Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
 
(504 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status November 26, 2019 ==
== Yocto Project Weekly Status Sept. 17th, 2024 ==
Current Dev Position: YP 3.1 M1 <br/>
Current Dev Position: YP 5.1 Feature Freeze and Bug Fixing<br/>
Next Deadline: YP 3.1 M1 build Dec. 2, 2019<br/>
Next Deadline: YP 5.1 M4 Build 30 Sept. 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Dec. 5th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday Sept. 19th at 7:30 am PST (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Dec. 3rd at 8am  PDT (https://zoom.us/j/990892712)
*Weekly Project Engineering Sync Tuesday Sept. 17th at 8 am PST (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Dec. 10th at 8am PDT (https://zoom.us/j/990892712)
*Twitch - See https://www.twitch.tv/theyoctojester
*Twitch - Next event is Tuesday Dec. 10th at 8am PDT (https://www.twitch.tv/yocto_project)


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 3.0.1 is out of QA with good test results so should be released soon.
*YP 5.1 M3 has been released
*We have set a deadline of Monday 9th December for removing python2 support from OE-Core, a separate email was sent out about this. The patches to do this are in master-next and they remove python and python2 from HOSTTOOLS.
*YP 4.0.21 has been released
*Reproducible builds are now enabled by default in poky, we should also consider this for the default in OE-Core.
*YP 5.1 rc1 (final release) is being built
*Hash equivalence continues to undergo testing and further work.
*There are YP 5.2 proposed milestone dates https://docs.google.com/document/d/1TDrD9nFjosvLHa7EfL_Y1-1slK7u5Am6NZV6QRF2P6s/edit - please review and let us know if there are any concerns.
*We’re likely to build M1 after the python 2 removal is merged next week, also giving time for the hash equivalence work to move forward further.
*The final pieces of the release were merged:
*Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them.
**sanity test for Ubuntu 24.04 userns/apparmor issue added
*The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the coming weeks.
**TCLIBCAPPEND properly deprecated
*We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=sharing
**toaster fixtures tweaked
*If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard and Stephen.
**buildtools updated
**non-deterministic libsdl2 configure issue fixed
**gitsm configparser change reverted
**many other varied and useful fixes
*Since there is now an rc build heading to QA, master and styhead will diverge. There are some patches in master-next which were deemed too late/risky for the release (including the gomod class changes)
*The new autobuilder has had NAS problems when scaled to final size, those are being worked on but it will delay switching to the new system a little.
*There is discussion around configuration file markup/syntax related to fragment management on the architecture list, targeting 5.2.


'''Proposed YP 3.1 Milestone Dates'''<br/>
'''Ways to contribute:'''<br/>
*YP 3.1 M1 build date 12/2/2019
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*YP 3.1 M1 release date 12/13/2019
*There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
*YP 3.1 M2 build date 1/20/2020
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*YP 3.1 M2 release date 1/31/2020
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*YP 3.1 M3 build date 2/24/2020
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*YP 3.1 M3 release date 3/6/2020
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*YP 3.1 M4 build date  3/30/2020
*Help us resolve CVE issues: CVE metrics
*YP 3.1 M4 release date  4/24/2020
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''Planned upcoming dot releases:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 3.0.1 is out of QA and should be released soon.
*WDD 2739 (last week 2734) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.7.3 build date  2/10/20
*OE-Core/Poky Patch Metrics
*YP 2.7.3 release date 2/21/20
**Total patches found: 1067 (last week 1067)
*YP 3.0.2 build date  2/3/20
**Patches in the Pending State: 176 (16%) [last week 176 (16%)]
*YP 3.0.2 release date 2/14/20
*https://autobuilder.yocto.io/-release/patchmetrics/


'''Tracking Metrics:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*WDD 2620 (last week 2578) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.1 M3 is released.
*Poky Patch Metrics 
*YP 5.1 M4 Build date 2024-09-30
**Total patches found: 1444 (last week 1450)
*YP 5.1 M4 Release date 2024-10-25
**Patches in the Pending State: 571 (40%) [last week 579 (40%)]
 
'''Upcoming dot releases:'''<br/>
*YP 4.0.21 is released.
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 47: Line 62:


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:49, 17 September 2024

Yocto Project Weekly Status Sept. 17th, 2024

Current Dev Position: YP 5.1 Feature Freeze and Bug Fixing
Next Deadline: YP 5.1 M4 Build 30 Sept. 2024

Next Team Meetings:

Key Status/Updates:

  • YP 5.1 M3 has been released
  • YP 4.0.21 has been released
  • YP 5.1 rc1 (final release) is being built
  • There are YP 5.2 proposed milestone dates https://docs.google.com/document/d/1TDrD9nFjosvLHa7EfL_Y1-1slK7u5Am6NZV6QRF2P6s/edit - please review and let us know if there are any concerns.
  • The final pieces of the release were merged:
    • sanity test for Ubuntu 24.04 userns/apparmor issue added
    • TCLIBCAPPEND properly deprecated
    • toaster fixtures tweaked
    • buildtools updated
    • non-deterministic libsdl2 configure issue fixed
    • gitsm configparser change reverted
    • many other varied and useful fixes
  • Since there is now an rc build heading to QA, master and styhead will diverge. There are some patches in master-next which were deemed too late/risky for the release (including the gomod class changes)
  • The new autobuilder has had NAS problems when scaled to final size, those are being worked on but it will delay switching to the new system a little.
  • There is discussion around configuration file markup/syntax related to fragment management on the architecture list, targeting 5.2.

Ways to contribute:

  • As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
  • There is an issue open upstream with the openssl project related to making path relocation of openssl easier (as used in our buildtools tarball and SDK). We’d love assistance in moving this forward and getting some kind of upstream feature merged to make this easier: https://github.com/openssl/openssl/pull/19260
  • There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
  • There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
  • We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
  • Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
  • Help us resolve CVE issues: CVE metrics
  • We have a growing number of bugs in bugzilla, any help with them is appreciated.

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M3 is released.
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 4.0.21 is released.
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives