-06-08

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 5.3.4 is due to release (has been approved)
  • YP 6.0 is due to release (has been approved)
  • We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
  • Intermittent build failures continue to be problematic
  • We have pruned the release artefacts, please let us know if any you would like to use are missing. We’re also interested to know which ones people actually use outside of uninative/buildtools and the BSP test images.
  • Master is open for new development
  • We would like to know what people are planning to work on for Yocto Project 6.1 and beyond. Please send proposals to the mailing list or raise them during the weekly status call, Paul will be collecting these into a project roadmap.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming dot releases:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives