== Yocto Project Weekly Status April 16, 2019 ==
== Yocto Project Weekly Status May 14th, 2024 ==
Current Dev Position: YP 2.7 M4 (2.7 rc2 is in QA)<br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: YP 2.7 Release Target April 26, 2019<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>
 
'''SWAT Team Rotation:'''<br/>
 
*SWAT lead is currently: Chen
*SWAT team rotation: Chen -> Armin on Apr. 19, 2019
*SWAT team rotation: Armin -> Anuj on Apr. 26, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*YP 2.8 Planning meeting Tuesday April 16nd at 8am PDT (https://zoom.us/j/990892712)  
*Bug Triage meeting Thursday May 16th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday April 18th at 7:30am PDT (https://zoom.us/j/454367603)
*Weekly Engineering Sync Tuesday May 14th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*Stephen is unavailable at the moment, please refer any queries to Richard
*YP 4.0.18 has been released
*YP 2.6.2 was rebuilt as rc4 to include the boost upgrade revert and is due to be released today. The YP 2.6.2 rc3/4 report is summarized at https://lists.yoctoproject.org/pipermail/yocto/2019-April/044827.html and the results are at https://autobuilder.yocto.io/pub/releases/yocto-2.6.2.rc4/testresults/.
*YP 5.0.1 rc2 is in QA.
*YP 2.5.3 is currently going through the QA process.
*YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
*We’re sad to announce that we will be removing eclipse plugin builds from the autobuilder and will not be including the plugin in any future project releases. This is due to a lack of anyone able to help work on the plugin development, bug fixing or release.
*There are some CVE related announcements which are helpful to us:
*The key fixes mentioned in last week’s status have been merged into 2.7.
**There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
*A key bug in pseudo was identified which may be the root cause of the long standing glibc-locale uid “host contamination” issue. Many thanks to Peter and Otavio for the help in debugging that. A separate fix should also ensure pseudo works with newer distro coreutils and glibc versions.
**CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
*YP 2.7 rc2 (warrior) was built successfully and is currently going through the QA process after 2.5.3 is done.
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
*The ptest results in 2.7 are much more stable than ever before with results being consistent from build to build. At the start of 2.8 we can make some further improvements so we take advantage of this and build upon it to reduce regressions in the system.
**Please consider signing this to show support for those changes.
*In an effort to keep the patch queue under control, patches are merging to master.
**Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*The list of issues from last week of worrying things we lack resources to improve upon remains:
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
**Intermittent autobuilder failures (fork running out of resources - which resources?, oe-selftest intermittent issues, gpg signing resource problems, occasional PR server failure and more)
*The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
**Build-appliance testing issues (show up on each QA report across multiple releases)
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
**40% valgrind ptest failures
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
**Known bitbake memory resident bugs
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
**Other ptest failures
*Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.
*The 2.8 planning discussions are starting and there is a google doc summarising the discussions so far: https://docs.google.com/document/d/1CNEKA4d0eT6-e0hnS2pwi7xdZ5_t6smpZO2HbaJGXbU/
 
*If people are planning to work on specific things in 2.8 please let us know so we can incorporate this into our plans. If you’re interested in working on anything in the document, please also let us know or talk with us in one of the planning meetings.
'''Ways to contribute:'''<br/>
*As people are likely aware, the project has a number of components which are either unmaintained, or have people with little to no time trying to keep them alive. These components include: devtool, toaster, wic, oeqa, autobuilder, CROPs containers, pseudo and more. Many have open bugs. Help is welcome in trying to better look after these components!
*There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
*There are bugs that are currently unassigned for YP 5.1. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium+_5.1_Unassigned_Enhancements/Bugs
*We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
*Help is very much welcome in trying to resolve our autobuilder intermittent issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT.
*Help us resolve CVE issues: CVE metrics
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''Planned Releases for YP 2.7:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 2.7 M4 Cutoff was Apr. 1, 2019
*WDD 2740 (last week 2720) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 2.7 M4 Release Target is Apr. 26, 2019
*OE-Core/Poky Patch Metrics
**Total patches found: 1128 (last week 1125)
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''Planned upcoming dot releases:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
*YP 2.5.3 (Sumo) is in QA.
*YP 5.1 M1 Build date 2024-05-20
*YP 5.1 M1 Release date 2024-05-31
*YP 5.1 M2 Build date 2024-07-08
*YP 5.1 M2 Release date 2024-07-19
*YP 5.1 M3 Build date 2024-08-26
*YP 5.1 M3 Release date 2024-09-06
*YP 5.1 M4 Build date 2024-09-30
*YP 5.1 M4 Release date 2024-10-25


'''Tracking Metrics:'''<br/>
'''Upcoming dot releases:'''<br/>
*WDD 2523  (last week 2442) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 4.0.18 is released.
*Poky Patch Metrics 
*YP 5.0.1 is in QA.
**Total patches found: 1553 (last week 1553)
*YP 4.0.19 build date 2024-06-03
**Patches in the Pending State: 654 (42%) [last week 655 (42%)]
*YP 4.0.19 Release date 2024-06-14
*YP 5.0.2 Build Date 2024-06-24
*YP 5.0.2 Release Date 2024-07-05
*YP 4.0.20 Build Date 2024-07-15
*YP 4.0.20 Release Date 2024-07-26
*YP 5.0.3 Build Date 2024-08-12
*YP 5.0.3 Release Date 2024-08-23
*YP 4.0.21 Build Date 2024-09-09
*YP 4.0.21 Release Date 2024-09-20
*YP 5.0.4 Build Date 2024-09-23
*YP 5.0.4 Release Date 2024-10-04
*YP 4.0.22 Build Date 2024-10-14
*YP 4.0.22 Release Date 2024-10-25
*YP 5.0.5 Build Date 2024-11-11
*YP 5.0.5 Release Date 2024-11-22
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29


'''Key Status Links for YP:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status<br/>
https://wiki.yoctoproject.org/wiki/TSC<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule<br/>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features<br/>


== Archives ==
== Archives ==
*[[2024 Yocto Project Weekly Status Archive]]
*[[2023 Yocto Project Weekly Status Archive]]
*[[2022 Yocto Project Weekly Status Archive]]
*[[2021 Yocto Project Weekly Status Archive]]
*[[2020 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2018 Yocto Project Weekly Status Archive]]
*[[2019 Yocto Project Weekly Status Archive]]

Revision as of 14:38, 14 May 2024

Yocto Project Weekly Status May 14th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 4.0.18 has been released
  • YP 5.0.1 rc2 is in QA.
  • YP 5.0.1 rc1 was abandoned due to high numbers of intermittent failures.
  • There are some CVE related announcements which are helpful to us:
    • There was a CVE 5.1 Record format announcement with changes that encourage more useful data from our perspective
    • CISA announced on linkedin the creation of https://github.com/cisagov/vulnrichment
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
    • Please consider signing this to show support for those changes.
    • Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • The WORKDIR to UNPACKDIR transition and redefinition of UNPACKDIR now has patches under testing in master-next, including updates to recipetool and devtool which pass our automated tests.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.
  • Our automated tests have been seeing a number of intermittent issues. An email was sent detailing a few of these and the response with several patches or patches in progress has been extremely helpful and they’re very gratefully received.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 4.0.18 is released.
  • YP 5.0.1 is in QA.
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives