Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
(14 intermediate revisions by 3 users not shown)
Line 1: Line 1:
== Yocto Project Status 10 February 2026 ==
== Yocto Project Status 5 May 2026 ==
Current Dev Position: YP 6.0 M2<br/>
Current Dev Position: YP 6.1 M1<br/>
Next Deadline: YP 6.0 M2 Build Date 2026-02-16<br/>
Next Deadline: YP 6.1 M1: w/c 2026-06-22<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting - Thursday 12th Feb. 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting - Thursday 7th May 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Project Engineering Sync - Tuesday 10rd Feb. 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Project Engineering Sync - Tuesday 5th May 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Yocto Project Patch Review - Thursday 12th Feb. 10am GMT and Monday 16th Feb. 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)
*Yocto Project Patch Review - Thursday 7th May 10am GMT and Monday 11th May 9am PDT (https://zoom.us/j/97762397148?pwd=1xk0iC9hp9SjEonaTaONwTb6iWry4Eb.1)


'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>
'''Project data dashboard: https://dashboard.yoctoproject.org/'''<br/>


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.3.1 was released
*YP 4.0.35 was released
*YP 6.0 M1 was released
*YP 5.3.4 is due to release, pending TSC approval
*YP 4.0.33 is in QA
*YP 6.0 is due to release, pending TSC approval
*YP 6.0 M2 is due to build next week.
*We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
*There are currently 5 high open bugs, which will block M2. Three have line of sight to being resolved:
*Intermittent build failures continue to be problematic
**Issues reusing binaries from fedora 42/43 on older systems (#16087)
*Patch review/merging is slow due to public holidays clashing with a review call
**rust do_test_compile/do_install segfault (#16058)
*Master is open for new development.
**Generation of releases.json needs updating (#16138)
*Two are currently needing further work:
**x86 kvm broken on Fedora 43 (#16074)
**AB-INT: opkg-build segmentation fault (#16078)
*We are about to drop the 6.12 and 6.16 kernel recipes leaving just 6.18 for the next release
*The number of intermittent failures affecting builds, both stable and development, continues to be problematic - we continue to prioritise addressing these since any given build is now statistically likely to hit one or more of them.
*Patch review is now using two branches:
**“master-review”  - patches which pass on the autobuilder and will be discussed on the patch review call (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-review)
**“master-backlog” - patches which have been discussed and need further investigation or more detailed feedback which we haven’t had time for yet (https://git.openembedded.org/openembedded-core-contrib/log/?h=master-backlog)
*Patches are merging but there is a backlog and we’ve had to prioritize simpler changes. We continue to struggle for bandwidth for changes needing in depth review/feedback. This could impact features making it into the LTS.
 


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 40: Line 29:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2973 (last week 2945) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2698 (last week 2788) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1106 (last week 1100)
**Total patches found: 1087 (last week 1085)
**Patches in the Pending State: 152 (14%) [last week 152 (14%)]
**Patches in the Pending State: 146 (13%) [last week 146 (13%)]
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
**https://valkyrie.yocto.io/pub/non-release/patchmetrics/
'''YP 6.0 Milestone Dates:'''<br/>
*YP 6.0 M2 Build Date 2026-02-16
*YP 6.0 M2 Release Date 2026-02-27
*YP 6.0 M3 Build Date 2026-03-09
*YP 6.0 M3 Release Date 2026-03-20
*YP 6.0 M4 Build Date 2026-03-30
*YP 6.0 M4 Release Date 2026-04-26


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 4.0.33 is in QA.
*YP 5.3.4 is due to release, pending TSC approval
*YP 5.0.16 Build Date 2026-02-09
*YP 5.0.18
*YP 5.0.16 Release Date 2026-02-20
**Build Date 2026-05-11
*YP 5.3.2 Build Date 2026-02-16
**Release Date 2026-05-25
*YP 5.3.2 Release Date 2026-02-27
*YP 6.0.1
*YP 4.0.34 Build Date 2026-02-23
**Build Date 2026-05-18
*YP 4.0.34 Release Date 2026-03-06
**Release Date 2026-06-01
*YP 5.3.3 Build Date 2026-03-09
*For future release dates, see https://wiki.yoctoproject.org/wiki/Release_calendar
*YP 5.3.3 Release Date 2026-03-20
*YP 5.0.17 Build Date 2026-03-16
*YP 5.0.17 Release Date 2026-03-23
*YP 4.0.35 Build Date 2026-04-06
*YP 4.0.35 Release Date 2026-04-17
*YP 5.3.4 Build Date 2026-04-13
*YP 5.3.4 Release Date 2026-04-24
*YP 5.0.18 Build Date 2026-04-20
*YP 5.0.18 Release Date 2026-05-01
*YP 5.0.19 Build Date 2026-05-26
*YP 5.0.19 Release Date 2026-06-05


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 14:45, 5 May 2026

Yocto Project Status 5 May 2026

Current Dev Position: YP 6.1 M1
Next Deadline: YP 6.1 M1: w/c 2026-06-22

Next Team Meetings:

Project data dashboard: https://dashboard.yoctoproject.org/

Key Status/Updates:

  • YP 4.0.35 was released
  • YP 5.3.4 is due to release, pending TSC approval
  • YP 6.0 is due to release, pending TSC approval
  • We’re working through the backlog of patches, the bandwidth for changes needing in depth review/feedback continues to be a challenge
  • Intermittent build failures continue to be problematic
  • Patch review/merging is slow due to public holidays clashing with a review call
  • Master is open for new development.

Ways to contribute:

New to the project?

Tracking Metrics:

Upcoming dot releases:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives