Line 114: Line 114:
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
|-
|-
| Documentation || TBD || bgcolor="" |
| Documentation || None || bgcolor="" |
|-
|-
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="" |  
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="" |  
|-
|-
| Package Update || 50% of the target || bgcolor="" |
| Package Update || about 70% of the target || bgcolor="" |
|-
|-
| Upstream Commits || Have upstream status updated on 100% of patches (so that we can have a status update) || bgcolor="" |
| Upstream Commits || Have upstream status updated on 100% of patches (so that we can have a status update) || bgcolor="" |

Revision as of 16:28, 3 January 2012

Yocto Project 1.2 release Status

Feature/Task Board

Scheduled Design Design Review Development Patch Review Testing Done Blocked
1277[1], Shane, M2, 8 1629[2], M2, Beth, 5 1634[3], M2, Bruce, 3 1582[4], M2, Joshua, 4 1674[5], M1, Xiaofeng, 3 1744[6], Shane, M2, 1 1461[7], M1, Beth, 0
1615[8], Xiaofeng, M2, 2 1598[9], M2, Paul, 9 1635[10], M1, Darren, 5 1008[11], M1, ScottG, 3 1748[12], Shane, M2, 1 1580[13], M1, Jessica, 0
1581[14], Shane, M2, 2 1655[15], M2, Xiaofeng, 1 1678[16], M2, Tom, 1 1636[17], M1, Darren, 6 1126[18], M2, Lianhao, 1 1805[19], Jessica, M2, 1 1627[20], M1, Beth, 0
1241[21], Shane, M2, 2 1638[22], M2, Bruce, 1 1628[23], M2, Beth, 1 1567[24], M1, Yi, 5 1555[25], M2, Lianhao, 1 1564[26], M1, Dongxiao, 0
1543[27], ScottG, M2, 2 1629[28], M2, Beth, 1 1590[29], M2, Wenzhong, 1 1556[30], M2, Lianhao, 1 1644[31], M1, Bruce, 0
1145[32], ScottG, M2, 2 1621[33], M2, Dexuan, 1 1630[34], M2, Tom, 1 1734[35], M2, Edwin, 1 1742[36], M1, Dongxiao, 0
1763[37], Saul, M2, 2 ? 1847[38], M2, Liming, 1 1743[39], M1, Dongxiao, 0
1566[40], Paul, M2, 2 1589[41], M2, Liezhi, 1 1745[42], M1, Dongxiao, 0
1654[43], Paul, M2, 2 1651[44], M2, Leizhi, 1 (QA) 1747[45], M1, Dongxiao, 0
1584[46], Jiajun, M2, 2 1608[47], M2, Josh, 1 1732[48], M1, Dexuan, 0
1595[49], Jiajun, M2, 2 1733[50], M2, Edwin, 1 1660[51], M1, Tom, 0
1736[52], Edwin, M2, 2 1272[53], M2, Dongxiao, 1 (QA) 1661[54], M1, Tom, 0
1614[55], Daren, M2, 2 1572[56], M2, Dongxiao, 1 (QA) 1751[57], M1, Shane, 0
1642[58], Daren, M2, 2 1750[59], M2, Dongxiao, 1 (QA) 1565[60], M1, Paul, 0
1647[61], Daren, M2, 2 1752[62], M2, Dongxiao, 1 (QA) 1546[63], M1, Beth, 0
1830[64], Daren, M2, 2 1775[65], M2, Dongxiao, 1 (QA) 1603[66], M1, Wenzhong, 0
1649[67], Daren, M2, 2 1787[68], M2, Dongxiao, 1 (QA) 1568[69], M1, Jiajun, 0
1303[70], Dongxiao, M2, 2 1792[71], M2, Dongxiao, 1 (QA)
1729[72], Dongxiao, M2, 2 1872[73], M2, Dongxiao, 1 (QA)
1730[74], Dongxiao, M2, 2 1643[75], M2, Bruce, 1
1764[76], M2, Belen, 1
1809[77], M2, Belen, 1
1573[78], M3, Shane, 1

Note: Each column lists "Feature #, Target Milestone, Owner, # of weeks in this stage".

Project Dashboard

Feature-burndown12.png

Yocto Project 1.2 Release Criteria

Milestone 1

Release Criteria Milestone 1 Target Milestone 1 Status
Functional Completion All P1 features are completed. Feature-burndown12-M1.png
See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details.
Build and Release (Yocto) All completed features can be built with no errors. Complete
Build and Release (BSPs) Core and meta-intel BSPs can be built with no errors. Complete
Open Bugs All bugs have been dispositioned. High issues have been fixed. [79] - new bugs for 1.2.
HIGH priority bugs - high bugs for 1.2
See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Distros Tested Fedora, Ubuntu, Opensuse current version Fedora 15, Opensuse 11.4 and Ubuntu 11.04
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Documentation Doc for windows user to deploy a Yocto BSP image on the hardware Complete
Build Performance Try to at least maintain the current performance and improve if possible. M1 improved performance.
Package Update 50% of the target 90%
Upstream Commits Have upstream status updated on 100% of patches (so that we can have a status update) Complete (a little below the target, will do better)
Marketing Deliverables None N/A
Publication Yocto 1.2, Milestone 1 release is announced Complete

Milestone 2

Release Criteria Milestone 2 Target Milestone 2 Status
Functional Completion All P1 features are completed. Feature-burndown12-M2.png
See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core and meta-intel BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. High issues have been fixed. [80] - new bugs for 1.2.
HIGH priority bugs - high bugs for 1.2
See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Distros Tested Fedora, Ubuntu, Opensuse current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Documentation None
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update about 70% of the target
Upstream Commits Have upstream status updated on 100% of patches (so that we can have a status update)
Marketing Deliverables None N/A
Publication Yocto 1.2, Milestone 1 release is announced