Weekly Status

From Yocto Project
Jump to navigationJump to search

Yocto Project Weekly Status October 8, 2019

Current Dev Position: YP 2.8 M4 Feature Freeze
Next Deadline: YP 3.0 Final Release 25th Oct

SWAT Team Rotation:

  • SWAT lead is currently: Chen
  • SWAT team rotation: Chen -> Paul on Oct. 11, 2019
  • SWAT team rotation: Paul -> Ross on Oct. 18, 2019
    //wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Next Team Meetings:

Key Status/Updates:

  • The project is about to build M4 rc1 once some final tweaks have been tested and merged (details below).
  • Known issues that have been or are to be addressed before M4 rc1 is built:
    • Strace kernel timeout problems - the issue has now been reproduced and understood upstream and a patch has been found to address the issue. We therefore plan to include this in M4 rc1 (thanks Bruce)
    • We upgraded to a new uninative version to ensure compatibility with distros shipping glibc 2.30 (thanks Michael/Armin).
    • We resolved the systemd hwdb postinst script issues (thanks Ross)
  • The eSDK performance issue has been worked around but removal of old sstate artefacts on the system however we ultimately do need to improve the code (will target 3.1).
  • If anyone has any status items for the project they’d like to add to the weekly reports, please email Richard+Stephen.

Planned Releases for YP 3.0 {2.8}:

  • M4 Cutoff 30th Sept - this will be YP 3.0.
  • YP 3.0 {2.8 (M4)} Final Release 25th Oct

Planned upcoming dot releases:

  • YP 2.7.2 (Warrior) is planned for after YP 3.0 release.
  • YP 2.6.4 (Thud) is planned for after YP 2.7.2 release.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives