== Yocto Project Weekly Status Feb. | == Yocto Project Weekly Status Feb. 23, 2021 == | ||
Current Dev Position: YP 3.3 M3 development<br/> | Current Dev Position: YP 3.3 M3 development<br/> | ||
Next Deadline: 1st March 2021 YP 3.3 M3 build<br/> | Next Deadline: 1st March 2021 YP 3.3 M3 build and YP 3.3 Feature Freeze<br/> | ||
'''Next Team Meetings:'''<br/> | '''Next Team Meetings:'''<br/> | ||
*Bug Triage meeting Thursday Feb. | *Bug Triage meeting Thursday Feb. 25th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) | ||
*Monthly Project Meeting Tuesday Mar. 2nd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | *Monthly Project Meeting Tuesday Mar. 2nd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | ||
*Weekly Engineering Sync Tuesday Feb. | *Weekly Engineering Sync Tuesday Feb. 23rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | ||
*Twitch - See https://www.twitch.tv/theyoctojester | *Twitch - See https://www.twitch.tv/theyoctojester | ||
Line 31: | Line 31: | ||
'''Planned upcoming dot releases:'''<br/> | '''Planned upcoming dot releases:'''<br/> | ||
*YP 3.2.2 | *YP 3.2.2 being reviewed for release. | ||
*YP 3.1.6 is in QA. | |||
*YP 3.1.6 | |||
*YP 3.2.3 build date 2021/03/08 | *YP 3.2.3 build date 2021/03/08 | ||
*YP 3.2.3 release date 2021/03/19 | *YP 3.2.3 release date 2021/03/19 | ||
Line 41: | Line 39: | ||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> | ||
*WDD | *WDD 2647 (last week 2618) (https://wiki.yoctoproject.org/charts/combo.html) | ||
*Poky Patch Metrics | *Poky Patch Metrics | ||
**Total patches found: | **Total patches found: 1269 (last week 1272) | ||
**Patches in the Pending State: | **Patches in the Pending State: 487 (39%) [last week 490 (39%)] | ||
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> | '''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> |
Revision as of 15:42, 23 February 2021
Yocto Project Weekly Status Feb. 23, 2021
Current Dev Position: YP 3.3 M3 development
Next Deadline: 1st March 2021 YP 3.3 M3 build and YP 3.3 Feature Freeze
Next Team Meetings:
- Bug Triage meeting Thursday Feb. 25th at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
- Monthly Project Meeting Tuesday Mar. 2nd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Weekly Engineering Sync Tuesday Feb. 23rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Twitch - See https://www.twitch.tv/theyoctojester
Key Status/Updates:
- YP 3.2.2 is currently building.
- We’ve been upgrading uninative and buildtools-extended-tarball however glibc 2.33 has caused issues with build in containers and with pseudo. Hopefully these issues are now resolved or worked around with the latest patches.
- There is apparently a reputation that Yocto Project is not reproducible. It’s builds are! We now have an live status report on our website for this: https://www.yoctoproject.org/reproducible-build-results/ showing the status live from the autobuilder (thanks Joshua and Michael)
- Given the above, we’ve managed to improve the reproducible selftest by separating to its own autobuilder target and showing which exclusions are no longer needed.
- We have also fixed reproducibility issues in a number of recipes. There are still some low hanging issues in the current exclusion list.
- The AUH (Automatic Upgrade Helper) has run and was relatively successful, please help us get the version upgrades in before M3 builds on the 1st.
- We’ve changed the default umask applying to tasks in builds to make it easier to avoid reproducibility issues (bitbake now has a BB_DEFAULT_UMASK variable).
- Intermittent autobuilder issues continue to occur. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
Ways to contribute:
- There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
- There are bugs that are currently unassigned for YP 3.3. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.3_Unassigned_Enhancements.2FBugs
- We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
YP 3.3 Milestone Dates:
- YP 3.3 M3 build date 2021/03/01
- YP 3.3 M3 Release date 2021/03/12
- YP 3.3 M4 build date 2021/04/05
- YP 3.3 M4 Release date 2021/04/30
Planned upcoming dot releases:
- YP 3.2.2 being reviewed for release.
- YP 3.1.6 is in QA.
- YP 3.2.3 build date 2021/03/08
- YP 3.2.3 release date 2021/03/19
- YP 3.1.7 build date 2021/03/29
- YP 3.1.7 release date 2021/04/09
Tracking Metrics:
- WDD 2647 (last week 2618) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1269 (last week 1272)
- Patches in the Pending State: 487 (39%) [last week 490 (39%)]
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC