Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 21: Line 21:


'''YP 3.3 Milestone Dates:'''<br/>
'''YP 3.3 Milestone Dates:'''<br/>
*YP 3.3 M2 was released.
*YP 3.3 M3 build date 2021/03/01
*YP 3.3 M3 build date 2021/03/01
*YP 3.3 M3 Release date 2021/03/12
*YP 3.3 M3 Release date 2021/03/12

Revision as of 15:39, 9 February 2021

Yocto Project Weekly Status Feb. 9, 2021

Current Dev Position: YP 3.3 M3 development
Next Deadline: 1st March 2021 YP 3.3 M3 build

Next Team Meetings:

Key Status/Updates:

  • We’ve merged a number of key upgrades to glibc, binutils and autoconf in particular which has caused some issues in other layers. Thanks to everyone helping work through those issues.
  • We’ve upgraded uninative, with a final 2.32 version containing an upstream fix and then a version with 2.33. There are early reports there may be a build issue with kernels and 2.33.
  • Intermittent autobuilder issues continue to occur. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT
  • There are some interesting insights from the SWAT status reports that are now being generated, in particular they show the frequency that some bugs are occurring which should help us try and target the most problematic failures: https://lists.yoctoproject.org/g/swat/topic/swat_statistics_for_week_05/80466229 The reports can be seen on the swat mailing list (which anyone can join).

Ways to contribute:

YP 3.3 Milestone Dates:

  • YP 3.3 M3 build date 2021/03/01
  • YP 3.3 M3 Release date 2021/03/12
  • YP 3.3 M4 build date 2021/04/05
  • YP 3.3 M4 Release date 2021/04/30

Planned upcoming dot releases:

  • YP 3.2.2 build date 2021/02/08
  • YP 3.2.2 release date 2021/02/19
  • YP 3.1.6 build date 2021/02/22
  • YP 3.1.6 release date 2021/03/05
  • YP 3.2.3 build date 2021/03/08
  • YP 3.2.3 release date 2021/03/19
  • YP 3.1.7 build date 2021/03/29
  • YP 3.1.7 release date 2021/04/09

Tracking Metrics:

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives