Line 1: | Line 1: | ||
== Yocto Project Weekly Status Oct. | == Yocto Project Weekly Status Oct. 20, 2020 == | ||
Current Dev Position: YP 3.2 M4<br/> | Current Dev Position: YP 3.2 M4<br/> | ||
Next Deadline: YP 3.2 M4 Feature Freeze - Now<br/> | Next Deadline: YP 3.2 M4 Feature Freeze - Now<br/> | ||
'''Next Team Meetings:'''<br/> | '''Next Team Meetings:'''<br/> | ||
*Bug Triage meeting Thursday Oct. | *Bug Triage meeting Thursday Oct. 22nd at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09) | ||
*Monthly Project Meeting Tuesday Nov. 3rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | *Monthly Project Meeting Tuesday Nov. 3rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | ||
*Weekly Engineering Sync Tuesday Oct. | *Weekly Engineering Sync Tuesday Oct. 20th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09) | ||
*Twitch - See https://www.twitch.tv/theyoctojester | *Twitch - See https://www.twitch.tv/theyoctojester | ||
Line 26: | Line 26: | ||
'''Planned upcoming dot releases:'''<br/> | '''Planned upcoming dot releases:'''<br/> | ||
*YP 3.1.4 build date 2020/11/2 | *YP 3.1.4 build date 2020/11/2 | ||
*YP 3.1.4 release date 2020/11/13 | *YP 3.1.4 release date 2020/11/13 | ||
'''Tracking Metrics:'''<br/> | '''Tracking Metrics:'''<br/> | ||
*WDD | *WDD 2526 (last week 2506) (https://wiki.yoctoproject.org/charts/combo.html) | ||
*Poky Patch Metrics | *Poky Patch Metrics | ||
**Total patches found: | **Total patches found: 1276 (last week 1273) | ||
**Patches in the Pending State: | **Patches in the Pending State: 495 (39%) [last week 494 (39%)] | ||
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> | '''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/> |
Revision as of 14:28, 20 October 2020
Yocto Project Weekly Status Oct. 20, 2020
Current Dev Position: YP 3.2 M4
Next Deadline: YP 3.2 M4 Feature Freeze - Now
Next Team Meetings:
- Bug Triage meeting Thursday Oct. 22nd at 7:30am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
- Monthly Project Meeting Tuesday Nov. 3rd at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Weekly Engineering Sync Tuesday Oct. 20th at 8am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
- Twitch - See https://www.twitch.tv/theyoctojester
Key Status/Updates:
- YP 3.1.3 has been released.
- We are now (over)due to build M4 rc1. There are currently three high bugs blocking the final M4 build, a buildtools issue where buildtools needs updating in the install script, a toaster issue with recent bitbake cooker process changes and a missing kea init script..
- Major pseudo changes have been merged and are now testing cleanly on the testing infrastructure. The known community reported issues have also been resolved and a couple of underlying pseudo bugs discovered and fixed too. Interestingly there was around a 2GB reduction in the size of the pseudo databases for core-image-sato after the path filtering was added.
- Victor did some great work in understanding why qemumips was so much slower than qemumips64 and by changing the number of TLBs (easy in software!). we were able to see a 40% speedup in 32 mips qemu test execution times. A further piece of good news is upstream look willing to add functionality which lets us configure the number of TLBs so we shouldn’t have to maintain anything out of tree, thanks Victor!
- Unfortunately, intermittent autobuilder issues are still occurring, whilst reducing in frequency and number, possibly due to less frequency full rebuilds. You can see the list of failures we’re continuing to see by searching for the “AB-INT” tag in bugzilla: https://bugzilla.yoctoproject.org/buglist.cgi?quicksearch=AB-INT Help with any of these would be much appreciated, unfortunately it is proving hard to find anyone interested in helping figure these out and they significantly hamper our testing.
Ways to contribute:
- There are bugs identified as possible for newcomers to the project: https://wiki.yoctoproject.org/wiki/Newcomers
- There are bugs that are currently unassigned for YP 3.2. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.2_Unassigned_Enhancements.2FBugs
- We’d welcome new maintainers for recipes in OE-Core. Please see the list at: http://git.yoctoproject.org/cgit.cgi/poky/tree/meta/conf/distro/include/maintainers.inc and discuss with the existing maintainer, or ask on the OE-Core mailing list. We will likely move a chunk of these to “Unassigned” soon to help facilitate this.
YP 3.2 Milestone Dates:
- YP 3.2 M4 build date 2020/10/5
- YP 3.2 M4 Release date 2020/10/30
Planned upcoming dot releases:
- YP 3.1.4 build date 2020/11/2
- YP 3.1.4 release date 2020/11/13
Tracking Metrics:
- WDD 2526 (last week 2506) (https://wiki.yoctoproject.org/charts/combo.html)
- Poky Patch Metrics
- Total patches found: 1276 (last week 1273)
- Patches in the Pending State: 495 (39%) [last week 494 (39%)]
The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC