== Yocto Project Weekly Status June 11, 2019 ==
== Yocto Project Weekly Status July 2nd, 2024 ==
Current Dev Position: YP 2.8 M2<br/>
Current Dev Position: YP 5.1 M2 <br/>
Next Deadline: YP 2.8 Milestone 2 Cutoff July 14th, 2019<br/>
Next Deadline: YP 5.1 M2 Build 8 July 2024<br/>
 
'''SWAT Team Rotation:'''<br/>
 
*SWAT lead is currently: Anuj
*SWAT team rotation: Anuj -> Paul on June 14, 2019
*SWAT team rotation: Paul -> Ross on June 21, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday June 13th at 7:30am PDT (https://zoom.us/j/454367603)
*Bug Triage meeting Thursday July 4th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday July 2nd at 8am PDT (https://zoom.us/j/990892712)  
*Weekly Engineering Sync Tuesday July 2nd at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch - Next event is Tuesday 11th June at 8am PDT (https://www.twitch.tv/yocto_project))
*Twitch - See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*2.8 M1 has been built and rc2 is now undergoing QA (rc1 ran into an issue with a broken autobuilder worker).
*YP 5.0.2 is in QA.
*Stephen continues to be unavailable, please refer any queries to Richard
*YP 5.2 M2 is due to build next week.
*Mailing lists are moving to groups.io instead of our current mailman setup. This shouldn’t impact users directly, more details will be sent to the mailing lists before the transfer. THe Yocto Project lists will move first, followed by OE, likely a week later.
*An issue with code content in python library functions and their effect on task hashes was identified and improvements have merged to bitbake for this.
*We have a new “newcomer” bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs
*A patch changing the way the *FLAGS variables operate merged.
*We’re seeing an increasing number of intermittent failures which affect the autobuilder builds, causing problems for merging patches and for release builds. One cause, a long standing problem with gpg signing testing has finally been root caused and fixed. Several others keep appearing. There is a backlog of them in the bugzilla and we’re opening bugs for the new ones.
*An autobuilder migration blocking issue with cpu emulation under qemu+KVM was identified and worked around by kernel tweaks, thanks Bruce.
*M1 isn’t of ideal quality, there are three ptest timeouts (2.7 had none). The ptest failure rate is however much improved. There is nobody actively working on some of the ptest timeout issues so holding the milestone build wouldn’t have made much difference but its a worrying sign for the project quality.
*Some larger patches are on the list and help reviewing these would be appreciated:
*M1 also has a couple of MIPS issues with the gcc9 upgrade. There doesn’t appear to be much interest in investigating and fixing these which raises questions about supporting the architecture within the project.
**Adding SPDX 3.0 from Joshua
*There was a Yocto Project related article in LWN: https://lwn.net/Articles/788626/
**Improved CVE tooling from Marta
**bitbake-setup and configuration fragments from Alexander
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
**The letter has proved helpful in discussions and helping influence changes at CISA and the CVE Project so has already been useful.
*We continue to have trouble tracking down the rust reproducibility problem in rustdoc. We tested rust 1.78 with master and there is a long list of reported issues on the mailing list unfortunately.


'''Planned Releases for YP 2.8:'''<br/>
'''Ways to contribute:'''<br/>
*M1 Cutoff June 9th
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*M1 Release June 21st
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*M2 Cutoff 14th July
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*M2 Release 26th July
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*M3 Cutoff (Feature Freeze) 25th Aug
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*M3 Release 6th Sept
*Help us resolve CVE issues: CVE metrics
*M4 Cutoff 30th Sept
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*2.8 (M4) Final Release 25th Oct


'''Tracking Metrics:'''<br/>
*WDD 2802 (last week 2787) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1072 (last week 1076)
**Patches in the Pending State: 179 (17%) [last week 205 (19%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 2.6.3 (Thud) is in planning
*YP 5.1 M2 Build date 2024-07-08
*YP 2.7.1 (Warrior) is in planning
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 1478 (last week 2507) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0.2 is in QA.
*Poky Patch Metrics 
*YP 5.0.2 Release Date 2024-07-05
**Total patches found: 1507 (last week 1513)
*YP 4.0.20 Build Date 2024-07-15
**Patches in the Pending State: 641 (43%) [last week 646 (43%)]
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features<br/>


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Latest revision as of 14:40, 2 July 2024

Yocto Project Weekly Status July 2nd, 2024

Current Dev Position: YP 5.1 M2
Next Deadline: YP 5.1 M2 Build 8 July 2024

Next Team Meetings:

Key Status/Updates:

  • YP 5.0.2 is in QA.
  • YP 5.2 M2 is due to build next week.
  • An issue with code content in python library functions and their effect on task hashes was identified and improvements have merged to bitbake for this.
  • A patch changing the way the *FLAGS variables operate merged.
  • An autobuilder migration blocking issue with cpu emulation under qemu+KVM was identified and worked around by kernel tweaks, thanks Bruce.
  • Some larger patches are on the list and help reviewing these would be appreciated:
    • Adding SPDX 3.0 from Joshua
    • Improved CVE tooling from Marta
    • bitbake-setup and configuration fragments from Alexander
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • The letter has proved helpful in discussions and helping influence changes at CISA and the CVE Project so has already been useful.
  • We continue to have trouble tracking down the rust reproducibility problem in rustdoc. We tested rust 1.78 with master and there is a long list of reported issues on the mailing list unfortunately.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 5.0.2 is in QA.
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29