Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 1: Line 1:
== Yocto Project Weekly Status Nov. 2nd, 2021 ==
== Yocto Project Weekly Status Nov. 9th, 2021 ==
Current Dev Position: YP 3.5 M1<br/>
Current Dev Position: YP 3.5 M1<br/>
Next Deadline: 6th Dec. 2021 YP 3.5 M1 build<br/>
Next Deadline: 6th Dec. 2021 YP 3.5 M1 build<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday Nov. 4th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday Nov. 11th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Monthly Project Meeting Tuesday Nov. 2nd at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Monthly Project Meeting Tuesday Dec. 7th at 8am  PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Nov. 9th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday Nov. 9th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester
Line 34: Line 34:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 3.3.4 build date 2021/11/01
*YP 3.3.4 is in QA
*YP 3.3.4 Release date 2021/11/12
*YP 3.1.12 build date 2021/11/15
*YP 3.1.12 build date 2021/11/15
*YP 3.1.12 Release date 2021/11/26
*YP 3.1.12 Release date 2021/11/26
Line 54: Line 53:


'''Tracking Metrics:'''<br/>
'''Tracking Metrics:'''<br/>
*WDD 2655 (last week 2655) (https://wiki.yoctoproject.org/charts/combo.html)
*WDD 2633 (last week 2655) (https://wiki.yoctoproject.org/charts/combo.html)
*Poky Patch Metrics   
*Poky Patch Metrics   
**Total patches found: 1283 (last week 1288)
**Total patches found: 1275 (last week 1283)
**Patches in the Pending State: 463 (36%) [last week 476 (37%)]
**Patches in the Pending State: 451 (35%) [last week 463 (36%)]


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Revision as of 15:34, 9 November 2021

Yocto Project Weekly Status Nov. 9th, 2021

Current Dev Position: YP 3.5 M1
Next Deadline: 6th Dec. 2021 YP 3.5 M1 build

Next Team Meetings:

Key Status/Updates:

  • YP 3.4 has been released. Thanks to everyone who contributed!
  • YP 3.3.4 is due to build this week and will be the last planned release of the hardknott series.
  • YP 3.5 Planning document: https://docs.google.com/document/d/1OXw-NKoL_Vb9RWI6sRPs3zTcAn4hHPtG0Y2BIs7xIzo/edit?usp=sharing
  • Git’s default branch choice could potentially change in the future and we’re seeing service providers like github change policy too. To react to this variability the project really needs to start encoding the branch name used in SRC_URI rather than having a default of master. OE-Core has been converted and there is a script ( scripts/contrib/convert-srcuri.py) to help with conversions. Bitbake will start warning where this is unset soon (patch in master-next).
  • Github has announced that git protocol support will be dropped as of January. We use this in a number of our SRC_URIs. This has been discussed on the architecture list and we have a plan to warn (and later error) on problematic urls and magically map to the correct urls within bitbake. The latter change is easily backported to older bitbake releases and will allow older branches to continue to function without invasive changes. The conversion script mentioned above can also convert github urls.
  • We have seen a drop in the number of patches in “Pending” state, partly thanks to work from Richard to send libtool and gcc patches upstream or otherwise clean them up. Others are also stepping forward to try and reduce the number of patches in Pending state, help would be much appreciated as spread over a number of people this could be quickly handled and reduced.
  • Intermittent issues continue to rise and help is very much welcome on these issues. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT

Ways to contribute:

YP 3.5 Milestone Dates:

  • YP 3.5 M1 build date 2021/12/06
  • YP 3.5 M1 Release date 2021/12/17
  • YP 3.5 M2 build date 2022/01/10
  • YP 3.5 M2 Release date 2022/1/21
  • YP 3.5 M3 build date 2022/2/21
  • YP 3.5 M3 Release date 2022/03/04
  • YP 3.5 M4 build date 2022/04/04
  • YP 3.5 M4 Release date 2022/04/29

Upcoming dot releases:

  • YP 3.3.4 is in QA
  • YP 3.1.12 build date 2021/11/15
  • YP 3.1.12 Release date 2021/11/26
  • YP 3.4.1 build date 2021/11/22
  • YP 3.4.1 Release date 2021/12/03
  • YP 3.1.13 build date 2021/12/13
  • YP 3.1.13 Release date 2021/12/22
  • YP 3.1.14 build date 2022/01/24
  • YP 3.1.14 Release date 2022/02/04
  • YP 3.4.2 build date 2022/02/07
  • YP 3.4.2 Release date 2022/02/18
  • YP 3.1.15 build date 2022/03/14
  • YP 3.1.15 Release date 2022/03/25
  • YP 3.4.3 build date 2022/03/21
  • YP 3.4.3 Release date 2022/04/01
  • YP 3.1.16 build date 2022/04/25
  • YP 3.1.16 Release date 2022/05/06

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives