Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
Line 1: Line 1:
== Yocto Project Weekly Status June 11th, 2024 ==
== Yocto Project Weekly Status June 18th, 2024 ==
Current Dev Position: YP 5.1 M2 <br/>
Current Dev Position: YP 5.1 M2 <br/>
Next Deadline: YP 5.1 M2 Build 8 July 2024<br/>
Next Deadline: YP 5.1 M2 Build 8 July 2024<br/>
Line 9: Line 9:


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 4.0.19 has been through QA and is due for release
* Both YP 4.0.19 and YP 5.1 M1 have been through QA and will be released shortly
*YP 5.1 M1 rc2 is in QA
* Patch status tags are now checked for my default. Layers which don't wish this can disable it.
*RFC patches for the CVE tooling changes have been posted, help in review is appreciated
* Fedora 40 support should be almost complete, last issue I'm aware of is in 'expect'
*There are SPDX 3.0 patches ready for review on the mailing list
* Some larger patches are on the list and help reviewing these would be appreciated:
*There are patches proposing that missing patch Upstream-Status entries be a fatal QA error, this is likely to merge soon as there have been no objections to it.
** SPDX 3.0 from Joshua
*We have a fix for the final Fedora 40 issue, thanks Victor.
** CVE tooling from Marta
*We appreciate everyone fixing layers to work with master after recent changes, the autobuilder health is looking greener, thanks!
** bitbake-setup and configuration fragments from Alexander
*The copy_unihashes function was dropped from bitbake after the locked signature file improvements which simplifies further tooling work
*There is discussion on openembedded-architecture about the details around  configuration fragment tooling potentially being integrated into bitbake
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*Please consider signing this to show support for those changes.
*Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*We continue to have trouble tracking down the rust reproducibility problem in rustdoc.
*Through post release upgrading our patch count reduced again and is now the lowest level since July 2008!


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>

Revision as of 12:44, 18 June 2024

Yocto Project Weekly Status June 18th, 2024

Current Dev Position: YP 5.1 M2
Next Deadline: YP 5.1 M2 Build 8 July 2024

Next Team Meetings:

Key Status/Updates:

  • Both YP 4.0.19 and YP 5.1 M1 have been through QA and will be released shortly
  • Patch status tags are now checked for my default. Layers which don't wish this can disable it.
  • Fedora 40 support should be almost complete, last issue I'm aware of is in 'expect'
  • Some larger patches are on the list and help reviewing these would be appreciated:
    • SPDX 3.0 from Joshua
    • CVE tooling from Marta
    • bitbake-setup and configuration fragments from Alexander
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
  • Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 is in QA
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 4.0.19 is ready for release.
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives