Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
(53 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto Project Weekly Status September 19th, 2023 ==
== Yocto Project Weekly Status May 21st, 2024 ==
Current Dev Position: YP 4.3 M4 (Feature Freeze)<br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: 2nd October 2023 YP 4.3 M4 build date<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday September 21st 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 23rd at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday September 19th 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 21st at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*The M3 rc1 QA report is available but the regression report failed, raising a dilemma on whether to release, the TSC needs to discuss
*YP 5.0.1 has been through QA and is pending review for release
*YP 3.1.28 is in QA
*There are some CVE related announcements which are helpful to us:
*The numpy reproducibility issue remains
**There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
*The openssh ptest intermittent failure does have better logs available but we’ve yet to decode what it means:
**CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
http://autobuilder.yocto.io/pub/non-release/20230917-2/testresults/qemuarm64-ptest/openssh.log
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*A significant flaw was found in bitbake’s inotify usage which has been causing rare intermittent build failures. These would only affect usage where BB_SERVER_TIMEOUT was enabled or tinfoil was used (e.g. recipetool, devtool, bitbake-layers). The issue means we’ve switched to using stat() calls and mtime to detect changes. External tools using tinfoil which change files will need to add an API call to have bitbake refresh its caches.
**Please consider signing this to show support for those changes.
*On a positive note, those issues do explain some of the timeout and AB-INT failures that have been puzzling us for some time. Fixing it also allows the flush() call removal in server logging, which should improve bitbake server’s performance during heavy I/O.
**Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*There are patches pending to tweak the layout of deploy/licenses/ and SPDX’s file layout to avoid overlapping files in builds breaking due to “shared” files being removed unexpectedly. We will likely enforce non-overlapping files for symlinks under sstate control going forward to avoid these issues in future.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date. Marta sent out an update last week on this (thanks!)
*We are continuing to see large numbers of version upgrades of recipes, some of which are having destabilizing effects. This may mean we have to reduce the numbers being accepted to stabilize for release.
*gcc 14 has merged to master. There are errors in meta-arm, meta-virtualization and meta-mingw. Now that has merged, we will build and release a new uninative version.
*We’re happy to be able to announce that some of the work in the RFQ will now be progressing, specifically that:
*More of the WORKDIR to UNPACKDIR transition has merged and devtool oe-local-files support has been dropped.
**Marta Rybczynska (Syslinbit) will be working on the security topic
*The next stage of the WORKDIR changes is pending testing in master-next.
**Alexander Kanvin (Linutronix) will be working on the core workflow topic
*The aim is to build YP 5.1 M1 as soon as the various queued patches stabilize.
**Savoir-faire Linux will be working on the toaster and VSCode topics
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
**BayLibre will be working on the patchtest and project tooling topics
*Automated testing continues to show large numbers of problems (e.g. a reproducibility issue in spirv-tools) but we continue to work through and fix issues as quickly as we can.
**Michael Opdenacker (Bootlin) will be working on the binary distro topic
*Two issues causing failures on the new test infrastructure were tracked down to problems in bitbake. Both were effectively timing related issues.
**Smile will be working on the meta-openembedded topic area
PR server pass through support merged.
We’d also note that Tim Orling (Konsulko) will be working on the layer index.
*A rust build issue of x86 hosted builds vs arm hosted builds has been identified as the cause of intermittent failures. Whilst this can be fixed, the fix breaks tests and/or reproducibility which gives challenges given the need to fix scarthgap. There are also challenges upgrading to newer rust versions.
*The performance graph improvements have merged.
*Improvements to the patch and CVE metrics page have also merged.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: patchtest, layerindex, devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 4.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_4.2_Unassigned_Enhancements.2FBugs
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics  
*Help us resolve CVE issues: CVE metrics  
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
'''YP 4.3 Milestone Dates:'''<br/>
*YP 4.3 M3 is being reviewed.
*YP 4.3 M4 build date  2023/10/02
*YP 4.3 M4 Release date 2023/10/27
'''Upcoming dot releases:'''<br/>
*YP 3.1.28 in QA
*YP 4.0.13 build date 2023/09/25
*YP 4.0.13 Release date 2023/10/06
*YP 3.1.29 build date 2023/10/30
*YP 3.1.29 Release date 2023/11/10
*YP 4.0.14 build date 2023/11/06
*YP 4.0.14 Release date 2023/11/17
*YP 4.2.4 build date 2023/11/13
*YP 4.2.4 Release date 2023/11/24
*YP 3.1.30 build date 2023/12/11
*YP 3.1.30 Release date 2023/12/22
*YP 4.0.15 build date 2023/12/18
*YP 4.0.15 Release date 2023/12/29


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2505 (last week 2530) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2752 (last week 2740) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1185 (last week 1186)
**Total patches found: 1127 (last week 1128)
**Patches in the Pending State: 255 (22%) [last week 255 (22%)]
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
'''YP 5.1 Milestone Dates:'''<br/>
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Release date 2024-05-31
*YP 5.1 M2 Build date 2024-07-08
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25
'''Upcoming dot releases:'''<br/>
*YP 5.0.1 is ready for release.
*YP 4.0.19 build date 2024-06-03
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
Line 67: Line 80:


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]

Revision as of 14:44, 21 May 2024

Yocto Project Weekly Status May 21st, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 5.0.1 has been through QA and is pending review for release
  • There are some CVE related announcements which are helpful to us:
    • There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
    • CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • Please consider signing this to show support for those changes.
    • Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date. Marta sent out an update last week on this (thanks!)
  • gcc 14 has merged to master. There are errors in meta-arm, meta-virtualization and meta-mingw. Now that has merged, we will build and release a new uninative version.
  • More of the WORKDIR to UNPACKDIR transition has merged and devtool oe-local-files support has been dropped.
  • The next stage of the WORKDIR changes is pending testing in master-next.
  • The aim is to build YP 5.1 M1 as soon as the various queued patches stabilize.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Automated testing continues to show large numbers of problems (e.g. a reproducibility issue in spirv-tools) but we continue to work through and fix issues as quickly as we can.
  • Two issues causing failures on the new test infrastructure were tracked down to problems in bitbake. Both were effectively timing related issues.

PR server pass through support merged.

  • A rust build issue of x86 hosted builds vs arm hosted builds has been identified as the cause of intermittent failures. Whilst this can be fixed, the fix breaks tests and/or reproducibility which gives challenges given the need to fix scarthgap. There are also challenges upgrading to newer rust versions.
  • The performance graph improvements have merged.
  • Improvements to the patch and CVE metrics page have also merged.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 5.0.1 is ready for release.
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives