Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status November 1st, 2022 ==
== Yocto Project Weekly Status November 8th, 2022 ==
Current Dev Position: YP 4.2 M1<br/>
Current Dev Position: YP 4.2 M1<br/>
Next Deadline: 5th December 2022 YP 4.2 M1 Build<br/>
Next Deadline: 5th December 2022 YP 4.2 M1 Build<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday November 3rd7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday November 10th 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday November 1st 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday November 8th 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


Line 33: Line 33:
'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>


*YP 4.0.5 is in QA
*YP 4.0.5 is released.
*YP 4.0.5 Release date 2022/11/11
*YP 4.1.1 build date 2022/11/14
*YP 4.1.1 build date 2022/11/14
*YP 4.1.1 Release date 2022/11/25
*YP 4.1.1 Release date 2022/11/25
Line 65: Line 64:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2412 (last week 2481) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2424 (last week 2412) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
*OE-Core/Poky Patch Metrics
**Total patches found: 1207 (last week 1217)
**Total patches found: 1201 (last week 1207)
**Patches in the Pending State: 309 (26%) [last week 311 (26%)]
**Patches in the Pending State: 296 (25%) [last week 309 (26%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/



Revision as of 15:25, 8 November 2022

Yocto Project Weekly Status November 8th, 2022

Current Dev Position: YP 4.2 M1
Next Deadline: 5th December 2022 YP 4.2 M1 Build

Next Team Meetings:

Key Status/Updates:

  • YP 4.0.5 rc1 was built and is in QA.
  • Patches have started merging for YP 4.2, most of the backlog should have merged
  • The CVEs in master have mostly been handled and numbers are dropping
  • The number of AB-INT issues continues to be of concern

Ways to contribute:

YP 4.2 Milestone Dates:

  • YP 4.2 M1 build date 2022/12/05
  • YP 4.2 M1 Release date 2022/12/16
  • YP 4.2 M2 build date 2023/01/23
  • YP 4.2 M2 Release date 2023/02/03
  • YP 4.2 M3 build date 2023/02/20
  • YP 4.2 M3 Release date 2023/03/03
  • YP 4.2 M4 build date 2023/04/03
  • YP 4.2 M4 Release date 2023/04/28

Upcoming dot releases:

  • YP 4.0.5 is released.
  • YP 4.1.1 build date 2022/11/14
  • YP 4.1.1 Release date 2022/11/25
  • YP 3.1.21 build date 2022/11/28
  • YP 3.1.21 Release date 2022/12/09
  • YP 4.0.6 build date 2022/12/12
  • YP 4.0.6 Release date 2022/12/23
  • YP 4.1.2 build date 2023/01/09
  • YP 4.1.2 Release date 2023/01/20
  • YP 3.1.22 build date 2023/01/16
  • YP 3.1.22 Release date 2023/01/27
  • YP 4.0.7 build date 2023/01/30
  • YP 4.0.7 Release date 2023/02/10
  • YP 3.1.23 build date 2023/02/13
  • YP 3.1.23 Release date 2023/02/24
  • YP 4.0.8 build date 2023/02/27
  • YP 4.0.8 Release date 2023/03/10
  • YP 4.1.3 build date 2023/03/06
  • YP 4.1.3 Release date 2023/03/17
  • YP 3.1.24 build date 2023/03/20
  • YP 3.1.24 Release date 2023/03/31
  • YP 4.0.9 build date 2023/04/10
  • YP 4.0.9 Release date 2023/04/21
  • YP 4.1.4 build date 2023/05/01
  • YP 4.1.4 Release date 2023/05/13
  • YP 3.1.25 build date 2023/05/08
  • YP 3.1.25 Release date 2023/05/19
  • YP 4.0.10 build date 2023/05/15
  • YP 4.0.10 Release date 2023/05/26

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives